Text
Y
'9 REPORT OF REACTOR STANDBY CONDITION FOR THE NASA PLUM BROOK MOCKUP REACTOR Reporting Period: January 1,1978 - December 31, 1978 ANNUAL REPORT Licence No. R-93 Docket No. 50-185 February 17, 1979 NASA-Lewis Research Center Plum Brook Station Sandusky, Ohio i
79022603@
I i
l
4 s
REPORT OF REACTOR STANDBY CONDITION FOR THE NASA PLUM BROOK MOCKUP REACTOR Reporting Period:
January 1,1978 - December 31, 1978 The following report has been prepared pursuant to Section 10.l(2) of Attachment A, Change No. 7, Amendment 2 to License No. R-93.
This report covers the 1978 calendar year period of the possess, but not operate license.
1.
Condition of Systems and Components:
The condition of all systems and components vital to the raintenance of a safe standby condition has been carefully reviewed. This includes a review of the records generated during the reporting period for all sys-tems and components specifically noted in the Technical Specifications.
Inspections and T2sts to assure integrity of the Reactor Building and the Mockup Reactor Facility were performed as specified in the Technical Speci fications. The Reactor Building, Mockup Reactor Facility, and each system and component were found to be in the condition specified in the Technical Specifications and/or Standby Procedures.
2.
Changes in Procedures :
There were no significant changes in procedures during the reporting period.
3.
Changes to the Facility:
There were no changes to the MUR Facility during the reporting period.
4.
Other:
An NRC compliance inspection was performed on December 13, 1978. No items of noncompliance were identified during this inspection.