ML19261B481

From kanterella
Jump to navigation Jump to search
Advises Facility Will Not Completely Meet Physical Security Requirements Prior to 790223.Forwards List of Sys Which Will Be Functional on That Date & Date When All Sys Will Be Operational.List Withheld (Ref 10CFR2.790)
ML19261B481
Person / Time
Site: Pilgrim
Issue date: 02/14/1979
From: Armstrong W
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
79-42, NUDOCS 7902260321
Download: ML19261B481 (1)


Text

a DOSTON EDISON COMPANY GENERAL omCES bod BoyLaTON STREET BDSTON. M ASS ACHU SETTS o219 9 G. CARL ANOCGNINI MANAGER NUCLEAR OPCRATIONE DEPARTMENT February 14, 1979 BECo. Ltr. #79-42 Mr. Thomas A.

Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.

C.

20555 License No. DPR-35 Docket No. 50-293 Security Compensatory Measures in Lieu of Required Physical Security Equipment

Dear Sir:

Please be advised that Pilgrim Nuclear Power Station will not completely meet the physical security requirements mandated by 10CFR73.55 prior to the February 23, 1979 compulsory date.

Attachad for your edification is a list of systems which will be functional on that date, systems which will not be completed by the required date, compensa-tory measures utilized in the interim, and the date when all systems will be operational in conformance with regulatory mandate.

Pursuant to Section 2.790(d) of 10CFR Part 2, we are withholding the information provided in Enclosur 1 of this letter from public inspection. Withholding from public inspection does uc? af fect the right, if any, of persons properl'f and directly concere.ed with the aroject to inapect the information.

Very truly yours, i / -ll ^ ]

/l g,.

-ll,p L.fr

/

Enclosures:

Compensatory Measures

- [

m eg f

P 790226oT&\\

/-f9\\

s

\\