Forwards IE Insp Rept 50-364/79-01 on 790103-05.No Noncompliance Noted
ML19261B426
Person / Time
Site: Farley 
Issue date: 01/19/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19261B425 List:
References
NUDOCS 7902230109
Download: ML19261B426 (2)


See also: IR 05000364/1979001

Text

.

UNITED STATES

  1. gm M009'o,,

NUCLEAR REGULATORY COMMISSION

REGloN 18

g

p

g

.-

-E

101 M ARIETTA STREET. N.W.

'"A

8

ATLANTA, GEORGI A 30303

f

%,*****4

JAN 191979

In Reply Refer To:

RII:MDH

50-364/79-1

Alabama Power Company

Attn:

Mr. F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, Alabama

35291

Gentlemen:

This refers to the inspection conducted by Mr. M. D. Hunt of this office

on January 3-5, 1979, of activities authorized by NRC Construction Permit

No. CPPR-86 for the Joseph M. Farley Plant Unit 2 facility, and to the

discussion of our findings held with Mr. R. E. Hollands, Jr. at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously

identified enforcement matters.

These are discussed in the enclosed

inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information f rom public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

.

7902230 /Of'

.

.

JAN 191979

.

Alabama Power Company

-2-

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

/

C. E. Mu

y, C

f

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report No.

50-364/79-1

cc w/ enc 1:

Mr. R. E. Hollands, Jr. , QA Supervisor

P. O. Box U

Ashford, Alabama 36312

.