Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261B492 + (16:39:12, 3 January 2025)
- ML19261B490 + (16:39:14, 3 January 2025)
- ML19261B489 + (16:39:16, 3 January 2025)
- 05000318/LER-1979-005-03, /03L-0 on 790129:during Operation,Flow Transmitter Output Was Found Pegged High & Was Bypassed.Caused by Packing Leak in Transmitter Equalizing & Reference Leg Isolation Valves + (16:40:00, 3 January 2025)
- ML19261B487 + (16:40:06, 3 January 2025)
- 05000318/LER-1979-005, Forwards LER 79-005/03L-0 + (16:40:34, 3 January 2025)
- 05000254/LER-1979-004-01, /01T-0 on 790122:piece of Control Rod Drive Return Nozzle Thermal Sleeve Retaining Ring Was Missing.Cause Unknown + (16:40:58, 3 January 2025)
- 05000254/LER-1979-004, Forwards LER 79-004/01T-0 + (16:41:10, 3 January 2025)
- ML19261B481 + (16:41:12, 3 January 2025)
- ML19261B480 + (16:41:16, 3 January 2025)
- ML19261B479 + (16:41:18, 3 January 2025)
- ML19261B477 + (16:41:20, 3 January 2025)
- ML19261B474 + (16:41:24, 3 January 2025)
- ML19261B473 + (16:41:26, 3 January 2025)
- ML19261B472 + (16:41:28, 3 January 2025)
- ML19261B471 + (16:41:29, 3 January 2025)
- ML19261B470 + (16:41:32, 3 January 2025)
- ML19261B469 + (16:41:33, 3 January 2025)
- ML19261B468 + (16:41:35, 3 January 2025)
- ML19261B467 + (16:41:37, 3 January 2025)
- ML19261B466 + (16:41:38, 3 January 2025)
- ML19261B463 + (16:41:41, 3 January 2025)
- ML19261B462 + (16:41:42, 3 January 2025)
- 05000366/LER-1979-017-03, /03L-0 on 790130: a Recombiner Declared Inoperable When Heater Sheath Temp Could Not Be Increased 600 F.Caused by Bad Solder Connection on Power Supply. Connection Resoldered + (16:42:19, 3 January 2025)
- 05000333/LER-1979-007-03, /03L-0 on 790125:jet Pump Operability Surveillance Had Not Been Conducted on 790123-24 as Required.Procedures Subsequently Revised + (16:42:50, 3 January 2025)
- 05000366/LER-1979-017, Forwards LER 79-017/03L-0 + (16:42:59, 3 January 2025)
- 05000333/LER-1979-007, Forwards LER 79-007/03L-0 + (16:43:03, 3 January 2025)
- ML19261B455 + (16:43:04, 3 January 2025)
- ML19261B454 + (16:43:07, 3 January 2025)
- IR 05000348/1978035 + (16:43:10, 3 January 2025)
- IR 05000237/1978029 + (16:43:12, 3 January 2025)
- ML19261B449 + (16:43:16, 3 January 2025)
- ML19261B448 + (16:43:17, 3 January 2025)
- ML19261B438 + (16:43:24, 3 January 2025)
- 05000366/LER-1979-019-03, /03L-0 on 790201:innerdoor Seal & Shaft Seal Found to Be Leaking.Caused by Crack on Inner Lip of Seal,Which Was Replaced.Shaft Seal Was Dry When Removed.Seal Cleaned, Lubricated & Reinstalled to Satisfaction + (16:43:26, 3 January 2025)
- 05000295/LER-1979-009-03, /03L-0 on 780930:quarterly Average Gaseous Release Rate Was Twice Annual Objective But Less than Tech Spec Max. Caused by Reactor Headvent During Refueling & Conservative Quantification Methods + (16:43:29, 3 January 2025)
- IR 05000364/1979001 + (16:43:32, 3 January 2025)
- 05000366/LER-1979-019, Forwards LER 79-019/03L-0 + (16:43:36, 3 January 2025)
- 05000295/LER-1979-009, Forwards LER 79-009/03L-0 + (16:43:39, 3 January 2025)
- ML19261B426 + (16:43:41, 3 January 2025)
- ML19261B424 + (16:43:48, 3 January 2025)
- ML19261B423 + (16:43:48, 3 January 2025)
- ML19261B421 + (16:43:49, 3 January 2025)
- ML19261B420 + (16:43:50, 3 January 2025)
- ML19261B419 + (16:43:51, 3 January 2025)
- ML19261B418 + (16:43:54, 3 January 2025)
- 05000278/LER-1979-003-03, /03L-0 on 790111:during Unit Shutdown for Maint an Instrument Shutoff Valve to Pressure Switch Found Closed Due to Personnel Error.Unit Operated 9 Days W/Instrument Out of Svc.Appropriate Disciplinary Action Taken + (16:43:56, 3 January 2025)
- ML19261B416 + (16:43:58, 3 January 2025)
- ML19261B415 + (16:44:00, 3 January 2025)
- ML19261B412 + (16:44:01, 3 January 2025)
- ML19261B410 + (16:44:03, 3 January 2025)