Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E676 + (11:25:37, 4 December 2024)
- ML20212E677 + (11:25:37, 4 December 2024)
- ML20212E675 + (11:25:38, 4 December 2024)
- ML20212E674 + (11:25:38, 4 December 2024)
- ML20212E673 + (11:25:39, 4 December 2024)
- PNO-II-86-020, on 851031,bushings Were Installed During Outage Following Engine Failure in Diesel Generator of Plant Unit 2 + (11:25:39, 4 December 2024)
- U-600676, Requests Relief from Requirements of Reg Guide 1.97,Rev 3 Re post-accident Sampling Sys Capability to Sample Containment & Drywell Equipment/Floor Drain Sumps.Description & Justification Encl.Fsar Will Be Revised + (11:25:40, 4 December 2024)
- PNO-III-86-116, on 861015,while Operating at 95 Percent Power,Licensee Declared Unusual Event After Both Trains of Control Room Ventilation Sys Rendered Inoperable.Caused by Test Procedures Failed to Require Control Valve Be Reset + (11:25:41, 4 December 2024)
- PY-CEI-NRR-0599, Forwards Fee for Processing 870220 Emergency Tech Spec Change Request + (11:25:41, 4 December 2024)
- 05000414/LER-1987-001-04, :on 870126,two Ice Condenser Intermediate Deck Doors Exceeded Opening Force Requirements on 861118.Caused by Personnel Error.Personnel Counseled on Need to Follow Procedures + (11:25:44, 4 December 2024)
- ML20212E666 + (11:25:44, 4 December 2024)
- ML20212E662 + (11:25:45, 4 December 2024)
- ML20212E665 + (11:25:45, 4 December 2024)
- ML20212E660 + (11:25:46, 4 December 2024)
- PNO-III-86-117, on 861017,operating License Issued to Commonwealth Edison Co for Braidwood Nuclear Power Station, Unit 1.License Limited to Fuel Loading & Initial Testing Activities Leading to Criticality + (11:25:47, 4 December 2024)
- ML20212E658 + (11:25:47, 4 December 2024)
- ML20212E656 + (11:25:48, 4 December 2024)
- PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams + (11:25:51, 4 December 2024)
- TXX-6188, Interim Deficiency Rept CP-86-73 Re Installation of ASME Snubber Attachment Brackets.Initially Reported on 861020. Nine Supports Remain to Be Checked to Determine Adequacy of Swing Clearances.Next Rept Will Be Submitted by 870306 + (11:25:51, 4 December 2024)
- ML20212E650 + (11:25:52, 4 December 2024)
- ML20212E649 + (11:25:53, 4 December 2024)
- ML20212E647 + (11:25:54, 4 December 2024)
- ML20212E645 + (11:25:55, 4 December 2024)
- ML20212E643 + (11:25:56, 4 December 2024)
- RC-97-0218, Forwards Response to 970507 RAI Re fifteen-yr Tendon Surveillance Rept.Reactor Bldg post-tensioned Tendon Surveillance Records & Elongation/Tendon Force Comparison Data,Shown in Encl Table + (11:25:56, 4 December 2024)
- ML20212E641 + (11:25:57, 4 December 2024)
- ML20212E639 + (11:25:58, 4 December 2024)
- ML20212E640 + (11:25:58, 4 December 2024)
- ML20212E638 + (11:25:59, 4 December 2024)
- ML20212E634 + (11:26:00, 4 December 2024)
- 1CAN128612, Responds to Notice of Violation & Imposition of Civil Penalty,Part Ii,From Insp Rept 50-313/86-01 During Jan 1986. Response to Part I Contained in .Reconsideration of Violation a Requested.Corrective Actions Discussed + (11:26:01, 4 December 2024)
- ML20212E632 + (11:26:01, 4 December 2024)
- ML20212E626 + (11:26:04, 4 December 2024)
- ML20212E624 + (11:26:05, 4 December 2024)
- 05000414/LER-1986-052-01, :on 861122,main Feedwater Pump Turbine Trip Occurred During Attempt to Start Turbine 2A After 861120 Reactor Trip.Cause Not Determined.Valves Affected by Main Feedwater Isolation Signal Realigned + (11:26:06, 4 December 2024)
- ML20212E621 + (11:26:12, 4 December 2024)
- ML20212E619 + (11:26:33, 4 December 2024)
- ML20212E618 + (11:26:34, 4 December 2024)
- ML20212E616 + (11:26:35, 4 December 2024)
- ML20212E615 + (11:26:35, 4 December 2024)
- ML20212E612 + (11:26:36, 4 December 2024)
- ML20212E610 + (11:26:37, 4 December 2024)
- ML20212E608 + (11:26:37, 4 December 2024)
- ML20212E607 + (11:26:38, 4 December 2024)
- U-600672, Advises That Control Logic for Operation of Four 36-inch Isolation Valves Does Not Meet NUREG-0737,Item II.E.4.2 Requirement That Reopening of Containment Isolation Valves Require Deliberate Operator Action.Plant Mod Pending + (11:26:38, 4 December 2024)
- ML20212E603 + (11:26:39, 4 December 2024)
- ML20212E601 + (11:26:40, 4 December 2024)
- ML20212E602 + (11:26:40, 4 December 2024)
- ML20212E600 + (11:26:41, 4 December 2024)
- ML20212E598 + (11:26:42, 4 December 2024)
- ML20212E597 + (11:26:42, 4 December 2024)