ACCEI-ERA D DOCUMENT DIST UTION SYSTEM REGULA RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)
FACIE 50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power
& Light Co.
VAUGHNiG.E.
Carolina Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operatin apt for May 1993 for Harris Nuclear Plant, unit 1
tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRPW/OEAB RGN2 EXTERNAL: EGGG BRYCEgJ.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA N R/
IL/RPEB REG FIL 01
'NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTBI CONTACI'HBDOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
"'t COLL Carolina Power & Light ComPany P.O. Box 165 ~ New Hill,NC 27562'.E.VAUGHN Vice President Hants Nudear Plant sun C t9n File Number:
SHF/10-15505 Letter Number:
H0931019 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1993.
G.
E. Vaughn Vice President Harris Nuclear Plant APC: kjc Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. J.
E. Tedrow (NRC-SHNPP)
MIS/MTH-OPR.RPT/1/OS4
'tl'306i70396 9'3053i
- PDR ADOCK 05000400 1'i R
C 4
I
DOCKET NO.:
050-400 UNIT:
Harris Unit 1 DATE:
May 1993 COMPLETED BY:
Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 94.82 percent Availability Factor for the referenced month and a
91.99 percent Capacity Factor.
There was one significant power reduction.
There are 157 fuel assemblies in the reactor vessel and 895 spent fuel assemblies stored in the spent fuel pools.
447 of the spent fuel assemblies are BWR, which were.shipped to Harris from CP6L's Brunswick Plant.
224 of the spent fuel assemblies are from CP&L's Robinson Plant.
MISXMTH-OPR.RPT/2$0S4
CPAL CO RUN DATE 06/05'/5'3 RUH TIME 99: 38:
3 9 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT
)
PAGE RPD36-909 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY AMANDA CREHSHAM TELEPHONE (919)362-2898 UNIT NAME:
HARRIS UNIT
)
NOTES 2.
REPORTING PERIOD:
NAY 5'3 See Operations Summary.
3.
LICENSED THERNAL POWER (NWT): 2775 I
4.
NAMEPLATE RATING (GROSS MWE): 5'50;9 5.
DESIGN ELECTRICAL RATIHG (HET MWE): 900.9 I
6.
NAX DEPENDABLE CAPACITY (GROSS MME): 5'20.0 7.
NAX DEPEHDABLE CAPACITY (NET MWE): 869.0 8
IF CHAHGES OCCUR IH CAPACITY RATIHGS
( ITEMS 3 THRU 7)
SINCE LAST REPORT g
GIVE REASONS:
None.
PQWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
39.
REASONS FOR RESTRICTION IF AHY:
N/A None.
THIS MOHTH YR TO DATE CUNUL ATIVE HOURS IN REPORTING PERIOD f2.
NUMBER QF HOURS REACTOR CRITICAL
[ 3.
REACTOR RESERVE'HUTDOMH HRS 14, HOURS GENERATOR OH LIHE UNIT RESERVE.SHUTDOWN HOURS (6.
GROSS THERNAI ENERGY GEH.
(MMH) 37.
GRQSS ELEC.
ENERGY GEN.
(MWH) i8.
HET ELEC.
EHERGY GEHERATED (MWH)
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC HET)
?2.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER HEXT 6 MOHTHS None.
744.00 737.4f
.09 705.45
.00 1868829.39 6285'76.00 58857$.99 94.82 94.82 91.
95'7.5'0
.00 (TYPE,
- DATE, 3623.90 3596.41
.09 3584.45
.00 9783127.98 3323263.99 3117468.99 5'8. 94 98.94 199.95 5'5. 63
.00 AND DURATION 53328.00 43365.3f
.90 42640.63
.09 313134232.52 37736194.99 35123144.99 75'. 96 75'. '96 76.58 73.18 3.73 OF EACH):
25.
IF SHUTDOWH AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UHITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY'NITIAL ELECTRICITY COMMERCIAL OPE RATION
$.$ 6 - 9 MIS/KZH-OPR.RPT/3/OS4
CPiNL CO, RUN, DATE 06/09/93 RUN TIME 09: 38: 09 PLANT PERFORMANCE DATA SYSTEM APPENDIX B AVERAGE DAILY POWER LEVEL HARRIS UNIT 3
PAGE RPD39-000 MAY DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-NET)
DAY AVG. DAILY POWEP, LEVEL (MWE-NET) 878
$ 7 871 863 877 18 865 870 871 873 87$
872 20 2j 879 590 "40 873 24 480 30 871 867 25 27 857 866 870 868 879 873 870 862 869 865 3.$ 6 8
MIS/MTH-OPR.RPT/4/OS4
R IO
~
~
O C
Rz UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: May 1993 UNIT NAME:
Harris DATE:
06/07/93 COMPLETED BY: A: P. Crenshaw TELEPHONE:
(919) 362-2808 No.
Date T1 y
P e
Duration (Hours) 0 Method of Shutting Down Reactor' Licensee Event Report ¹ System Code 4 Component Code 5 Cause and Corrective Action to Prevent Recurrence 93%03 930521 38.55 8
N/A Hl VALVE Reduced load to 15% to investigate and repair a leak on 1BD-8 Blowdown Valve. It was later determined that dose levels were
'oo high around the valve to repair on-line.
The unit went offline on 05-22-93 at 0007.
Maintenance was also performed on the "A" Condensate Pump, the "B" Condensate Booster Pump, "A" Heater Drain Pump and 1FW-159 Feedwater Valve. The reactor was critical on 05-23-93 at 0319 and synchronized to the grid at 1440.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG<161) 5 Exhibit 1 -Same Source
0 k
4