ML18010B047
| ML18010B047 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/26/1993 |
| From: | Mccarthy D CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NLS-93-051, NLS-93-51, NUDOCS 9303090118 | |
| Download: ML18010B047 (4) | |
Text
ACCEI ERATFki9 DOCUMENT DIST UTION SYSTEM REGULARLY INFORMATION DISTRIBUTI SYSTEM (RIDS)
~ 9 ACCESSION NQR:9303090118 DOC.DATE: 93/02/26 NOTARIZED:
NO DOCKET FACIL:80-'00 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILlATION MCCARTHY,D.C.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Documents request for extension for submittal of response to request for addi info re ODCM for 60 days.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution D
NOTES:Application for permit renewal filed.
05000400
/
RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DORS/OTSB NRR/DSSA/SCSB NRR/DSSA/SRXB OC R ~ILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-1 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 Nslc COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CON'I'ACI'IIEDOCUMEN'I'ON'I'ROLDINK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRII3UTION LISTS FOR DOCUMEN'I'S YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL gr I
II i>
>xi y
,A
'f I
I 1a k
1 4i'l) l 1
j y~t
CNK Carolina Power 8 Light Company
'FEB 36 i993 SERIAL'LS-93-051 United States Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63
RESPONSE
TO REQUEST FOR ADDITIONALINFORMATION REGARDING THE SHNPP OFFSITE DOSE CALCULATION MANUAL Gentlemen:
Carolina Power 6 Light Company (CP&L) is in receipt: of your November 25, 1992 request for additional information regarding the Shearon Harris Nuclear Power Plant (SHNPP) Offsite Dose Calculation Manual (ODCM).
Your letter requested that CP&L respond within 90 days of receipt of the request and CP&L is proceeding with preparation of our response.
On January 29,
- 1993, we discussed with the NRC Project Manager a request to extend the submittal schedule for our response by 60 days.
This correspondence serves as confirmation of that discussion and documents the schedule extension agreed to by the Project Manager.
The extension request is the result of other immediate demands on our resources, such as our implementation of the new 10 CFR 20 Rule and preparation of the Semiannual Effluent Release Report.
- However, the information 'requested in your November 25, 1992 request is not likely to warrant any immediate changes to the ODCM.
Therefore, there should be no adverse impact associated with a schedule extension.
Questions regarding this matter may be referred to Mr. R.
W. Prunty at (919) 546-7318.
Yours very truly, 050038 D.
C. McCarthy Manager Nuclear Licensing Section DCM/SDC cc:
Mr. S.
D. Ebneter Mr. N. B. Le Mr. J.
E. Tedrow 411 9303090118 930226 PDR
'ADOCK 05000400""
PDR etteville Slreet
~ P. O. Box 1551 o Raleigh. N. C. 27602
/+
~ )