. 3 a.

With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining offsite A.C. sources by performing surveillance requirement 4.8.1.1.la within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; separately demonstrate the operability of two diesel generators by performing surveillance requirements 4.8.1.1.2a.4 and Q* 4.8.1.1.2a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless this surveillance was performed within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or unless the diesel is operatingM, restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in CO SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b. With one offsite circuit and one diesel g,enerator of the above required A.C.

electrical power sources inoperable *, demonstrate the OPERABILITY of the l

remaining offsite A.C. source by performing surveillance requirement j 4.8.1.1.la within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />'thereafter;

> demonstrate the operability of the remaining '------

diesel gen as unless the

3. e 7_- _r -n _ . _ _

_<-~-g___ a n i r: j diesel is operating **; restore at least one of the inoperable sources to i OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY w 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; with the diesel generator restored to OPERABLE status, follow action statement a; with the offsite circuit restored to OPERABLE, follow action statement d.

~

WMs3 ffE j,jopgggiuff of THE 4tESEL &/As AuE To gjjajgb 7EST/^A C/E /YA//UTEAJ1M/M 1 8612010337 861121 PDR ADOCK 05000369 P PDR

i With a diesel generator of the above required A.C. electrical power sources d.

inoperable *, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.la within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaf ter; and unless the inoperability of the diesel was due to preplanned testing or maintenance, demonstrate the operability of the '

remaining diesel generator by performing Surveillance Requirements - 4.8.1.1.2a.4 and 4.8.1.1.2a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />;ar unless the diesel is ll operating **, restore diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or ,

be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN  !

within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i

e. With two of the above required offsite A.C. circuits inoperable, separately  ;

demonstrate the OPERABILITY of two diesel generators by performing surveil-lancerequirements 4.8.1.1.2a.4and 4.8.1.1.2a.5within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the diesel generators are already operating; restore at least one of the inoper-  ;

_$, able offsite sources to OPERABLE status -within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at leret HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. With only one offsite source restored, follow action staterent a.

f. With two of the above required diesel generators inoperable *, demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillaace Requirement 4.8.1.1.la within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (g* thereafter; restore at least one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. With one diesel generator restored, follow action statement d.

i  :

  • A diesel generator shall be considered to be inoperable from the time of failure until it satisfies the requiremente of Surveillance Requirements {

7 4.8.1.1.2a.4 and 4.8.1.1.2a.5,

    • This test is required to be completed regardless of when the inoperable diesel f$ generator is restored to OPERABILITY. The provisions of Specification 3.0.2 are not applicable, i

TABLE 4.8-l O!ESEL GENERATOR TEST SCHEDULE Number of Failures Number of Failures in in Last 100 Valid Last 20 Valid Tests * , Tests

  • Test Frequency

<1 <4 Once per 31 days 12** >5 .,

Once per 7 days

  • Criteria for determining number of failures and number of valid tests shall be in accordance with Regulatory Position C.2.e of Regulatory Guide 1.108, but determined on a per diesel generator basis.
  • For the purposes of determining the required test frequency, the previous test failure count may be reduced to zero if a complete diesel overhaul to like-new conditions is completed, pro'vided that the overhaul including appropriate post-maintenance operation and testing, is specifically approved by the manufacturer and if acceptable reliability has been demonstrated. The reliability criterion shall be the successful conpletion of 14 consecutive tests in a single series. T n Of th::: te::: 0h:11 be " :::rtn:: with Sur: W l:::: R:;;f r;;;nt '.S.' .l .2.:.h f:;r-t:::, in ::::rene; with f Sure:ill:::: 9: qui r;;;nt ' .S. I .-h&e. If this criterion is not satisfied '

during the first series of tests, any alternate criterion to be used to transvalue the failure count to zero requires NRC approval. -

    • The associated test frequency shall be maintained until seven consecutive failure free demands have been performed and the number of failures in the last 20 valid demands has been reduced to one.

TEP of THEsE 7ecrs sans te ia p<coraevet airni rHE A' t1 oTis >E TE5Frt% SugVEIl.LAA)GE SEQU 05$ 0V S flCAIO 9KI).L.a.4 ANb 4',R)l, LP/j TH6 t&Hhaha>& rajtz TES'T5 lb) ACCd6Ax)CE &)/rH -rHE 184'-6A V W I M 3A%.ifl6h IN THE f%T^niE~ To SPE</Fccaft& 4.T.U.%9, Adh SASClFICATi % 4 f ,1,1,2 94

  • i,0 Ring - UtiIT i- 3/4 8 5 g Amendment No.

OC&r05 YMTS I AU0 h