Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207R638 + (00:43:08, 7 December 2024)
- ML20207R632 + (00:43:09, 7 December 2024)
- IR 05000263/1987003 + (00:43:13, 7 December 2024)
- 05000155/LER-1987-004-01, :on 870203,two of Six Snubbers Tested Failed to Meet Max Drag Force Requirements.Cause Will Not Be Determined Until Snubber Mfg Examines Units.Failed Snubbers Returned to Mfg for Exam & Replaced W/Spares + (00:43:15, 7 December 2024)
- ML20207R624 + (00:43:16, 7 December 2024)
- ML20207R620 + (00:43:17, 7 December 2024)
- ML20207R617 + (00:43:20, 7 December 2024)
- 05000414/LER-1987-004-01, :on 870130,numerous Tech Spec Surveillances for Unit Missed.Caused by Personnel Error.Incident Reviewed W/Personnel Involved W/Emphasis That Required Surveillance Must Be Performed within Proper Time Interval + (00:43:22, 7 December 2024)
- ML20207R609 + (00:43:24, 7 December 2024)
- ML20207R608 + (00:43:24, 7 December 2024)
- 3F0387-05, Revises Response to Violations Noted in Insp Rept 50-302/86-39.Temporary Mod T86-06-20-01 Re Temp Hot Channel C Removed.Util Confirmed That Procedure Used to Develop MAR Adequately Addressed Need to Document Refs + (00:43:25, 7 December 2024)
- ML20207R602 + (00:43:25, 7 December 2024)
- ML20207R599 + (00:43:26, 7 December 2024)
- ML20207R595 + (00:43:27, 7 December 2024)
- 05000331/LER-1987-002, :on 870214,automatic Isolation of Control Bldg Ventilation Sys & Initiation of Standby Filter B Occurred. Caused by Incorrect Setting of Downscale Trip Point of Radiation Monitor.Trip Point Lowered + (00:43:29, 7 December 2024)
- ML20207R589 + (00:43:30, 7 December 2024)
- U-600875, Monthly Operating Rept for Feb 1987 + (00:43:31, 7 December 2024)
- B12449, Part 21 Rept Re Noryl Plastic Insulation Deterioration on Bus Bars in Certain Metaclad Switchgear at Facility. Switchgears Used in safety-related Circuits Will Be Inspected & Repaired During Refueling Outage in Nov 1987 + (00:43:32, 7 December 2024)
- ML20207R576 + (00:43:33, 7 December 2024)
- ML20207R575 + (00:43:33, 7 December 2024)
- ML20207R574 + (00:43:34, 7 December 2024)
- 05000250/LER-1987-008, :on 870211,w/unit at 96% Power,Control Room Ventilation & Containment Vent Isolation Occurred.Ground Caused Electrical Transient Initiating Spike.Radiation Monitors Reset & Grounded Cable Repaired + (00:43:36, 7 December 2024)
- ML20207R561 + (00:43:37, 7 December 2024)
- PNO-III-87-034, on 870311,imaging Device Containing Sealed I-125 Source Stolen from Vehicle of Licensee Sales Representative.Device Does Not Represent Safety Hazard Unless Tampered.Public Alerted of Potential Hazard + (00:43:38, 7 December 2024)
- ML20207R548 + (00:43:39, 7 December 2024)
- ML20207R556 + (00:43:39, 7 December 2024)
- B12455, Informs That Annual Emergency Preparedness Exercise Will Be Conducted on 870527.Listed Info Re NRC Personnel Attending Exercise Requested by 870401.Exercise Objectives & Schedule Encl + (00:43:40, 7 December 2024)
- ML20207R545 + (00:43:40, 7 December 2024)
- ML20207R531 + (00:43:45, 7 December 2024)
- 05000414/LER-1987-005-01, :on 870202,steam Generator 2D Blowdown Containment Isolation Valve Failed to Meet Stroke Time. Caused by Mgt/Qa Deficiency Resulting in Erroneous Tech Spec Interpretation.Interpretation Deleted + (00:43:47, 7 December 2024)
- ML20207R515 + (00:43:48, 7 December 2024)
- 05000335/LER-1987-003-02, :on 870212,spurious Safety Injection Signal on Train a & Containment Isolation Actuation Signal Occurred. Caused by Maint Supervisor Bumping Panel Containing Relays. Signals Reset + (00:43:51, 7 December 2024)
- ML20207R506 + (00:43:52, 7 December 2024)
- ML20207R505 + (00:43:52, 7 December 2024)
- ML20207R497 + (00:43:53, 7 December 2024)
- ML20207R494 + (00:43:57, 7 December 2024)
- ST-HL-AE-1975, Forwards Response Spectrum Piping Stress Analysis Using Multiple Support Input Response Spectra W/Asme Code Case N-411 Damping, Summary Rept,Per 870122 Commitment.Util Intends to Maintain Current Calculations Based on Study + (00:43:58, 7 December 2024)
- 05000295/LER-1987-004-03, ,on 870212,reactor Tripped When Instrument Power Fuses Removed W/Level Trip Switch in Normal Position. Caused by Personnel Failure to Verify Procedures & Miscommunication.Engineer Counseled + (00:44:01, 7 December 2024)
- ML20207R485 + (00:44:02, 7 December 2024)
- ML20207R484 + (00:44:02, 7 December 2024)
- ML20207R481 + (00:44:03, 7 December 2024)
- ML20207R479 + (00:44:04, 7 December 2024)
- ML20207R480 + (00:44:04, 7 December 2024)
- ML20207R476 + (00:44:05, 7 December 2024)
- ML20207R467 + (00:44:06, 7 December 2024)
- ML20207R469 + (00:44:06, 7 December 2024)
- ML20207R457 + (00:44:07, 7 December 2024)
- ML20207R456 + (00:44:23, 7 December 2024)
- ML20207R454 + (00:44:29, 7 December 2024)
- ML20207R452 + (00:44:30, 7 December 2024)
- 05000440/LER-1987-007, :on 870213,pressure Transient Occurred within Reactor Vessel Level Instrument Rack Resulting in Redundant Reactivity Control Sys (RRCS) Alternate Rod Insertion.Caused by Design Configurations of RRCS Instruments + (00:44:38, 7 December 2024)
- 05000395/LER-1987-001, :on 870216,shift Supervisor Observed That Pressurizer Relief Tank Had Been Vented to Shutdown Waste Gas Decay Tank Due to Valve Leakage in Tank.Cause Not Stated.Procedure Revs Initiated + (00:44:45, 7 December 2024)