ML18153B971

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-32 & DPR-37,to Eliminate Confusion W/Inoperable Control Rod Spec by Providing Allowed Outage Time & Action Statement for Inoperable Control Rod
ML18153B971
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/03/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18153B972 List:
References
89-644, NUDOCS 8911140219
Download: ML18153B971 (3)


Text

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 3, 1989 United States Nuclear Regulatory Commission Serial No.89-644 Attention: Document Control Desk NO/ETS Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION INOPERABLE CONTROL RODS Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station Units 1 and 2 respectively. This change will eliminate the confusion associated with the existing inoperable control rod specification, and at the same time bring it in line with the.

Standard Technical Specifications. Specifically, it will provide an allowed outage time and action statement for an inoperable control rod. The proposed change is included in Attachment 1.

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that the proposed changes do not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. The basis for our no significant hazards consideration determination is included in Attachment 2.

W. L. Stewa Senior Vice President - Power Attachments

1. Proposed Technical Specification Change
2. Significant Hazards Consideration Determination r,-----:-3"?"-:11-1,.--:1~4~0::-:::;~*!-::_?~.--;::;:=:~r.;,1111~o:...~-=:--~\

. FDR A:Ct1_11_.1<.. (150(HF)_:2D**l.1~0 )

i F' . -*

cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219

e COMMONWEALTH OF VIRGINIA )

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. R. Cartwright, who is Vice President - Nuclear, for W. L. Stewart, who is Senior Vice President -

Power, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ,3__ day otl/[~~ , 19§!1....

My Commission Expires: ~b/1,u"""J' ,2.S , 19 '9.:1 .

~X~-----

Notary Public

=-

(SEAL):

-.. ,_