ML18010B101
| ML18010B101 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/28/1993 |
| From: | Vaughn G CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-930100, NUDOCS 9306040245 | |
| Download: ML18010B101 (4) | |
Text
ACCELERAT DOCUMENT DIST UT10bl S YS'1'hM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9306040245 DOC.DATE: 93/05/28 NOTARIZED: NO DOCKET ¹ FACZL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Caiolina 05000400 AUTH.NAME AUTHOR AFFILIATION
'VAUGHN,G.E.
Carolina Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "10CFR50.59 Rept for 920101-930201,"
summarizing changes to plant a/or procedures, which change plant as described in FSAR.No tests or experiments conducted during interval which require reporting in encl rept.
DISTRIBUTION CODE:
IE47D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 50.59 Annual Report of Changes, Tests or Experiments Made W out Approv NOTES:Application for permit renewal filed.
05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS
. GD/J3SP/TPAB 0EG FI 02 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
0 6
6 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LE,N AEOD/DOA NRR/DRCH/HHFB RGN2 FILE 01 NSIC COPIES LTTR ENCL 2
2 1
1 1
1 1
1 1
1 D
D D
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 15
0
Carolina Power & Light Company P.O. Box 166 ~ New Hill,NC 27662 G.E.VAUGHN Vice President Harris Nuclear Plant MAY 2 S
1993 Letter Number:
HO-930100 U.S. Nuclear Regulatory Commission ATTN:
NRC Document Control Desk Washington, DC 20555 10CFR50.59 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 REPORT IN ACCORDANCE WITH 10CFR50.59 Gentlemen:
In accordance with 10CFR50.59, the following report is submitted for the period of January 1,
1992 through February 1,
1993 which includes the Harris Plant Refueling Outage ¹4.
This report contains brief summaries of changes to the plant and/or procedures, which change the plant as it is described in the FSAR.
There were no tests or experiments conducted during this interval, which are not described in the FSAR and require reporting in this report.
G.
E. Vaughn, Vice President Harris Nuclear Plant MGW:cmg Enclosure cc:
Mr. S.
D. Ebneter (NRC - RII)
Mr. J.
E. Tedrow (NRC -
SHNPP) 630036 MEM/HO-930100/1/OS1 9306040245 930528 PDR ADOCK 05000400 R