Amend 36 to License NPF-63,revising Action Requirements Associated W/Ts 3.1.2.2, Flow Paths Operating, TS 3.1.2.4, Charging Pumps Operating & TS 3.7.1.1, Safety Valves
ML18010B095
Person / Time
Site: Harris 
Issue date: 05/17/1993
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18010B096 List:
References
NPF-63-A-036 NUDOCS 9305200177
Download: ML18010B095 (6)


Text

~

gt q qE0V (4

P c

0 go 0

~0

+>>*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 C

RO INA POWER 8

LIGHT COMPANY et al.

~000005 00 50- 00 SH RO IS NUC AR POW N

UNIT 1

AMENDMENT TO FACI TY OPERATING LICE S Amendment No.

36 License No. NPF-63 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

D.

The application for amendment by Carolina Power 8I Light Company (the licensee),

dated December 28,

1990, as supplemented April 10,
1991, September 29,
1992, and February 10,
1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; r

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 2.

E. 'he issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

0'ccordingly, the license is amended by changes to the Technical Specifications,.

as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No.

NPF-63 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Pla The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached

hereto, as revised through Amendment No. 36 are hereby incorporated into this license.

Carolina Power 8 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

t'9305200i77 9305i7

'PDR ADQCK 05000400 PDR

3.

This license amendment is effective as of the date of its issuance and shall be-implemented within 30 days of issuance FOR THE NUCLEAR REGULATORY COMMISSION Attachments:

Changes to the Technical Specifications Date of Issuance:

May ]7

)993 Elinor G ~ Adensam, Director Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

ATTACHMENT TO ICENS AMENOM NT NO. 36 FAC TY OPERATING LICENSE NO.

NPF-63

~00000 00.

50-4 0

Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.

The revised areas are indicated by marginal lines.

Remove Pa es 3/4 1-8 3/4 1-10 3/4 7-1 Insert Pa es 3/4 1-8 3/4 1-10 3/4 7-1

REACTIVITY CONTROL SYSTEMS FLOW PATHS OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.2't least two of the following three boron injection flow paths shall be OPERABLE:

a.

The flow path from the boric acid tank via a boric acid transfer pump and a charging/safety injection pump to the Reactor Coolant System (RCS),

and b.

Two flow paths from the refueling water storage tank via charging/

safety injection pumps to the RCS.

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:

With only one of the above required boron injection flow paths to the RCS OPERABLE, restore at least two boron injection flow paths to the RCS to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN as required by Figure 3.1-1 at 200'F within the next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s> restore at least two flow paths to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.1.2.2 At least two of the above required flow paths shall be demonstrated OPERABLE:

a A At least once per 7 days by verifying that the temperature of the flow path between the boric acid tank and the charging/safety injec-tion pump suction header tank is greater than or equal to 65'F when a flow path from the boric acid tank is used; b.

C ~

At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked,

sealed, or otherwise secured in position, is in its correct position; At least once per 18 months during shutdown by verifying that each automatic valve in the flow path actuates to its correct position on a safety injection test signal; and d.

At least once per 18 months by verifying that the flow path required by Specification 3.1.2.2a.

delivers at least 30 gpm to the RCS.

SHEARON HARRIS - UNIT 1 3/4 1-8 Amendment No.

7>

36

REACTIVITY CONTROL SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION

3. 1.2.4 At l,east two charging/safety injection pumps shall be OPERABLE.

APPLICABILITY:

MODES i, 2, and 3.

ACTION:

With only one charging/safety injection pump OPERABLE, restore at least two charging/safety injection pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a

SHUTDOWN MARGIN as required by Figure 3.1-1 at 200'F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging/safety injection pumps to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.1.2.4 At least two charging/safety injection pumps shall be demonstrated OPERABLE by verifying, on recirculation flow or in service supplying flow to the Reactor Coolant System and reactor coolant pump seals, that a differential pressure across each pump of greater than or equal to 2446 psid is developed when tested pursuant to Specification 4.0.5.

SHEARON HARRIS - UNIT 1 3/4 1-10 Amendment No. 7> 36

3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITINC CONDITION FOR OPERATION 3.7.1.1 All main steam line Code safety valves associated with each steam generator shall be OPERABLE with lift settings as specified in Table 3.7-2

~

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:

a

~

b ~

With one or more main steam 1.ine Code safety valves inoperable, operation may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or the Power Range Neutron Flux High Trip Setpoint is reduced per Table 3.7-1> otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.7.1.1 No additional requirements other than those required by Specification 4.0.5.

SHEARON HARRIS - UNIT 1 3/4 7-1 Amendment No. 36