Forwards Insp Repts 50-272/95-17 & 50-311/95-17 on 950813-1014 & NOV
ML18101B090
Person / Time
Site: Salem  
Issue date: 11/06/1995
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18101B091 List:
References
NUDOCS 9511140022
Download: ML18101B090 (3)


See also: IR 05000272/1995017

Text

..

T

.. *

November 6, 1995

Mr. Leon R. Eliason

President and Chief Nuclear Officer

Public Service Electric and Gas Company

P.O. Box 236

Hancocks Bridge, NJ

08038

SUBJECT:

SALEM RESIDENT INSPECTION NOS. 50-272/95-17; 50-311/95-17 AND

NOTICE OF VIOLATION

Dear Mr. Eliason:

The enclosed report documents an inspection for public health and safety,

conducted by Mr. C. Marschall, Senior Resident Inspector and other members of the

NRC resident and regional staff at the Salem Nuclear Generating Station for the

period between August 13, 1995 and October 14, 1995.

The inspectors discussed

the findings of this inspection with Messrs. C. Warren, General Manager-Salem

operations, and other members of your staff.

This report also contains inspection findings of Ms. C.D. Beardslee of the

regional inspection staff, as well.as findings of our system reviews which were

performed during the time period indicated.

The overall conclusions are

reflected in the Executive Summary for the complete report.

We are taking this

approach to better integrate our inspection findings into a consistent regulatory

message and more clearly communicate how these findings may reflect a change in

your performance.

Both units were operated safely during this period.

We were encouraged by the

actions of the operators to activities that did not meet expected performance

standards.

Additionally, we observed an improving trend regarding control of

outage risk. During the inspection we monitored your System Readiness Reviews

and the Management Review Committee's review of the items recommended for action

prior to restarting Salem Unit 1. We found that the System Readiness Reviews and

oversight by the Management Review Committee provided a sound method for

determining the focus of maintenance and modifications to improve plant safety.

Based on the results of an inspection of your tagging and work control, the NRC

has determined that a violation of NRC requirements occurred. The violation is

cited in the .enclosed Notice of Violation (Notice) and the circumstances

surrounding it is described in detail in the subject inspection report.

The

violation is of concern because your previous attempts to correct problems with

tagging and work control have not been effective.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your response,

you should document the specific actions taken and any additional actions you

pl an to prevent recurrence.

Your response may reference or include previous

docketed correspondence, if the correspondence adequately addresses the required

response. After reviewing your response to this Notice, including your

~*r*r--"()2

l

~) U !. G

9511140022 951106

PDR

ADOCK 05000272

G

PDR

i-

,.

' *

Mr. Leon R. Eliason

2

proposed corrective actions and the results of future inspections, the NRC will

determine whether further NRC enforcement action is necessary to. ensure

compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's

11Rules of Practice", a copy of this

letter, its enclosure, and your response will be placed in the NRC Public

Docu~ent Room (PDR).

To the extent possible, your response should not include

any personal privacy, proprietary, or safeguards information so that it can be

placed in the PDR without redaction. The responses directed by this letter and

the enclosed Notice are not subject to the clearance procedures of the Office of

Management and Budget as required by the* Paperwork Reduction Act of 1980, Pub.

  • L. No . 96 . 511.

Your cooperation with us is appreciated.

Docket Nos. 50-272

50-311

Enclosures:

Sincerely,

ORIGINAL SIGNED BY:

Larry E. Nicholson, Chief

Projects Branch No. 3

Division of Reactor Projects

1.

Appendix A, Notice of Violation

2.

NRC Inspection Report Nos. 50-272/95-17; 50-311/95-17

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

J. Hagan, Vice President - Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

R. Burricelli, Director - External Affairs

C. Warren, General Manager - Salem Operations

J. Benjamin, General Manager - Quality Assurance & Nuclear Safety Review

F. Thomson, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, ~r., Esquire

M. Wetterhahn, Esquire

P. MacFarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways cr*~ek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

..

'i

Mr. Leon R. Eliason

3

Distribution w/encl:

Region I Docket Room (with concurrences)

K. Gallagher

Nuclear Safety Information Center (NSIC)

D. Screnci, PAO (2)

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

L. 01 shan, NRR

W. Dean, OEDO

J. Stolz, PDI-2, NRR

Inspection Program Branch, NRR (!PAS)

DOCUMENT NAME:

a:9517.sal

To receive a copy of this document, indicate in the box: "C' = Copy without attachmentjenclosure "E" = Copy with

attachmentjenclosure "N' = No copy

OFFICE