ILLUMINATING BLOG. e PUBLIC SCUARE e CLEVELAND. CHIO 44101 e TELEPHONE (216) 6231350 m MAIL ADDPESS:
P. O. BOX 5000 Serymg Tre er ixtar m ine Naticn Dahvyn R. Davidsc1 vicE *aEsicEst February 12, 1979 SYSTEu ENGINEER NG AND CONSTRUCTCN Mr. James G. Keppler Director of Region III Office of Inspection and Enforcenent U. S. Nuclear Regulatory Cec =ission 799 Roosevelt Road Glen Filyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-MO; 50-W1 Interim Report on S & M Constructors, Inc.'s Quality Assurance Program Breakdown Regarding Control of S & M Subcontractor:
The Halvorsen Boiler and Engineering Co=pany
Dear Mr. Keppler:
Pursuant to the telephone conversation on January 12, 1979, between Messrs.
J. M. Lastovka of CFI and K. Naidu and J. Konklin of yeur office, please, find attached the Interim Report on S & M Constructors, Inc.'s Quality As::urance Procram Breakdown regarding control of S & M Constructors, Inc.'s subcontractor, Ihe Halvorsen Boiler and Engineering Cc=pany.
'Ihe attached Interim Report includes a description of the deficiency, an analysis of the safety i=plications and the corrective action taken,. as required by 10CFR50 5' (e).
J In addition, the Final Report is'sc teduled to be in your office by June 1, 1979 Very truly ypurs, 0M/
r1 o
D. R. Davidson, Vice President - System Engineering and Const:.iction ks:
Attachment ec: John G. Davis., Director (Acting)
Office of Inspection and Enforce =ent U. S. Nuclear Regulatory C H ssion Washington, D.C. 20555
\\
\\
7802230 \\c%
/