|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARHNP-99-151, Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr HNP-99-137, Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With HNP-99-126, Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With HNP-99-110, Monthly Operating Rept for June 1999 for Shearon Harris Npp. with1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with HNP-99-099, Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With HNP-99-089, Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With HNP-99-066, Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr HNP-99-047, Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with HNP-99-020, Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With1999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With HNP-99-003, Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with HNP-98-181, Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr HNP-98-164, Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr HNP-98-148, Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With HNP-98-132, Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr HNP-98-114, Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr HNP-98-096, Monthly Operating Rept for June 1998 for Shnpp1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Shnpp ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr HNP-98-085, Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant ML18022B0521998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Shearon Harris Nuclear Power Plant.W/980514 Ltr HNP-98-066, Monthly Operating Rept for Apr 1998 for Shearon Harris Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Shearon Harris Nuclear Power Plant HNP-98-048, Monthly Operating Rept for Mar 1998 for Shnpp1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Shnpp HNP-98-033, Monthly Operating Rept for Feb 1998 for Shnpp1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Shnpp HNP-98-018, Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant HNP-98-004, Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1 ML18016A2651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant.W/971216 Ltr HNP-97-219, Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant ML18016A2291997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Shearon Harris Nuclear Power Plant.W/971114 Ltr HNP-97-207, Monthly Operating Rept for Oct 1997 for Shearon Harris Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Shearon Harris Nuclear Power Plant ML18016A2121997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Shearon Harris Nuclear Power Plant,Unit 1.W/971014 Ltr HNP-97-192, Monthly Operating Rept for Sept 1997 for Shearon Harris Nuclear Power Plant,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Shearon Harris Nuclear Power Plant,Unit 1 HNP-97-173, Monthly Operating Rept for Aug 1997 for Shearon Harris Nuclear Plant1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Shearon Harris Nuclear Plant HNP-97-161, Monthly Operating Rept for July 1997 for Shnpp1997-07-31031 July 1997 Monthly Operating Rept for July 1997 for Shnpp HNP-97-142, Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant ML18012A8131997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Shearon Harris NPP, Unit 1.W/970616 Ltr HNP-97-107, Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant HNP-97-081, Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1 PY-CEI-NRR-2150, Monthly Operating Rept for Feb 1997 for PNPP1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for PNPP HNP-97-061, Monthly Operating Rept for Feb 1997 for Shearon Harris Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Shearon Harris Nuclear Power Plant ML18012A5821997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Shearon Harris Nuclear Power Plant.W/970312 Ltr HNP-97-029, Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant ML18012A5141997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant.W/970214 Ltr HNP-97-001, Monthly Operating Rept for Dec 1996 for Shearon Harris Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Shearon Harris Nuclear Power Plant HNP-96-205, Monthly Operating Rept for Nov 1996 for Shearon Harris Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Shearon Harris Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000400/LER-1999-008-01, :on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With1999-10-0808 October 1999
- on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With
ML18017A8971999-10-0404 October 1999 SER Accepting Licensee Responses to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML18017A9011999-10-0404 October 1999 Safety Evaluation Accepting Rev 99-1 to Harris Nuclear Plant Eals.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 HNP-99-151, Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18017A8741999-09-14014 September 1999 Safety Evaluation Supporting Amend 90 to License NPF-63 ML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr 05000400/LER-1999-007-02, :on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With1999-09-10010 September 1999
- on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With
HNP-99-137, Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr 05000400/LER-1999-006, :on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised1999-08-0404 August 1999
- on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised
HNP-99-126, Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept HNP-99-110, Monthly Operating Rept for June 1999 for Shearon Harris Npp. with1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with ML18016A9941999-06-18018 June 1999 SER Authorizing Licensee Relief Request 2RG-008,pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year Interval of Shearon Harris Nuclear Power Plant ISI Program ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr HNP-99-099, Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. HNP-99-089, Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected 05000400/LER-1999-005, :on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With1999-04-12012 April 1999
- on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With
05000400/LER-1999-004, :on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With1999-04-0808 April 1999
- on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With
ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A9001999-04-0808 April 1999 Safety Evaluation Supporting Amend 88 to License NPF-63 ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. HNP-99-066, Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant HNP-99-047, Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 05000400/LER-1999-003, :on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With1999-02-22022 February 1999
- on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With
ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP C & D 05000400/LER-1999-002, :on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With1999-02-12012 February 1999
- on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With
05000400/LER-1999-001, :on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With1999-02-0505 February 1999
- on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With
ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18022B0631999-02-0404 February 1999 Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings ML20202J1161999-02-0101 February 1999 SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program HNP-99-020, Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With1999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor 05000400/LER-1998-004, :on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor1999-01-29029 January 1999
- on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor
HNP-99-003, Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with HNP-98-181, Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With ML18016A8351998-11-28028 November 1998 ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. HNP-99-086, Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With1998-11-28028 November 1998 Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With ML18016A7411998-11-25025 November 1998 Rev 1 to Shnpp Cycle 9 Colr 05000400/LER-1998-007, :on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With1998-11-17017 November 1998
- on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With
ML18016A7181998-11-0606 November 1998 SER Approving Alternative Method to ASME Code in Regards to Surface Exam of Weld Repairs for Canopy Seals for Shearon Harris Nuclear Power Plant,Unit 1 ML18016A6721998-11-0404 November 1998 Safety Evaluation Authorizing Relief for Requests 2RG-009 & 2R1-010,per 10CFR50.55a(a)(3)(i) 1999-09-30
[Table view] |
Text
1 ACCELERATQiP DOCUMENT DIST$UTION SYSTEM REGULAK%FZ INFORMATION DISTRIBUTION SYSTEM (RIDS)
C.':9>>
9 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAWPA.
Carolina Power
& Light Co.
UAUGHNPG.E.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Mont crating rept for Harris Nuclear Power Plant, unit 1
/930415 tr.
DZSTR1BDTZON CODE:
ZE24D COPTER RECETVED:LTR I ENCLf SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
o5ooo4oo RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 3
3 1
1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 10 10 AEOD DOA 1
1 pNHR"'D S/OEAB 1
1 iREG FILE ol 1
1 1
1 1
1 1
1 EXTERNAL EGStG BRYCE P J
~ H NSIC 1
1 1
1 NRC PDR 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
0 a
COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Harris Nuctear Plant Aph )
5 iSn File Number:
SHF/10-15505 Letter Number:
H0931011 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT.
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1993.
Yours very truly, G.
E. Vaughn Vice President Harris Nuclear Plant APC:kjc Enclosure cc:
Mr.
ST D. Ebneter (NRC-RII)
Mr. J.
E. Tedrow (NRC-SHNPP)
MIS/MTH-OPR.RPT/1/OS4
' 930'41'90095 93033i PDR
'ADOCK 05000400 R
PDR
k
DOCKET NO.:
050-400 UNIT:
Harris Unit 1 DATE'arch 1993 COMPLETED BY:
Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.76 percent Capacity Factor.
There were no significant power reductions.
There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools.
413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick,Plant.
224 of the spent fuel assemblies are from CP&L's Robinson Plant.
MISXMTH-OPR.RPTX2%0S4
CPAL CO RUNDATE 04/06/93
..RUH TIME 98:57:11 O
INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1
PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-488 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2808 UNIT NAME:
HARRIS UNIT 1
NOTES 2.
REPORTING PERIOD:
MARCH 93 See 0 erations Summar 3.
LICENSED THERMAL POWER (MWT): 2775 4.
NAMEPLATE RATING (GROSS MWE): 950.9 I
5.
DESIGN ELECTRICAL RATING (NET MWE): 909.0 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.
MAX DEPENDABLE CAPACITY (NET MWE): 869.0
- 8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
None.
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
None.
10.
REASONS fOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE 11.
HOURS IH REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR OH LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEH.
(MWH) 17.
GROSS ELEC.
ENERGY GEH.
(MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USIHG DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS None.
744.88 744.09
.00 744.80
.00 2062488.78 699839.98 657527.00 108.09 100.00 182.76 98.29
.09 (TYPE,
- DATE, 2160.00 2169.90
.08 2160.00
.09 5921066.34 2018009.00 1894531.ee 1ee.ee 198.80 101.99 97.46
.09 AND DURATION 51865.00 41728.90
.00 41216.18
.00 109272171.78 36432850.09 33900207.00 79.47 79.47 76.99 72.62 3.85 OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS /MTH-OPR. RPT/3/OS 4
~
~
(
g
.Cf bL CO
~NT PERFORMANCE DATA SYSTEM RUN.,DATE 04/06/93 APPENDIX B AVERAGE DAILY POWER LEVEL
.fAJN TIME 98:57:99 HARRIS UNIT 5
~
~
PAGE RPD39-999 MARCH DAY AVG. DAILY POWER LEVEL (MWE-NET) 886 DOCKET NO. 950-409 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2898 DAY AVG. DAILY POWER LEVEL (MWE-NET) 879 885 884 889 88888'8 20 886 889 887 884 880
)9 877 882 885 887 888 886 888 887 885 24 25 27 28 29 30 876 879 882 887 885 885 885 883 882
$.16 8
MIS/MTH-OPR.RPT/4/OS4
0
~
~
~5 1
II
$ >'V I
d 1
E h III t ll N
lg t'
k K
lt II',