Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000272/1995019 + (06:09:16, 6 January 2025)
- ML18101B132 + (06:09:18, 6 January 2025)
- ML18101B131 + (06:09:18, 6 January 2025)
- ML18101B130 + (06:09:19, 6 January 2025)
- ML18101B129 + (06:09:20, 6 January 2025)
- ML18101B128 + (06:09:21, 6 January 2025)
- 05000272/LER-1995-028-01, :on 950920,effective Leakage Monitoring Program Did Not Meet TS 6.8.4a Requirements Due to Mgt/Qa Deficiency.Consolidated Program Under Single Organization to Assure Plant Design Basis Satisfied + (06:09:22, 6 January 2025)
- ML18101B125 + (06:09:24, 6 January 2025)
- 05000311/LER-1995-007-02, :on 900503,diesel Surveillance Required by TS Was Missed.Revised Process for Modifying EDG Surveillance Frequency + (06:09:25, 6 January 2025)
- ML18101B122 + (06:09:28, 6 January 2025)
- ML18101B120 + (06:09:29, 6 January 2025)
- ML18101B118 + (06:09:30, 6 January 2025)
- ML18101B117 + (06:09:31, 6 January 2025)
- ML18101B116 + (06:09:32, 6 January 2025)
- 05000311/LER-1995-006, Revises Corrective Action Due Date in LER 95-006-00 to Correspond W/Due Dates in Restart Action Plan,Consisting of 960501 for Reviews & 960630 for Applicable Procedure Revs + (06:09:34, 6 January 2025)
- ML18101B114 + (06:09:35, 6 January 2025)
- ML18101B113 + (06:09:37, 6 January 2025)
- ML18101B112 + (06:09:37, 6 January 2025)
- IR 05000272/1995012 + (06:09:38, 6 January 2025)
- ML18101B109 + (06:09:40, 6 January 2025)
- ML18101B108 + (06:09:41, 6 January 2025)
- ML18101B104 + (06:09:44, 6 January 2025)
- ML18101B105 + (06:09:44, 6 January 2025)
- ML18101B103 + (06:09:45, 6 January 2025)
- ML18101B102 + (06:09:46, 6 January 2025)
- ML18101B101 + (06:09:47, 6 January 2025)
- 05000272/LER-1995-025, :on 951012,identified Plant Procedures Did Not Contain Specific Instructions to Limit Sys Flow for Pump Accident Alignments.Caused by Limited Appreciation of Significance of Operating.Baseline Document Revised + (06:09:50, 6 January 2025)
- ML18101B094 + (06:09:52, 6 January 2025)
- ML18101B093 + (06:09:54, 6 January 2025)
- IR 05000813/2010014 + (06:09:55, 6 January 2025)
- ML18101B090 + (06:09:57, 6 January 2025)
- 05000311/LER-1995-004, :on 950607,EFS Actuation Occurred During Unit 2 Controlled Shutdown Per TS 3.0.3.Caused by Inadequate Mgt Oversight of Operability Determination Process.Trained All Licensed Operators + (06:09:59, 6 January 2025)
- ML18101B088 + (06:10:00, 6 January 2025)
- ML18101B087 + (06:10:02, 6 January 2025)
- ML18101B086 + (06:10:03, 6 January 2025)
- TAC:M93405 + (06:10:04, 6 January 2025)
- ML18101B084 + (06:10:06, 6 January 2025)
- 05000272/LER-1995-010, :on 950615,both Units RHR Pumps Inoperable for long-term Flow Requirements Due to RHR Flow Instrument Uncertainties.Further Evaluated New EOP Setpoint for RHR Pump Operation + (06:10:07, 6 January 2025)
- 05000272/LER-1995-005, :on 950508,eight Occurrences Revealed Lift Settings of Pressurizer Code Safety Valves on Both Units Out of Required Tolerance.Caused by Testing Intrument Error. Counseled Personnel Involved + (06:10:09, 6 January 2025)
- 05000272/LER-1995-019, :on 950726,operability Functional Test Was Not Performed Prior to Mode Entry.Caused by Lack of Managerial Oversight & Organizational Breakdowns.Entered Tracking as for 1VC1 & 1VC2 for Mode 6 + (06:10:11, 6 January 2025)
- ML18101B080 + (06:10:13, 6 January 2025)
- ML18101B079 + (06:10:13, 6 January 2025)
- ML18101B078 + (06:10:14, 6 January 2025)
- ML18101B074 + (06:10:17, 6 January 2025)
- IR 05000272/1995018 + (06:10:20, 6 January 2025)
- ML18101B071 + (06:10:21, 6 January 2025)
- ML18101B062 + (06:10:26, 6 January 2025)
- ML18101B060 + (06:10:26, 6 January 2025)
- 05000272/LER-1995-021-01, :on 930403,both Reactor Vessel Level Indication Sys Trains Inoperable Due to Inadvertent CO2 Actuation Due to Water Intrusion.Completed RVLIS & Cabinet Sealing Repaired + (06:10:28, 6 January 2025)
- 05000272/LER-1995-022, :on 950916,ABV Sys Exceeded Allowable Bypass Leakage Due to Tear in Expansion Joint Fabric.Caused by Equipment Failure.Expansion Joint Fabric Replaced + (06:10:30, 6 January 2025)
- 05000272/LER-1995-020-01, :on 950914,vital 230 Volt MCCs Declared Inoperable Due to Failed Bus Bar Bolting.Caused by Stress Corrosion Cracking.Design Change Package DCP-1ER-0098 Implemented to Replace Bus Bolts W/Carbon Steel Bolts + (06:10:34, 6 January 2025)