March 12, 1987 o
Docket No. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
GENERIC LETTER 83-28, ITEM 4.5.1 The staff has completed its review of your response to Generic Letter 83-28, Item 4.5.1 relating to the required actions based on the generic implicationsoftbeSalemATWSevents. The staff agrees that the Fort St.
Vrain (FSV) reactor trip system is not the same as those of BWRs and PWRs.
Also, the staff agrees that FSV has diverse reactor shutdown capability which is independent of the system normally used in emergencies.
The staff has reviewed the FSV surveillance requirement, established to assure control rod and reserve shutdown system reliability, provided in your letter dated June 7, 1985 and concludes that the reliability verification testing for the FSV reactor trip shutdown systems is acceptable.
The staff's Safety Evaluation is enclosed.
Sincerely, Original signed by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION:
Docket Filec PNoonan FMiraglia HThompson NRC PDR' DScaletti OGC-BETH ACRS (10)
Local PDR KHeitner EJordan PBSS Reading 0 Lynch BGrimes HBerkow JPartlow
/dak PBSS PBSS P,BjS PB C (PNoonan DScaletti KHeitner:ac Olynch H
w 03/\\\\ /87 03/It/87 03/lj/87 03/[L/87 03/p/87 8703170490 870312 DR ADOCK 05000267 PDR
4
[
'c, UNITED STATES E j.#c [i NUCLEAR REGULATORY COMMISSION g
W ASHINGTON, O C. 20555 March 12, 1987 Docket ho. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
GENERIC LETTER 83-78, ITEM 4.5.1 The staff has completed its review of your response to Generic Letter 83-28, Item 4.5.1, relating to the reoutred actions based on the generic implicaticrs of the Salem ATWS events. The staff agrees that the Fort St.
Vrain (FSV) reactor trip system is not the same as those of PWRs and PWRs.
Also, the staff agrees that FSV has diverse reactor shutdown capability which is independent of the system normally used in emergencies.
The staff has reviewed the FSV surveillance requirement, established to assure control rod and reserve shutdown system reliability, provided in your letter dated June 7,1985 and concludes that the reliability verification testing for the FSV reacter trip shutdown systens is acceptable.
The staff's Safety Evaluation is enclosed.
Sincerely,
- LJLM, Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page
Mr. R. O. Williams Public Service Company of Colorado Fort St. Vrain CC:
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Divisfor Padiation Ccntrol Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box E40 Cenver, Colorado E0220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. R. O. Willicms, Acting Fanager GA Technologies, Inc.
Nuclear Production Division Post Office Box 85608 Put'lic Service Company of Colorade San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado Ouality Assurance Division P. O. Box 840 Public Service Compary of Colorado Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box E40 Public Service Compary of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Procram Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 Regional Administrator, Regier. IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Pediation Programs Environmental Protection Agency 1 Derver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413
-_