Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211N696 + (02:36:21, 6 December 2024)
- ML20211N695 + (02:36:22, 6 December 2024)
- ML20211N694 + (02:36:23, 6 December 2024)
- ML20211N690 + (02:36:24, 6 December 2024)
- ML20211N691 + (02:36:24, 6 December 2024)
- ML20211N687 + (02:36:25, 6 December 2024)
- ML20211N688 + (02:36:25, 6 December 2024)
- ML20211N685 + (02:36:26, 6 December 2024)
- BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station + (02:36:27, 6 December 2024)
- IR 05000338/1986008 + (02:36:27, 6 December 2024)
- ML20211N682 + (02:36:28, 6 December 2024)
- ML20211N678 + (02:36:29, 6 December 2024)
- ML20211N680 + (02:36:29, 6 December 2024)
- ML20211N675 + (02:36:35, 6 December 2024)
- BECO-LTR-97-101, Forwards Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program, Which Incorporates post-refueling Outage 11 Changes & Plant 10CFR50 App J,Option B License Amend + (02:36:36, 6 December 2024)
- ML20211N673 + (02:36:36, 6 December 2024)
- ML20211N672 + (02:36:37, 6 December 2024)
- ML20211N671 + (02:36:38, 6 December 2024)
- 05000334/LER-1997-030, :on 970908,failure to Comply W/Edg TS Action Statement Was Identified.Caused by Inadequate Interpretation of Ts.Revised Procedure 3.4, Clearance Procedure to Agree W/Ts Action Statement 3.8.1.1.b + (02:36:39, 6 December 2024)
- ML20211N668 + (02:36:40, 6 December 2024)
- ML20211N665 + (02:36:41, 6 December 2024)
- ML20211N667 + (02:36:41, 6 December 2024)
- NSD-NRC-97-5368, Forwards Response to RAI Re Control Rod Insertion Assumptions in AP600 SSAR LOCA Analyses.Nrc Should Inform W of Status to Be Designated in NRC Status Column of Oits + (02:36:42, 6 December 2024)
- RBG-44217, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-03 on 970804-08.Corrective Actions:Counseled Radwaste Shipping Personnel for Failure to Follow Procedural Requirements + (02:36:45, 6 December 2024)
- ML20211N663 + (02:36:45, 6 December 2024)
- ML20211N661 + (02:36:46, 6 December 2024)
- ML20211N657 + (02:36:47, 6 December 2024)
- ML20211N659 + (02:36:47, 6 December 2024)
- ML20211N655 + (02:36:48, 6 December 2024)
- ML20211N652 + (02:36:49, 6 December 2024)
- ML20211N649 + (02:36:51, 6 December 2024)
- ML20211N650 + (02:36:51, 6 December 2024)
- ML20211N645 + (02:36:53, 6 December 2024)
- ML20211N644 + (02:36:53, 6 December 2024)
- ML20211N642 + (02:36:54, 6 December 2024)
- ML20211N641 + (02:36:55, 6 December 2024)
- ML20211N640 + (02:36:55, 6 December 2024)
- ML20211N633 + (02:36:59, 6 December 2024)
- ML20211N636 + (02:36:59, 6 December 2024)
- ML20211N632 + (02:37:00, 6 December 2024)
- HL-5495, Forwards Copy of Renewed NPDES Permit GA0004120,issued by State of Ga Environ Protection Div + (02:37:01, 6 December 2024)
- DD-86-18, Advises That Time for Commission to Review Directors Decision DD-86-18 Expired.Commission Declined Review. Decision Became Final Agency Action on 861215.Served on 861217 + (02:37:02, 6 December 2024)
- ML20211N630 + (02:37:02, 6 December 2024)
- ML20211N626 + (02:37:05, 6 December 2024)
- ML20211N627 + (02:37:05, 6 December 2024)
- ML20211N625 + (02:37:07, 6 December 2024)
- ML20211N621 + (02:37:08, 6 December 2024)
- ML20211N622 + (02:37:08, 6 December 2024)
- ML20211N620 + (02:37:09, 6 December 2024)
- ML20211N619 + (02:37:09, 6 December 2024)
- PNO-I-86-045, on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided + (02:37:10, 6 December 2024)
- ML20211N617 + (02:37:10, 6 December 2024)