Georgia Power Company 333 Piedmont Avenue Atlanta Georgia 30303 Telephone 404 526~6526 Mailing Address:

Post Office Box 4545 Atlanta. Georgia 30302 Georgia Power L T. Gucwa the soum rn electrc system e

Manager Nuclear Safety SL-1739 and Licensing December 22, 1986 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.

20555 NRC DOCKET 50-424 CONSTRUCTION PERMIT CPPR-108 V0GTLE ELECTRIC GENERATING PLANT UNIT 1 RADIAL PEAKING FACTOR LIMIT REPORT Gentlemen:

Provided as Enclosure 1 is the Radial Peaking Factor Limit Report for Cycle 1 operation of Vogtle Electric Generating Plant Unit 1.

By copy of this

letter, this report is provided to the Regional Administrator in accordance with Paragraph 6.8.1.6 of the Unit 1 Draft Technical Specifications currently under NRC review. is a copy of the elevation dependent peaking factor versus core height figure for Cycle 1 of Unit 1 which is being submitted in support of the subject report.

If you have any questions, please contact this office.

Sincerely, p@ e L. T. Gucwa JM/1m Enclosures C: Georgia Power Company U.S. Nuclear Regulatory Commission Mr. J. P. O'Reilly Dr. J. N. Grace, Regional Mr. G. Bockhold, Jr.

Administrator GO-NORMS Mr. J. F. Rogge, Senior Resident Inspector - Vogtle Ms. M. Miller, Licensing Project Manager Chief, Reactor Systems Branch, DPLA, U.S. Nuclear Regulatory Comission, Washington, D.C.

20555 nk 8701050375 861222 o

PDR ADOCK 05000424 PDR g\\'

A

Georgia Power A U. S. Nuclear Regulatory Commission December 22, 1986 Page Two c:

(copy list continued)

Georcla Power Company Mr.

F'. J. Florian Mr. A. L. Mosbaugh Mr. W. F. Kitchens Mr. T. V. Greene Mr. R. D. Baker Southern Company Services

)

Mr. L. B. Long Mr. B. E. Hunt Mr. L. K. Mathews Mr. W. M. Andrews Mr. B. C. Armstrong Mr. J. A. Bailey Troutman, Sanders, Lockerman, & Ashmore Mr. J. E. Joiner Shaw, Pittman, Potts & Trowbridge Mr. B. W. Churchill Georgians Against Nuclear Energy Mr. D. Feig Ms. C. Stangler i

0175r 7=775

Georgia Power A ENCLOSURE 1 TO GPC LETTER SL-1739 RADIAL PEAKING FACTOR LIMIT REPORT - CYCLE 1 This Radial Peaking Factor Limit Report is provided in accordance with Paragraph 6.8.1.6 of the Vogtle Unit 1 Technical Specifications.

The F limits for RATED THERMAL POWER within specified core planes for Cycle 1 shall be:

FhP 1.71 for all core planes containing bank "D" control rods.

1.

2.

For all unrodded core planes:

RP F

1.54 up to core elevations of 5.5 ft.

FhP 1.62 for core elevations above 5.5 ft.

The F (z) limits are used to confirm that the heat flux hot channel factor Fq(z) will be limited to the Technical Specification values of:

~2.30

~

[K(z)] for P > 0.5 and, Fq(z) $ _ p Fq(z) < [4.60] [K(z)] for P < 0.5 assuming the most limiting axial power distributions expected to result from the insertion and removal of control banks C and D during operation, including the accompanying variations in the axial xenon and power distributions as described in the " Power Distribution Control and Load Following Procedures," WCAP-8385, September 1974. Therefore, these Fxy limits provide assurance that the initial conditions assumed in the LOCA analysis are met and the ECCS acceptance criterion limit of 2200 F for peak clad temperature is not exceeded.

Ol76r December 2?,1986

' 700775

ENCLOSURE 2 TO GPC LETTER SL-1739 V0GTLE UNIT 1 CYCLE 1 2.4 I

I I

(0. <X).

2 20)

(s.')0.

2,:C)

' s-a" 6 aw

'm y

4 k

1 10,64. :!, 15) 4 2.2

~

i t

1 e'

xa n

(

4 l

d' 2.

d 4

b A

1

~

L t

l' a

a t

Y'

\\i l

1 L

a.

\\

1 e-4 k

a_

l 12.OC'.

'I.50 )1 CORE EIGHT F,y LIMIT

^

i,4 0.0 TO 5.5 ft.

1.54 l

5.5 TO 12.0 ft.

1.62 A

1.2 3.

A

  • 00 1

2 3

4 S

6 7

8 9

to 11 12 ccE Emit (ftET) i I

l FIGURE 1 MAXIMUM (FgT

  • Pr.: ) VERSUS CORE HEIGHT l

DURING NORMAL CORE OPERATION l

December 22, 1986