pmR200 UNITED STATES 9'o NUCLEAR REGULATORY COMMISSION
,#
g
,
REGION ll
e g
g 101 M ARIETTA STREET, N.W.
- f ATLANTA, GEORGIA 3o303 o
JAN 111979 Heport No.:
50-348/78-35 Dcchet No.:
50-348 License No.-
NPF-2 Licensee: Alabama Power Company 600 North 18th Street Birmingham, Alabama Facility Name: Farley Unit No. 1 Inspection at:
Ashford, Alabama Inspection conducted: December 19-22, 1978 Inspector:
J. E. Ouzts
'
Accompanying Personne
_
j
,
j fqf
/// 7f Approved by:
s ati Ma unrei P.J.dSd[por,tSect Nucle on No. 2 Reactor Operations and Nuclear Support Branch Inspection Summary Inspection on December 19-22, 1978: (Report No. 50-348/78-35)
Areas Inspected:
Routine, unannounced inspection of calibration program for Unit 1.
The inspection involved 27 inspector-hours on site by one 57C inspector.
Results: Of the area inspected, no items of noncompliance or deviations were 2dentified.
7902230133
.
.
RIl Apt. No. 50-348/78-35 1-1 DETAILS I Prepared by:
,
'/ /
/ // 7f
J uzts,gj/ctorInspector Day'e
~
ear Support Section No. 2 u
Reactor Operations and Nuclear Support Branch Dites of Inspectio ece 19-22, 1978 Reviewed by:
w/
/
/ //
P.
aef
/Dafe
,
Nu Support Section No. 2 Reactor Operations and Nuclear Support Branch 1.
Persons Contacted
- W.
G. Hairston, Plant Manager M. Coleman, Maintenance Engineer N. Dykes, I&C Foreman L. Enfinger, Documents Supervisor H. Erbskon, Maintenance Foreman J. J. Garlington, Operations Supervisor
- K. W. McCracken, Technical Superintendent
- J. J. Thomas, I&C Superviser J. D. Woodard, Assistant Plant Manager
- F, A. Wurster, APCO OQA Engineer The inspector also contacted five ISC technicians and three plant operators.
- Denotes those attending exit inte rview.
2.
Licensee Action on Previous Inspection Findings Not inspected.
3.
Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance or deviations. Two unresolved items disclosed during the inspection are discussed in paragraph 5.
.
.
.
RII Rpt. No. 50-348/78-35 I-2 4.
Exit Interview The inspector met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on December 22, 1978.
The inspector summarized the scope and findings of the inspection as discussed in paragraphs 5 and 6.
The licensee acknowledged the inspector's findings and agreed to take corrective action.
5.
Instrumentation Calibration Program Verification The inspector conducted a review of the following calibration procedures and available test results:
-
FNP-1-STP-201.1(2) & (3) - Pressurizer Level (LT-459, 460 & 461)
Loop Calibration and Functional Test.
-
FNP-1-STP-220.3A
-
Containment Pressure Calibration and Functional Test PT-952.
FNP-1-STP-109 - Power Range Neutron Flux Channel Calibration
-
(HB).
-
FNP-1-STP-121 - Power Range Of fset Calibration.
-
FNP-1-STP-612.0 - Reactor Coolant Pump Bus Reactor Trip Under-Voltage Relay Functional Test.
-
FNP-1-STP-613.0 Reactor Coolant Pump Bus Reactor Trip
-
Underfrequency Test.
FNP-0-1MP-006 - Heise Gauge Calibration (>ta PSIG) (<30 PSIG)
-
-
FNP-0-1MP-008 - Ashcrof t Test Pressure Gauge Lalibration.
-
FNP-0-1MP-43 - Air Sampling Station Gasmeter Calibration.
FNP-0-lMP-201.3 - Reactor Coolant Pump No.1 Seal Water Flow Loop
-
(FT-130)
FNP-1-STP-201.5 - Pressurizer Pressure (PT-456) Loop Calibration
-
and Functional Test.
-
FNP-1-STP-201.16 - Reactor Coolant Loop Pressure Wide & Narrow Range (PT-402, 403) Loop Calibration and Functional Test
.
.
-
RII Rpt. No. 50-348/78-35 I-3
'
-
t
-
FNP-1-STP-213.1 - Steam Generator IA-LT (474, 475, 484-486 & 494-496) Loop Calibration and Functional Test.
NIS Power Channels N41, N42, N43 & N44 FNP-1-STP-228.5
-
-
Calibration and Functional Test.
Response Spectrum Recorder Calibration and FNP-1-STP-254.4
-
-
,
Functional Test.
-
FNP-1-STP-205.1 - Refueling Water Storage Tsak Level (L7-501).
-
FNP-1-STP-223.1
- Electrical Hydrogen Recombiner (IA-1B)
Calibration.
FNP-1-STP-247.1 - Turbine Impulse Pressure (PT-466 & 467) Loop
-
,
Celibration and Functional Test.
-
FNP-0-STP-530 - Radiological Calibration of the Liquid Waste Processing Monitor - (R-18).
-
FNP-0-STP-532 - Radiological Calibration of the Vent Stack Radiogas Monitor - (R-22B).
\\
-
FNP-0-STP-533 - Radiological Calibration of the Steam Generator
-
Blowdown Monitor - (R-23B).
FNP-0-1MP-201.1 - Pressurizer Liquid Temperature - (TE-453).
-
-
FNP-0-1MP-201.2 - Pressurizer Surge Line Temperature -
(TE-450).
FNP-1 - IMP-201.28 - Pressurizer Relief Tank Level - (LT-470).
-
The procedures and available calibration results, were reviewed to verify:
Reviews and approvals were being conducted, and data was recorded and evaluated.
,
Test instruments were listed and identified in test results.
i Adherence to technical specifications requirements and limiting conditions for operation were observed.
.
.
.
RII Rpt. No. 50-348/78-35 I-4 Technical contents were correct and verification of return of equipment to service and removal of test equipment were being done.
The inspector conducted an inspection of measuring and test equipment laboratory facilities and reviewed laboratory records as follows:
Instrumentation and control standards laboratory.
Measuring and test tool storage and issuing facility.
Test instrument calibration and control procedures reviewed and test instruments inspected including the following:
Procedures
-
FNP-0-1MP-0 (3/9/77) Tool Identification, Use and Storage.
FNP-OelHP-0.2 (3/9/77) - Parts, Storage, Use and Control.
-
FNP-0-lMP-0.3 (4/4/77) - lustrument. tion and Control Preventative
-
Maintenance.
-
FNP-9-1MP-0.6 - (7/18/78) Instrumentation and Control Group Numtt ring and Filing.
FNP-0-1MP-14 (1/5/76) Leeds and Northrup 4287 Kelvin Bridge
-
Calibration Check.
FNP-0-1MP-20 - (10/25/~ 5) Fluke 812DA Digital Multimeter Check.
-
FNP-0-;MP-56 (10/22/75) Wallace and Tiernan Model 650120
-
Pneumatic Calibrator Calibration.
Instruments
-
AMETEK Pneumatic Dead weight Tester FNP-2 - MGK-0011.
Fluk: DC Digital Multimeter - Model 343A - FNP-LEC-0510.
-
100 ORM Standard Resistor - Leeds and Northrup S/N 1832146 -FNP-
-
LNR-0143.
.
.
RII Rpt. No. 50-348/78-35 I-5 Starrett Micrometer Set - FNP-APCO-001-024.
'
-
Gauge Block - Brown and Sharpe - FNP-SET-GB-302.
-
These facilities were inspected to verify:
That standard test instruments were labeled and included in the equipment calibration program.
Instruments were calibrated on schedule and labeled with calibration status.
Storage facilities were proper for protecting the equipment.
Nonconforming equipment was being tagged and provided with segregated storage.
Certification and calibration records were available and being maintained for measuring and test equipment.
Personnel manning these facilities, and performing instrument calibrations were properly qualified.
The inspector witnessed the performance of the following calibration tests:
FNP-1-STP-220.8 - Containment Cooler Condenser Level A-LT3396D.
-
FNP-1-STP-228.8A - Power Range N44 Calibration.
-
Calibration testing was witnessed to verify:
That the correct procedure was being used;
-
-
Prerequisites for the test had been established; Calibrated test instruments were being used;
-
Stations were manned and communications established;
-
Data were properly collected and evaluated;
-
The technicians understood the instruments and procedures.
-
Within the areas inspected no items of noncompliance or deviations were found.
In two areas inspected the inspector found two items that required resolution. Section 4 of surveillance test procedures FNP-0-STP-530 and FNP-0-STP-533 contain an error in the requirement to secure the Vent Stack Radiogas Monitor during the performance of these tests.
The second item was the calibration sticker was missing from gauge
.
.
.
RII Rpt. No. 50-348/78-35 1-6 block FNP-SET-GB-302.
The licensee acknowledged these discrepancies and agreed to take corrective action. These will be carried as unresolved items 78-35-01 an?. 78-35-02, and corrective action verified by NRC at a subsequent inspection.
6.
Operational Status of Plant Inspection The inspector toured the control room and discussed the plant operationg status with the operators and verified that operations were in accordance with licensing requirements. The licensee reported to the inspector a water leak in the main generator exciter heat exchanger, and the placing of the plant in hot standby to perform an inspection of the exciter. Af ter shutdown the source of the water was found to be water overflow due to a plugged heat exchanger condensate drain line.
The problem was immediately corrected, the exciter inspected and the plant returned to power.
As a result of this tour and witnessing of portions of placing the plant in hot standby and return to power, the inspector had no items of concern or unresolved questions.
.