UNITED STATES
- gm M009'o,,
NUCLEAR REGULATORY COMMISSION
REGloN 18
g
p
g
.-
-E
101 M ARIETTA STREET. N.W.
'"A
8
ATLANTA, GEORGI A 30303
f
%,*****4
JAN 191979
In Reply Refer To:
RII:MDH
50-364/79-1
Alabama Power Company
Attn:
Mr. F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, Alabama
35291
Gentlemen:
This refers to the inspection conducted by Mr. M. D. Hunt of this office
on January 3-5, 1979, of activities authorized by NRC Construction Permit
No. CPPR-86 for the Joseph M. Farley Plant Unit 2 facility, and to the
discussion of our findings held with Mr. R. E. Hollands, Jr. at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously
identified enforcement matters.
These are discussed in the enclosed
inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information f rom public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear
from you in this regard within the specified period, the report
will be placed in the Public Document Room.
.
7902230 /Of'
.
.
JAN 191979
.
Alabama Power Company
-2-
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
/
C. E. Mu
y, C
f
Reactor Construction and
Engineering Support Branch
Enclosure:
Inspection Report No.
50-364/79-1
cc w/ enc 1:
Mr. R. E. Hollands, Jr. , QA Supervisor
P. O. Box U