ML20207R506

From kanterella
Jump to navigation Jump to search
Corrected Tech Spec Page 3/4 1-11,correcting Typo in Heading
ML20207R506
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/07/1987
From:
NRC
To:
Shared Package
ML20207R472 List:
References
NUDOCS 8703170299
Download: ML20207R506 (1)


Text

,

, REACTIVITY CONTROL. SYSTEMS CHARGING PUMP - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.

APPLICABILITY: MODES S and 6.

ACTION:

With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until one charging pump is restored to OPERABLE status.

SURVEILLANCE RE0VIREMENTS 4.1.2.3 The above required charging pump shall be demonstrated OPERABLE by verifying, that on recirculation flow, each pump develops a dif feren-tial pressure of >2400 psid when tested pursuant to Specification 4.0.5.

E l

l l

l i TRO,lAN-UNIT 1 3/4 1-11 Amendment No. 74,123 Correction letter Dated: 1/7/87 l

G703170299 870306 PDR ADOCK 05000344 *

.P ,

PDR _ _ - . _ . , _ _ _ _ _ _ . . _ _ _ _ _ . _ _ . _ _ _ _ _