Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18153B988 + (00:02:18, 6 January 2025)
- 05000280/LER-1989-037, :on 891017,steam Generator a Steam Line to Steam Header High Differential Pressure Safety Injection Channel IV Declared Inoperable.Caused by Failure of Pressure Comparator.Comparator Replaced + (00:02:19, 6 January 2025)
- 05000281/LER-1989-013-02, :on 891017,tests Determined That Required Lift Setpoints of 2485 +/- 1% Exceeded on All Tested Valves. Caused by Incorrect Setting of Valve Setpoints.Settings Adjusted to Proper Setpoint & Tolerance + (00:02:22, 6 January 2025)
- ML18153B985 + (00:02:24, 6 January 2025)
- ML18153B984 + (00:02:27, 6 January 2025)
- PNO-II-89-075, on 891106 During post-maint Pressure Testing, Pressurizer Safety Valve C Lifted & Reclosed at 2,255 Psig Rather than 2,335 Psig.Loss of Loop Seal Identified as Possible Cause.Util Developing Corrective Actions + (00:02:29, 6 January 2025)
- ML18153B982 + (00:02:30, 6 January 2025)
- ML18153B981 + (00:02:31, 6 January 2025)
- ML18153B980 + (00:02:32, 6 January 2025)
- ML18153B979 + (00:02:33, 6 January 2025)
- ML18153B978 + (00:02:34, 6 January 2025)
- ML18153B977 + (00:02:35, 6 January 2025)
- ML18153B974 + (00:02:39, 6 January 2025)
- ML18153B976 + (00:02:39, 6 January 2025)
- ML18153B973 + (00:02:40, 6 January 2025)
- ML18153B971 + (00:02:40, 6 January 2025)
- IR 05000280/1989028 + (00:02:42, 6 January 2025)
- IR 05000280/1989029 + (00:02:43, 6 January 2025)
- ML18153B966 + (00:02:48, 6 January 2025)
- ML18153B965 + (00:02:52, 6 January 2025)
- ML18153B964 + (00:02:53, 6 January 2025)
- ML18153B963 + (00:02:54, 6 January 2025)
- ML18153B962 + (00:02:55, 6 January 2025)
- ML18153B960 + (00:02:56, 6 January 2025)
- ML18153B959 + (00:02:57, 6 January 2025)
- ML18153B958 + (00:02:58, 6 January 2025)
- ML18153B956 + (00:02:59, 6 January 2025)
- ML18153B957 + (00:02:59, 6 January 2025)
- ML18153B955 + (00:03:00, 6 January 2025)
- IR 05000280/1989025 + (00:03:03, 6 January 2025)
- ML18153B952 + (00:03:05, 6 January 2025)
- ML18153B951 + (00:03:05, 6 January 2025)
- ML18153B950 + (00:03:06, 6 January 2025)
- ML18153B948 + (00:03:07, 6 January 2025)
- ML18153B947 + (00:03:08, 6 January 2025)
- ML18153B945 + (00:03:08, 6 January 2025)
- 05000281/LER-1989-011-02, :on 890919,found That Pipe Support Rigidly Attached to Auxiliary Bldg Structure & Facility Containment Which Violates Design Requirements.Caused by Design Error. Pipe Support Modified + (00:03:10, 6 January 2025)
- 05000281/LER-1989-012-02, :on 890919,discovered That Two Individual Rod Position Indicators in Control Bank A,Group 2 Had Differed in Indicated Position.Caused by Inadequate Method Used to Log Accumulated Times.Procedures Modified + (00:03:12, 6 January 2025)
- IR 05000280/1989027 + (00:03:14, 6 January 2025)
- ML18153B940 + (00:03:15, 6 January 2025)
- PNO-II-89-072, on 891012,plant Shut Down Due to Leakage Past Pressurizer Safety Valve B.Operators Classified Leakage as Unidentified & Entered Tech Spec 3.1.C.2.Three Safety Valves Removed & Shipped to Westinghouse for Repair + (00:03:17, 6 January 2025)
- IR 05000280/1989021 + (00:03:21, 6 January 2025)
- 05000281/LER-1989-005-01, :on 890908,during Performance of Periodic Test on Turbine Bldg Flood Control Circuitry,Two of Four Condenser Waterbox Circulating Water Inlet Isolation Valves Closed Unexpectedly + (00:03:24, 6 January 2025)
- ML18153B936 + (00:03:25, 6 January 2025)
- ML18153B935 + (00:03:26, 6 January 2025)
- ML18153B934 + (00:03:27, 6 January 2025)
- ML18153B933 + (00:03:28, 6 January 2025)
- ML18153B932 + (00:03:29, 6 January 2025)
- ML18153B931 + (00:03:31, 6 January 2025)
- ML18153B930 + (00:03:33, 6 January 2025)
- 05000281/LER-1989-006-01, :on 890911,containment Particulate Radiation Monitor Indication Increased Above Alarm Setpoint.Caused by High Detector Reading Due to Containment Pressure Reduction. Alarm Reset & Suction Valves Realigned + (00:03:34, 6 January 2025)