Georgia Pown Company

. g 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-6526 Malhng Address:

Post Office Box 4545 Atlanta, Georgia 30302 Georgia Power L. T. Gucwa the southryn eMirc sysmm Manager Nuc! ear Safety and Licensing SL-2122 1195C March 6,1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 nUTSTANDING S'JBMITTALS LIST Gentlemen:

Enclosed plea::e find an updated listing of those items of correspondence with the NRC to which a written response is expected. The enclosure is tabulated chronologically by Georgia Power Company's sut:nittal date. Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you may have regarding these licensing issues.

Georgia Power Company acknowledges and appreciates the recent NRC cfforts to comp *iete licensing action on our submittal related to battery load profile.

If you have any questions in this regard, please contact this office at any time.

Sincerely,

  1. 4A~~

L. T. Gucwa MJD/lc c: Georgia Power Company U. S. Nuclear Regulatory Commission Mr. i . P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr. Inspector - Hatch GO-NORMS Mr. G. Rivenbark, Licensing Project f Manager - Hatch II I

B703170411 B70306 PDR P

ADOCK 05000321 PDR

POCO No. 1 03/05/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-2122 l LETTER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT

, N ITEM ADDED SINCE LAST REPORT 09/12/84 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION i 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366 PROPOSED CHANGES TO ISI PROGRAM

01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS i 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME i
01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SHIFT OVERTIME REQUIREMENTS ,

01/07/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL

02/17/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - REORGANIZATION

- RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, ENVIRONMENTAL TECHNICAL SPECIFICATIONS, MET TOWER LOCATION, l

QA RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING

. LICENSE VICE CONSTRUCTION PERMIT

' 03/13/86 321,366 REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS - GENERIC LETTER 83-08 l

03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EQUALIZING

- REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS I 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - EMERGENCY POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15

_.~___..,.,ov.m.,,.--.___ ..,,,,,,,,y..,,.,m_--,,,,_,_,,,_.m,, wm._m _.,.,_,_,...%,. .,m,, ---,,,_m vm.y-,_, ,--,, - - _ _

FOOO No. 2 03/05/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC j ENCLOSURE TO SL-2122

LETTER UNIT SUBJECT DATE 04/04/86 366 PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCORPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES 1

05/16/86 321,366 PROPOSED TECHNICAL SPECIFICATIONS - PLANT REVIEW BOARD AND SAFETY REVIEW BOARD COMPOSITION AND QUORUM, AUDIT REQUIREMENTS, MANAGEMENT REPORTING RELATIONSHIPS 06/20/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE 08/19/86 366 C CHANGE TO TECHNICAL SPECIFICATION - BATTERY LOAD PROFILE

, 08/25/86 321,366 CHANGE TO RWCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS -

HIGH TEMPERATURE ISOLATION l 09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 09/09/86 321 PROPOSED TECHNICAL SPECIFICATION CHANGE - REFUELING INTERLOCK SURVEILLANCE 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION i

COMPLIANCE - ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS 10/27/86 321,366 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS - DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE

! 11/06/86 321 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION - COMMENTS REGARDING IGSCC INSPECTION AND REPAIR - UT SUBCONTRACTORS 11/14/86 321 INSERVICE INSPECTION RELIEF REQUEST TO CLOSE OUT FIRST 10 YEAR ISI INTERVAL 11/14/86 321,366 RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION -

CABLE TRAY SUPPORTS l

12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEW 4

! 02/06/87 321 0 PROPOSED ATWS TECHNICAL SPECIFICATIONS - BORON CONCENTRATION IN STANDBY LIQUID CONTROL 02/13/87 321,366 O PROPOSED AMENDMENT TO TECHNICAL SPECIFICATIONS - LEAD TEST ASSEMBLIES - SCRAM TIME, MCPR, MAPLHGR i 02/13/87 321,366 N REQUEST TO REVISE REPORTING REQUIREMENT TECHNICAL 4 SPECIFICATIONS TO FIT LICENSEE EVENT REPORT REQUIREMENTS

a _ _- ,_ * -a--.--, e_ m _. 2_

4 e

  • PCCO No. 3 03/05/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-2122 LETTER UNIT SUBJECT DATE 02/20/87 321 O INSERVICE INSPECTION PLAN FOR NEXT HNP-1 OUTAGE - AUSTENETIC STAINLESS STEEL 03/04/87 321,366 O PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - APPENDIX J VALVES 03/04/87 321,366 O CHANGES TO TECHNICAL SPECIFICATIONS - NUCLEAR HYDRO i..