ACCEIERAT DOCUMENT DIST UTION SYSTEM REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS) k\\
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHGR AFFILIATION CRENSHAWiA.
Carolina Power
& Light Co.
VAUGHN,G.E.
Carolina Power,a Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operati ~
t for Feb 1993 for Harris Nuclear Plant, unit 1.W 930315 r.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
U NOTES:Application for permit renewal filed.
05000400 D
RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL EGStG BRYCEiJ H NSIC COPIES LTTR ENCL 3
3 1
1 10
-10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/DORS/OEAB
~RE Ol NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
S NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DONT NEED!
D S
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
-0 t
1
~ t."
/
I C
)
l 1
n,t CHILL Carolina Power & Light Company P.O. Box t65 ~ New Hill, NC 27562 G.E.VAUGHN Vkxr President Harris Nuetear Plant MAR 7 5
f995 File Number:
SHF/10-15505 Letter Number:
H0931007 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1993.
Yours very truly, G.
E. Vaughn Vice President Harris Nuclear Plant APC:kjc Enclosure r
cc:
'Mr. S.
D. Ebneter (NRC-RII)
Mr. J.
E. Tedrow (NRC-SHNPP)
'st303i70242 930228 PDR ADOCK 05000400 R
PDR MIS/MTH-OPR.RPT/1/OS4 y80009
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
050-400 Harris Unit 1 February 1993 Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.34 percent Capacity Factor.
There was,one significant power reduction.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools.
413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.
224 of the spent fuel assemblies are from CP&L's Robinson Plant.
MISXMTH-OPR.RPTQ240S4
I 1,
OC
~
J
~
CPh'0
'RUN DATE 03/85/93 RUH TINE 69-33: 38 4
NT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1
PAGE RPD36-080 OPERATING STATUS DOCKET NO. 050-460 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2888 UNIT NAME:
HARRIS UNIT 3
NOTES 2.
REPORTIHG PERIOD:
FEBRUARY 93 I
3.
LICENSED THERMAL POWER (MWT): 2775 See Operations Summary.
4.
NAMEPLATE RATING (GROSS MWE): 950.9 I
5.
DESIGN ELECTRICAL RATING (NET NWE): 900.6 6.
NAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.
MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
None.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET NWE):
<<ne
~
18.
REASONS FOR RESTRICTIOH IF ANY:
N/A THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL
$ 3.
REACTOR RESERVE SHUTDOWN HRS
$ 4.
HOURS GENERATOR OH LINE 15.
UNIT RESERVE SHUTDOWN HOURS 36.
GROSS THERMAL ENERGY GEH.
<MWH) 37.
GROSS ELEC.
ENERGY GEH.
(NWH) 18.
NET ELEC.
ENERGY GENERATED (NWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 23.
UNIT CAP.
FACTOR (USING NDC NET) 22.
UNIT CAP.
FACTOR (USING DER HET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS None.
672.00 672.60
.00 672.80
.00 1852012.86 638157.68 593425.66 186.80 188.68 362.34 97.79
.00
<TYPE,
- DATE,
<416.88 3436.86
.00 1416.68
.00 3858577.56 1338176.08
$ 237664.86
<66.86 168.68 181.58 97.07
.08 AND DURATION 53 <2$.68 40984.90
.00 46472.18
.08 187289683.66 35733611.00 33242680.00 79.37 79.37 75.6f 72.25 3.92 OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED E
INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
$.16 - 9 MIS/MTH-OPR.RPT/3/OS4
~
w
']jL jjg I I 'hj,. I, jff)rjfh <<I'jhl,!
II I'H..i
/ it f j)
I Ihhfl I Pf)8 h
5 P"j>'
I'I, jrf Iw j,
<<I g
"l',I'I4 Ai
'twtt
,J I jlf fftf Iiw If off III I I 4 w=ff jh I
jjrl,) Ij I) ff ii j <<<<'l f
ii i,
>><<jf
$j fl'l w
ih I
w
'iii<<
il lhfi I' j>>
lit I jij I
Ii 7
<< I'
CP8L CO P~HT PERFORMANCE DATA SYSTEM RUH 'SATE 03/05/93 APPE~
B AVERAGE DAILY POWER LEV~
K6H TIME 09: 33: 37 HARRIS UNIT f 4
PAGE
'RPD39-000 FEBRUARY 3993
-DAY AVG. DAILY POWER LEVEL (MWE-NET)
DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-HET) 10 879 887 886 887 885 888 885'88 883 888 890 890 8'90 2Q 23 22 25 27 28 890 890 893 889 886 881 889 89[
762 815 886 888 886 1.16 8
HIS/NTH OPR.RPT/4/OS4
4 CP 41
, ~ 4 4 II 4
P g
~
~ 4 44 p
C'l C
4, r
/)
PP 4'>P
\\
4 4
'4 44 4
UNIT SHUTDOWNS AND POWER REDUCTION O
O REPORT MONTH: February 1993 UNIT NAME:
Harris DATE:
03/03/93 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 No.
93402 Date 930225 Tl y
p e
Duration (Hours) 0.0 R~
e a
s 0
n A
Method of Shutting Down Reactor'icensee Event Report ¹ N/A System Code 4 HH Component Code 5 PUMP Cause and Corrective Action to Prevent Recurrence Reduced unit power to a minimum of 82% following trips of the "A" and then the "B" Heater Drain Pumps (HDP).
The "A" HDP tripped following a level perturbation in the 4A
.Feedwater Heater (FWH). The "B" HDP then tripped on low net positive suction head (NPSH) a short time later.
The cause of the level perturbation and the 4A FWH and low NPSH is still under investigation.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5 Exhibit 1 -Same Source
.e J
~ l g
'l
~
fa P