Text
FORD I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS),,
ACCESSION NBR:9305180223
DOC.DATE: 93/05/06
NOTARIZED: NO
ACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
ERRELLI,D.M.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
VAUGHNPG.E.
Carolina
Power
& Light Co.
DOCKET
05000400
SUBJECT:
Forwards
insp rept 50-400/93-08
on 930320-0416
& notices of
violation
& deviation.
DISTRIBUTION CODE'EOZD
COPIES
RECEIVED'LTR
i
ENCLl SIZE'7 + /
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
05000400
/
F
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
EG FILE
02
RGN
LE
01
EXTERNAL: EG&G/BRYCE,J.H.
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
LE,N
AEOD/DEIB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS1
MORISSEAU,D
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1'
1
1
1
1
1
1
1
1
1
1
1
1
1
YOTE TO ALL "RIDS" RECIPIEYTS
PLEASE HELP US TO REDUCE WASTE! COYTACT THE DOCUMEYT COYTROL DESK.
ROOi~i P I-S7 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DOY'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
Docket No.:
50-400
License No.:
Carolina
Power
and Light Company
ATTN:
Hr. G.,E.
Vaughn'ice
President
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165
- Hail Zone
1
New Hill, NC
27562-0165
Gentlemen:
SUBJECT:
NOTICE OF VIOLATION AND NOTICE OF DEVIATION
(NRC
INSPECTION
REPORT
NO. 50-400/93-08)
This refers to the inspection
conducted
by J.
Tedrow of this office on
March 20 - April 16,
1993.
The inspection
included
a review of activities
authorized for your Harris facility.
At the conclusion of the inspection,
the
findings were discussed
with those
members of your staff identified in the
enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on 'the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
and other activities appeared
to
deviate
from commitments to the
NRC,
as specified in the enclosed
Notic'e of
Violation and Notice of Deviation.
The violation is of concern
because it
involves
a programmatic
weakness
in the inservice testing program.
In
addition, the enclosed
Inspection
Report identifies activities that violated
NRC requirements
that will not be subject to enforcement
action
because
the
licensee's
efforts in identifying and/or correcting the violation meet the
criteria specified in Section VII.B. of the Enforcement Policy.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notices
when preparing your response.
In your
response,
you should document the specific actions
taken
and
any additional
actions you plan to prevent recurrence.
After reviewing your response
to
these
Notices,
including your proposed corrective actions
and the results of
future inspections,
the
NRC will determine
whether further
NRC enforcement
action is necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790, of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses'directed
by this letter and the enclosed
Notices are not subject
to the clearance
procedures
of the Office of Hanagement
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
9305180223
930506
ADQCK 05000400
8
l
Carolina
Power
and Light Company
2
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
Enclosures:
1.
2.
Notice of Deviation
3.
NRC Inspection
Report
cc w/encls:
W.
R. Robinson
Plant Manager
Harris Nuclear Plant
P. 0.
Box 165
New Hill, NC
27562-0165
Mr. H.
W. Habermeyer,
Jr.
Vice President
Nuclear Services
Department
Carolina
Power
& Light Company
P. 0.
Box 1551
- Mail OHS7
Raleigh,
NC
27602
D.
C. McCarthy,
Manager
Regulatory Affairs
Harris Nuclear Project
P. 0.
Box 165
New Hill, NC
27562
H.
Ray Starling
Vice President
- Legal Department
Carolina
Power
and Light Co.
P. 0.
Box 1551
Raleigh,
NC
27602
Dayne
H. Brown, Director
Division of Radiation Protection
N.
C. Department of Environment,
Health
& Natural
Resources
P. 0.
Box 27687
Raleigh,
NC
27611-7687
(cc w/encls cont'd - See
page 3)
ORIGIHAL SIGYED SY
DAVlD tA. VERRELU
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Carolina
Power
and Light Company
(cc w/encls cont'd)
Hs. Gayle
B. Nichols
Staff Counsel
SC Public Service
Commission
P. 0.
Box 11649
Columbia,
SC
29211
bcc w/encls:
H. Christensen,
RII
S. Vias, RII
N. Le,
Document Control
Desk
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
Route
1,
Box 315B
New Hill, NC
27562
MAY -6
f993
RII:D P~
RII~DRP
~
~
GHa ris:tj
HChrjstensen
05/g /93
05/Q /93