Arizona Nuclear Power Project
- PHOENIX. ARIZONA 85072g pj3 -4 ij{ B 5E P.O. BOX 52034 August 1, 1986 Mr. John B. Martin, Regional Administrator ANPP-17bg-ye/DGY/93/41 GH Office of I spection and Enforcement RcbM U.S. Nuclear Re8ulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut. Creek, CA 94596-5368
Subject:
Palo Verde Nuclear Generating Station (PVNG3)
Units 1, 2 and 3 Docket Nos. STN 50-528 (License NFF-41)
STN 50-529 (License NPF-51)
STN 50-530 1986 Annual Emer8ency Plan Exercise File: 86-002-493
References:
(1) Letter dated. August 3,
1983, from J.
B.
Martin, NRC, to E. E. Van Brunt, ANPP, regarding Emergency Preparedness Exercises.
(2) ANPP Policy and Procedures Manual No. 7N409.09.00.
Dear Mr. Martin:
Attached for your review and comment are the Objectives and Extent of Play for the 1986 PVNGS Annual Emergency Plan Exercise scheduled for October 29, 1986. These Objectives and Extent of Play are submitted pursuanc to the above references.
The off-site elements of the Objectives and Extent of Play have been coordinated among the cognizant state and local emergency response agescles.
If you are in need of clarification or additional information, please cc,ntact Dennis Yows at (602) 932-5300, extension 6280.
Very trul yours, Q
J. G. Hay es Vice President Nuclear Production JGH/DGY/rw cc:
O. M. De Michele E. E. Van Brunt, Jr.
R. P. Zimmerman E. A. Licitra G. M. Temple A. C. Gehr N
A F
R,--jd
EXERCISE OlUECTIVES AND EXTENT OF PLAY
.~ -
1 Obiectives 1.1 Onsite Arizona Nuclear Power Project (ANPP)
Demonstrate the ability to assess plant conditions, classify the event, and identify projected trends and potential conse-quences.
Demonstrate the ability to alert, notify, and mobilize Palo Verde Nuclear Generatin8 Station (PVNGS) emergency response personnel within the time frames specified in the Emergency Plan.
Demonstrate the ability of ANPP to notify agencies in a timely manner.
Demonstrate the adequacy of the Emergency Plan and Emergency Plan Implementing Procedures both in terms of management control of an emergency situation and workability of the procedures at all levels.
Demonstrate the adequacy of security access control to PVNGS emergency response facilities.
Demonstrate the effectiveness and availability of appropriate emergency equipment.
Demonstrate the ability to determine actual or potential offsite radiological hazards and make timely Protection Action Recommenda-tions to offsite agencies.
Demonstrate the ability to track plume passage and monitor contam-ination.
Demonstrate the ability to gather samples and analyze them in a radiological laboratory setting.
1.2 Offsite (State of Arizona, County of Maricopa)
Demonstrate that emer8ency responsa organizations can alert and mobilize emergency response personnel.
Demonstrate the ability to deploy appropriate equipment / personnel in a timely manner.
Demonstrate that timely and accurate decisions can be made re-garding Protective Actions for the Plume Exposure Pathway Emer-gency Planning Zone (EPZ).
Page 2,
EXERCISE OBJECTIVES AND EXTENT OF PLAY Demonstrate that the Radiolcgical Technical Organization can provide assessment and analysis and make appropriate recommen-dations for Protective Actions of a simulated release or radio-iodine and noble gases.
Demonstrate that the Monitoring pool has the capability to perform terrestrial monitoring tasks.
Demonstrate the capability to establish and operate a Reception and Care Center.
Demonstrate access control and traffic regulation in the Plume Exposure Pathway EPZ.
Demonstrate the capability to control access to emergency facili-ties in order to maintain security during an emergency.
1.3 Joint (Arizona Nuclear Power Project, State of Arizona, and County of Maricopa)
Demonstrate timely coordination and release of information to the media through coordinated action by state, county, and utility elements.
Demonstrate that emergency response organizations can activate and staff the direction and control facilities in a tiaely fashion.
Demonstrate the functional adequacy of emergency facilities.
Demonstrate the ability to coordinate Protective Actions in the Plume Exposure Pathway EPZ.
Demonstrate the adequacy of communication links between government emergency facilities, field teams, and the utility's emergency facilities.
Demonstrate the adequacy of communications with public via news media and through other public information channels; i. e., Emer-gency Broadcast System (EBS), Rumor Control, etc.
Demonstrate the ability to implement personnel dasimetry for both utility and government emergency response personnel.
Demonstrate the ability to perform onsite and offsite dose assess-ment in a timely manner.
- Page 3
.~
EXERCISE OBJECTIVES AND EXTENT OF PLAY 2 Activation of all Emergency Response Facilitias in accordance with plans and procedures.
PVNGS Unit 2 Control Rcom and Satellite Technical Support Center (STSC)- (activities performed in simulator).
Technical Support - Center (TSC), Operations Support Center (OSC),
Emergency Operations Facility (EOF), Corporate Emergency Center (CEC) and Forward News Center (FNC).
State Emergency. Operations Center / Technical Operations Center (EOC/ TOC) including:
Public Inquiry Center, Joint Emergency News Center (JENC).
Maricopa County E00.
Radiological Emergency Assessment Team (REAT) Center.
REAT Forward Center.
i Maricopa County Sheriff's Office (MCS0) On Scene Command Post.
Reception and Care Center (1)
+
1