Monthly Operating Rept for Harris Nuclear Power Plant,Unit 1
ML18010B077
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1993
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO931011, NUDOCS 9304190095
Download: ML18010B077 (9)


Text

1 ACCELERATQiP DOCUMENT DIST$UTION SYSTEM REGULAK%FZ INFORMATION DISTRIBUTION SYSTEM (RIDS)

C.':9>>

9 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAWPA.

Carolina Power

& Light Co.

UAUGHNPG.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Mont crating rept for Harris Nuclear Power Plant, unit 1

/930415 tr.

DZSTR1BDTZON CODE:

ZE24D COPTER RECETVED:LTR I ENCLf SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

o5ooo4oo RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 3

3 1

1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1

1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 10 10 AEOD DOA 1

1 pNHR"'D S/OEAB 1

1 iREG FILE ol 1

1 1

1 1

1 1

1 EXTERNAL EGStG BRYCE P J

~ H NSIC 1

1 1

1 NRC PDR 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

0 a

COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Harris Nuctear Plant Aph )

5 iSn File Number:

SHF/10-15505 Letter Number:

H0931011 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT.

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1993.

Yours very truly, G.

E. Vaughn Vice President Harris Nuclear Plant APC:kjc Enclosure cc:

Mr.

ST D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP)

MIS/MTH-OPR.RPT/1/OS4

' 930'41'90095 93033i PDR

'ADOCK 05000400 R

PDR

k

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE'arch 1993 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.76 percent Capacity Factor.

There were no significant power reductions.

There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools.

413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick,Plant.

224 of the spent fuel assemblies are from CP&L's Robinson Plant.

MISXMTH-OPR.RPTX2%0S4

CPAL CO RUNDATE 04/06/93

..RUH TIME 98:57:11 O

INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-488 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2808 UNIT NAME:

HARRIS UNIT 1

NOTES 2.

REPORTING PERIOD:

MARCH 93 See 0 erations Summar 3.

LICENSED THERMAL POWER (MWT): 2775 4.

NAMEPLATE RATING (GROSS MWE): 950.9 I

5.

DESIGN ELECTRICAL RATING (NET MWE): 909.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (NET MWE): 869.0

8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

None.

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

None.

10.

REASONS fOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE 11.

HOURS IH REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR OH LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEH.

(MWH) 17.

GROSS ELEC.

ENERGY GEH.

(MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21.

UNIT CAP.

FACTOR (USING MDC NET) 22.

UNIT CAP.

FACTOR (USIHG DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS None.

744.88 744.09

.00 744.80

.00 2062488.78 699839.98 657527.00 108.09 100.00 182.76 98.29

.09 (TYPE,

DATE, 2160.00 2169.90

.08 2160.00

.09 5921066.34 2018009.00 1894531.ee 1ee.ee 198.80 101.99 97.46

.09 AND DURATION 51865.00 41728.90

.00 41216.18

.00 109272171.78 36432850.09 33900207.00 79.47 79.47 76.99 72.62 3.85 OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS /MTH-OPR. RPT/3/OS 4

~

~

(

g

.Cf bL CO

~NT PERFORMANCE DATA SYSTEM RUN.,DATE 04/06/93 APPENDIX B AVERAGE DAILY POWER LEVEL

.fAJN TIME 98:57:99 HARRIS UNIT 5

~

~

PAGE RPD39-999 MARCH DAY AVG. DAILY POWER LEVEL (MWE-NET) 886 DOCKET NO. 950-409 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2898 DAY AVG. DAILY POWER LEVEL (MWE-NET) 879 885 884 889 88888'8 20 886 889 887 884 880

)9 877 882 885 887 888 886 888 887 885 24 25 27 28 29 30 876 879 882 887 885 885 885 883 882

$.16 8