Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN078613, Forwards Revised Justifications for Continued Operation Re Limitorque Operator Concerns Expressed by NRC During 860714- 18 Audit/Insp of Environ Qualification Program,Per 860722 Telcon.Clarification of Specific Issues Provided + (06:52:58, 4 December 2024)
- ML20214J524 + (06:52:59, 4 December 2024)
- GO2-86-696, Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant + (06:53:00, 4 December 2024)
- ML20214J522 + (06:53:00, 4 December 2024)
- 05000458/LER-1986-044, :on 860807,reactor Trip Occurred as Result of Turbine Bldg High Temp Isolation Trip Signal.Caused by Failure of Main Steam Moisture Separator Reheater Drain Tank Gasket.Gasket Replaced + (06:53:02, 4 December 2024)
- ML20214J517 + (06:53:03, 4 December 2024)
- ML20214J516 + (06:53:03, 4 December 2024)
- W3P87-1329, Remits Insp Fee for 860622-860927 + (06:53:04, 4 December 2024)
- ML20214J514 + (06:53:04, 4 December 2024)
- ML20214J510 + (06:53:05, 4 December 2024)
- ML20214J509 + (06:53:06, 4 December 2024)
- ML20214J508 + (06:53:06, 4 December 2024)
- ML20214J506 + (06:53:07, 4 December 2024)
- IR 05000412/1986020 + (06:53:08, 4 December 2024)
- ML20214J503 + (06:53:09, 4 December 2024)
- ML20214J504 + (06:53:09, 4 December 2024)
- IR 05000309/1987003 + (06:53:10, 4 December 2024)
- ML20214J500 + (06:53:11, 4 December 2024)
- ML20214J499 + (06:53:11, 4 December 2024)
- 05000369/LER-1987-009-02, :on 870415,reactor Tripped Due to Turbine Tripped Signal Generated While Station Personnel Testing Turbine auto-stop Oil Pressure Switch.Caused by Design Deficiency.Preventive Maint Code Changed + (06:53:13, 4 December 2024)
- ML20214J491 + (06:53:14, 4 December 2024)
- ML20214J493 + (06:53:14, 4 December 2024)
- ML20214J488 + (06:53:15, 4 December 2024)
- TXX-6106, Interim Deficiency Rept CP-85-54 Re Seismic Qualification of HVAC Supports.Initially Reported on 860926.Engineering Evaluations Will Be Performed to Ensure Compliance W/Fsar Commitments.Next Rept Will Be Submitted by 870522 + (06:53:16, 4 December 2024)
- ML20214J484 + (06:53:17, 4 December 2024)
- ML20214J483 + (06:53:17, 4 December 2024)
- ML20214J480 + (06:53:18, 4 December 2024)
- ML20214J479 + (06:53:18, 4 December 2024)
- TXX-6103, Interim Deficiency Rept CP-86-77 Re Spec of Min Wall Thickness in Instrument Tubing.Initially Reported on 861021. Spec 2323-MS-625 & Const Procedure ICP-4 Reviewed.Next Rept Anticipated by 870121 + (06:53:19, 4 December 2024)
- ML20214J475 + (06:53:20, 4 December 2024)
- ML20214J476 + (06:53:20, 4 December 2024)
- ML20214J473 + (06:53:21, 4 December 2024)
- ML20214J474 + (06:53:21, 4 December 2024)
- ML20214J471 + (06:53:22, 4 December 2024)
- ML20214J467 + (06:53:23, 4 December 2024)
- PNO-I-87-044, on 870516,receipt Insp of Two Radioactive Matls Shipping Packages Showed External Radiation Levels of 2,000 & 1,500 Mrem/H,Exceeding NRC & DOT Limit of 200 Mrem/H. Cause Being Investigated.States of Ny & Nc Will Be Informed + (06:53:23, 4 December 2024)
- ML20214J464 + (06:53:24, 4 December 2024)
- ML20214J460 + (06:53:25, 4 December 2024)
- ML20214J461 + (06:53:25, 4 December 2024)
- ML20214J459 + (06:53:26, 4 December 2024)
- ML20214J457 + (06:53:27, 4 December 2024)
- 05000440/LER-1986-073, :on 861025,both Trains of Control Room Ventilation (HVAC) Sys Shifted Into Emergency Recirculation Mode & Standby Train of Annulus Exhaust Gas Treatment Sys Started.Caused by Inadequate Procedure.Instructions Revised + (06:53:29, 4 December 2024)
- ML20214J447 + (06:53:30, 4 December 2024)
- 05000440/LER-1986-072, :on 861025,28 & 29,reactor Protection Sys Alternate Power Supply Tripped,Causing Nuclear Steam Supply Shutoff Sys Outboard Isolation.Caused by Design Deficiency. Regulating Transformers Will Be Installed + (06:53:32, 4 December 2024)
- ML20214J442 + (06:53:32, 4 December 2024)
- ML20214J439 + (06:53:33, 4 December 2024)
- ML20214J438 + (06:53:33, 4 December 2024)
- ML20214J437 + (06:53:34, 4 December 2024)
- ML20214J432 + (06:53:35, 4 December 2024)
- ML20214J431 + (06:53:35, 4 December 2024)
- ML20214J430 + (06:53:36, 4 December 2024)
- ML20214J428 + (06:53:36, 4 December 2024)