I F2A
'
(g*"800 jo,,
NUCLEAR REGULATORY COMMISSION
UNITED STATES
9
REGloN 11
Tp
g
2
101 M ARIETTA STREET. N.W.
-E
~
li
ATLANTA. GEORGI A 30303
o,s....../
In Reply Refer To:
RII:JE0
50-348/78-35
Alabama Power Company
Attn: Mr. A. R. Barton
Executive Vice President
Post Of fice Box 2641
Birmingham, Alabama
35291
Gentlemen:
This refers to the inspection conducted by Mr. J. E. Ouzts of this of fice
on December 19-22, 1978, of activities authorized by NRC License No. NPF-2
for the Farley Unit 1 facility, and to the discussion of our findings held
with Mr. W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
Two new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a ecpy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contractor) believe
to be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure.
Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is proprie-
tary, and should be prepared so that proprietary information identified in
the application is contained in a separate part of the document.
If we do
not hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
.
.
7 9 0 2 2 3 01d.$
.
.
Alabama Power Company
-2-
JAN 111979
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
h]4$/2+
n
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No.
50-348/78-35
cc w/ encl:
Mr. R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford, Alabama
36312