February 20, 1987 Docket No.
50-416 MEMORANDUM FOR: Walter R. Butler, Director BWR Project Directorate No. 4 Division of LWR Licensing FROM:
L. L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
SUBJECT:
FORTHCOMING MEETING WITH SYSTEM ENERGY RESOURCES, INC. (SERI)
REGARDING GRAND GULF UNIT 1 DATE & TIME:
March 2-7, 1987 8:30 a.m.
LOCATION:
Grand Gulf Nuclear Station Engineering Services Center Claiborne County, Mississippi PURPOSE:
Audit of the detailed control room design review and safety parameter display system.
(Agenda is enclosed)
PARTICIPANTS *:
NRC and Consultants SERI D. Serig R. F. Rogers J. Moore (LLNL)
D. L. Lewis J. Savage (LLNL)
R. A. Current M. Good (COMEX)
J. W. Tahler
/sj L. L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated cc w/ enclosure:
See next page i_
-
- Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",
43 Federal Register 28058,6/28/78.
PD 4/
P Q
LKintner:lb A
l l
- 2./lf /87 1 /2e/87 l
l 8703020161 870220 DR L
ADOCK 05000416 l
Mr. Oliver D. Kingsley, Jr.
System Energy Rescurces, Inc.
Grand Gulf Nuclear Station (GGNS)
CC:
Mr. Ted H. Cloninger Mr. C. R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager and Support System Energy Resources, Inc.
System Energy Resources, Inc.
Post Office Box 756 Post Office Box 23054 Port Gibson, Mississippi 39150 Jackson, Mississippi 39205 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 120017th Street, N.W.
Jackson, Mississippi 39201 Washington, D. C.
20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Utilities System Services, Inc.
P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. John G. Cesare Resources Director, Nuclear Licensing and Safety Bureau of Pollution Control System Energy Resources, Inc.
Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.
Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 w
Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. James E. Cross GGNS Site Director System Energy Resources, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150 l
, m pu,
.- w
,- y xi*.
. M -. * -
.L.*,,
- T *.,
r*
. e 1 d p',.. c. ;b k,, W:
a
- =
ENCLOSURE
' l AGENDA FOR AUDIT OF THE GRAND GULF NUCLEAR STATION (GGNS) DETAILED 2
CONTROL ROOM DESIGN REVIEW AND SAFETY PARAMETER DISPLAY SYSTEM b.\\
The Nuclear Regulatory Commission staff and its consultants Lawrence Livermore (LLNL) plan an audit of the licensee's* Detailed Control National Laboratory (DCRDR) and Safety Parameter Display System (SPDS) efforts Room Design Review for Grand Gulf Nuclear Station. The audit team will evaluate the organization, process, and results of MP&L's DCRDR and SPDS efforts. The audit is planned for March 2-7, 1987 at GGNS. SERI should make the following preparations:
1.
Review team personnel (including contractors) knowledgeable in each of the DCRDR and SPDS tasks should be available to discuss the review process and to respond to staff questions during the audit.
2.
Up-to-date documentation of the organization, process, and results of the DCRDR and SPDS efforts should be available.
3.
Conference or office space should be available for the.NRC staff's meeting with SERI and for the staff and its consultants to meet privately.
4.
Access to the control room, simulator, and remote shutdown facilities
[
should be provided as necessary.
5.
Clearance to bring camera equipment on site and to take photographs in the control room and other areas that would assist in evaluating the DCRDR and SPDS efforts should be provided.
^
A tentative audit agendt is enclosed.
'~
if
~.
t
- Prior to December 20, 1986, the licensee was Mississippi Power & Light Company (MP&L). On December 20, 1986, Amendment 27 to the Operating License was issued, transferring control of licensed activities from MP&L to System p~
Energy Resources, Inc. (SERI). Consequently there may be historical references t
to MP&L in this audit.
P 9
e O
,k-[h,
. y [' e ' ['
Sr.. I '.'. -
jl c
i
11 i
~
t 3:
ENCL.0SURE TENTATIVE AGENDA GRAND GULF NUCLEAR GENERATING STATION
,f COMBINED SAFETY PARAMETER DISPLAY SYSTEM AND DETAILED CONTROL ROOM DESIGN REVIEW AUDIT
~.
r.
DAY 1, Monday, March 2,1987 8:30 A.M.
1 NRC Entrance Briefing and Introductions 8:45 A.M.
2 Description of SPDS design program and current status by SERI including:
i Boundaries of the SPDS with respect to the EOF, TSC and/or plant computer Basis for parameters displayed Human factors analysis, standards, and criteria used in the design process with emphasis on
'y plant specific considerations
. i.:
[
g Displays layouts and basis for displays selected Q'y i
+}
System reliability and availability:
Design characteristics to ensure high availability "h,
Methods used to estimate system availability Methods planned to monitor operational availability System security provisions
'I 'l Data validation methodology used in the SPDS, including data validation performed by any
'?-
necessary support systems that provide validated data to the SPDS. Possible examples are RVLIS and radiation monitoring.
Operator training in the use of the SPDS 4
System maintenance philosophy and staffing i j i,
I ',
P 4
bi Fa
?. a
.h p:,
.. ~...., -, -. -
,7-53
.c -
?.'~
V
- ~
, ~ e s
p.
. i, 1:00 P.M.
3
)
Description of Verification and Validation (Y&V) Program, including:
Description of the V&V team and discussion of the degree of independence from the design team Scope and depth of the V&V Program Q
Test cases for validation of SPDS parameters and how they demonstrate the representativeness f, <*
and usability of the selected parametcrs for evaluating transient conditions that do not fall within the plant design basis.
Discussion of SPDS Validation testing lc Verification of human factors aspects of system p
Coordination with other NUREG-0737 initiatives, with emphasis on control room design review j,;
(including a short discussion of SPDS-related findings).
Overview of SPDS V&V documentation p.
3:00 P.M. 7 NRC human factors audit of displays, display formats, control devices, access and response times.
P.,
The audit team will wish to operate or witness operation of the system to access and examine all Q,
SPDS display formats.
This activity may be conducted in the Control Room, TSC, EOF, Control p
Room Simulator, or SPDS engineering simulator.
V0
???
hl3 Day 2, Tuesday, March 3,1987 g(0 8:30 A.M.
5 NRC questions and review of V&V documentation. As part of the V&V documentation review, the H.,
audit team will want to select sample SPDS requirements and trace their implementation through
'N hardware and software specifications, source code, verification testing, integrated system testing, F,'q and field installation testing.
'Ihe audit team will review documentation of V&V activities for each
" Jj M
s'ep. To support this review, all existing system documentation in the following categories should be available for the SPDS and any necessary supporting systems that provide validated data to the SPDS.
P c
- Concurrent with DCRDR discussions.
, *i e
T
.=
w
~
1
(:
s System functional requirements documents Ilardware and software specifications Algorithm descriptions, and source code Emergency operating procedures l
Data validity criteria Software and hardware verification test procedures and results u
System validation test procedures and results System availability study Documentation of independent verification reviews of functional requirements documents, hardware and software specifications, algorithms, test procedures, and results.
Drawings that document the make and type of SPDS electrical isolators and the interconnection of r
the isolators with safety-related inputs and the SPDS.
i Identification of outstanding questions resulting from the V&V documentation review 4
8:30 A.M.
1 Entance Briefing for DCRDR Audit and Control Room tour.
4,'
2 DCRDR Team l :l)1
[
Qualifications V
r"d Team members responsibilites, assignments, and level of effort in specific tasks.
"c:'
f,
[q Discuss Operating Experience Review.
i -
ld jd f
l)
F-I t
,e-4*
W
1 I
a 1:00 P.M.
3 The Function and Task Analysis t,"
Brief overview Audit team to select a procedure and step through procedure using documentation.
- Summary of adequacy of Task Analysis y;
5:00 P.M.
~
Day 3, Wednesday, March 4,1987
.l:,
]
8:30 A.M.
6 Short tour of the Control Room.
Run through of plant-specific scenarios that involve monitoring of shutdown / start-up reactivity i;
confirmation of containment isolation, monitoring of reactor building radiation levels and hydrogen L
and oxygen concentration, and trends and monitoring of gaseous releases. The run through should be performed by a plant operator who is familiar with SPDS operation and should make use of plant emergency operating procedures. The run through will be most effective if it is performed using the control room simulator. However, use of any SPDS display that can be driven by simulated plant transient data is acceptable.
4 1:00 P.M.
Discussion of outstanding questions E;.
Di 2:00 P.M.
7 NRC audit team caucus
- ,]
=
^
!.;j.
3:00 P.M.
8 Exit Briefing
~
,t D
1 '1 1
d T.]
i
.s.
l f.
j
' *;.i
~.1 Day 4, Thursday, March 5,1987
,j 8:30 A.M.
4 Control Room Inventory
.1 Review comparison.
5 Control Room Survey E{
Conduct mini-audit.
l z-1:00 P.M.
Continuation of survey discussion.
l.;
4 N
6 IIED Assessment
(;;
Review methodology for assessment process.
Review schedule for HED corrective actions implementation.
j) 1 Day 5, Friday, March 6,1987 8:30 A.M.
7 Selection of Design Improvements Review methodology.
Discuss need for prompt correction of IIEDs.
[ ~.1 f.[
Discuss specific IIEDs.
T; f:j 8
Verification that IIEDs are improved by corrections and do not introduce new HEDs.
..i Disciass methodology.
g..'
2
=%
av 5
6 6
, ~ ' ~
n.,
O
b4 i
, e i i
t 1:00 P.M.
9 Coordination Discuss process.
i 10 Exit Briefing
.. t; NRC cacaus Briefing i
eO 4
en O
P
- 5. y e o, e
I i
0 e
g r
4 h
,w>
(n. $,
- t l fi
's :.
- N A$
. 'e g.
.e 4
x
_*t 1
r.
i-l.
a
'u *.i i.
'i t
CRAND CULF AUDIT AGENDA MON TUES WED THRU FRI 4
E-G-@-*
'1 E
[
a m-m-
[
M b
f fif SPDS O
DCRDR O
~
M 0 Entance briefing
@ Caucus
@ Entrance briefing
@ Selection ofdesign and CR tour improvements 54
@ Verifecation
- )
O SPDS deseription E Exit beiefing
@ Revlow team
- 1
@ V&V description
@ Task analysis
@ Coordination
@ SPDS demonstratton
@ CR inventory
@ Ex6t brlefing
.l.
E Audit V&V documents
@ CR survoy dA E obs.rv. SPDS in use
@ Assessment o f HEDs a
4 L
4 y
h
..a..
s Meetina Notices Internal NRC Participants and Consultants p,DocketFile;
~
hRC PDR D. Serig Local PDR J. Moore (LLNL)
ORAS J. Savage (LLNL)
PD#4 Reading M. Good (COMEX)
HDenton/RVollmer RBernero/RHouston WButler EAdensam JZwolinski bec: Applicant & Service List Glainas DMuller ACRS-10 OGC, Attorney Bordenick (Bethesda)
JPartlow BGrimes EJordan PPAS/TOSB OPA Receptionist (Only if meeting is held in Bethesda) e Project Manager L. Kintner M0'Brien Region II BSiegel JUnda
%=.
s A
e 4
l l
~
6 s
& 7 Os k *.
e d',
- j..
N.
l-e 4
g**,
-t
- _ ' ~ * * *'9e *.*
.e.-(
e yy 6
m
+e
.=,
- 3
, T he %9 g
F re p**
,p
=t
- = * ' - *, = ;- %i e*
g
=9=,-
1 D
A ".'u'
~
~. '. :~ 'l. > ~ ' c ' - l < ' *
- g..,
., _.