Monthly Operating Rept for Apr 1993 for Harris Nuclear Power Plant,Unit 1
ML18010B090
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1993
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
H0931017, H931017, NUDOCS 9305180347
Download: ML18010B090 (9)


Text

ACCEI ERAT DOCUMENT DIST UTION SYSTEM REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.

Carolina Power 6 Light Co.

VAUGHNPG.E.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 or Apr 1993 for Harris Nuclear Power r.

SUBJECT:

Monthly opera Plant, unit

. /930514 DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR r

ENCL L SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

D NOTES:Application for permit renewal filed.

osooo4oo j A

RECIPIENT ID CODE/NAME PD2-1 LA LEPN INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL:

EGSrG BRYCE,J.H NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA RR/J)ORS/OEAB REG F'IEE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACI'HEDOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

'I 0

t J

CMiL Carolina Power & Light Company P.O. Box 165 ~ New Hitl, NC 27562 G.E. VAUGHN Vce President Hants Nudear Phnt MAY 1

4 1995 File Number:

SHF/10-15505 Letter Number:

H0931017 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of April 1993.

Yours very truly, Vice President Harris Nuclear Plant APC:kjc Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP)

MIS/MTH-OPR.RPT/1/OS4 930Sl80347 930430 "PDR ADQCK 05000400 R

PDR

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE:

April 1993 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.59 percent Capacity Factor.

There were no significant power reductions.

There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools.

413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.

224 of the spent fuel assemblies are from CP&L's Robinson Plant.

MISXMTH-OPR.RPT$2%0S4

$ I%

COL-CO RUH DATE 65/16/93 RUN TIME

)5:57:5<

HT PERFORMANCE DATA SYSTEM OPERATIHG DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-460 COMPLETED BY AMANDA CREHBHAW TELEPHONE (919)362-2868 k

2 j 3 l 5 k 6.

7.

8.

UNIT NAME:

HARRIS UN1T 1

NOTES REPORTIHG PERIOD:

APRIL 93 See Operations Summary LICENSED THERMAL POWER (MWT): 2775 I

HAMEPLATE RATING (GROSS MWE): 950.9 I

DESIGN ELECTRICAL RATING (NET MWE): 900.0 MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 MAX DEPENDABLE CAPACITY (HET MWE): 860.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:None.

10.

POWER LEVEL TO WHICH RESTRICTED IF ANY (HET MWE): None.

REASONS FOR RESTRICTION IF AHY:

N/A THIS MONTH YR TO DATE CUMUL ATIVE

$ 2.

13.

34.

15.

<6.

17.

38*

19.

20, 2(.

22.

23.

24.

25.

26.

HOURS IH REPORTING PERIOD 739.66 2879.00 52584.00 NUMBER OF HOURS REACTOR CRITICAL 719.66 2879.60 42447.90 REACTOR RESERVE SHUTDOWH HRS

.06

.06

.06 HOURS GENERATOR OH LINE 719.66 2879.06 41935.18 UNIT RESERVE SHUTDOWN HOURS

.66

.00

.06 GROSS THERMAL ENERGY GEH.

(MWH)

$ 993231.44 7914297.78 331265463.22 GROSS ELEC.

ENERGY GEH.

(MWH>

674278.00 2692287.00 37)07)28.66 NET ELEC.

ENERGY GENERATED (MWH) 634366.00 2528897.00 34534573.60 UNIT SERVICE FACTOR 166.66

<66.66 79.75 UNIT AVAILABILITYFACTOR 166.66 166.66 79.75 UHIT CAP.

FACTOR (USING MDC HET>

102.59 162.34 76.37 UNIT CAP.

FACTOR (USING DER HET) 98.03 97.60 72.97 UNIT FORCED OUTAGE RATE

.00

.00 3.79 SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS (TYPE,

DATE, AHD DURAT1'OH OF EACH):

Planned outage scheduled to begin May 21 at 2200 to repair blowdown valve

(

(BD-8) and perform other secondary plant maintenance activities.

Unit scheduled to return to 100/ power on May 24.

IF SHUTDOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF START UP:

UHITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.36 9

MIS/MTH-OPR.RPT/3/OS4

5

r

.CPkL'- CO

~NT PERFORMANCE DATA SYSTEM RUN DATE 05/06/93 APPE75IX B AVERAGE DAILY POWER LEVEM RUN TIME 30:39:23 HARRIS UNIT PAGE RPD39-000 APRIL

'993 DAY AVG. DAILY POWER LEVEL (MWE-NET)

DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-NET) 877 885 879 884 886 887 17 18 20 22 889 889 886 879 880 10 888 887 884 882 883 880 26 885 880 874 876 885 886 886 878 873 874 30 882 878 1.16 - 8 MIS/MTH-OPR.RPT/4/OS4

0

'