Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235H030 + (10:31:57, 3 December 2024)
- ML20235H029 + (10:31:57, 3 December 2024)
- ML20235H025 + (10:31:58, 3 December 2024)
- IR 05000483/1987021 + (10:31:59, 3 December 2024)
- ML20235H021 + (10:32:00, 3 December 2024)
- ML20235H018 + (10:32:00, 3 December 2024)
- IR 05000333/1989001 + (10:32:01, 3 December 2024)
- NRC-89-0019, Monthly Operating Rept for Jan 1989 for Fermi 2 + (10:32:02, 3 December 2024)
- ML20235H014 + (10:32:02, 3 December 2024)
- ML20235H013 + (10:32:03, 3 December 2024)
- TXX-6759, Interim Deficiency Rept CP-87-70 Re Prebend Pipe Wall Thickness Due to Inadequate QC Insp Procedures.Initially Reported on 870824.Evaluation Continuing.Next Rept Will Be Submitted by 871218 + (10:32:04, 3 December 2024)
- ML20235H005 + (10:32:05, 3 December 2024)
- ML20235H002 + (10:32:06, 3 December 2024)
- ML20235H004 + (10:32:06, 3 December 2024)
- ML20235H000 + (10:32:07, 3 December 2024)
- ML20235G996 + (10:32:08, 3 December 2024)
- ML20235G994 + (10:32:09, 3 December 2024)
- TXX-6764, Final Deficiency Rept CP-86-62 Re Misinterpretation of Polar Crane Load Cases.Initially Reported on 861003.Installation of Addl Rail Clips Scheduled for Completion by 871009 + (10:32:09, 3 December 2024)
- W3P89-0042, Monthly Operating Rept for Jan 1989 for Waterford 3.W/ + (10:32:10, 3 December 2024)
- IR 05000259/1987020 + (10:32:25, 3 December 2024)
- ML20235G979 + (10:32:25, 3 December 2024)
- ML20235G977 + (10:32:27, 3 December 2024)
- ML20235G978 + (10:32:27, 3 December 2024)
- IR 05000320/1988020 + (10:32:30, 3 December 2024)
- ML20235G975 + (10:32:30, 3 December 2024)
- ML20235G972 + (10:32:31, 3 December 2024)
- ML20235G970 + (10:32:32, 3 December 2024)
- ML20235G971 + (10:32:32, 3 December 2024)
- 05000424/LER-1987-034, :on 870607,reactor Tripped on Steam Generator 4 lo-lo Water Level Following Check Valve Failure Due to Inadequate Hinge Pin Design.Redesigned Pins Installed.Logic for Valves Modified.Part 21 Related + (10:32:34, 3 December 2024)
- PNO-III-87-094, on 870709,w/unit in Shutdown for Maint,Smoke from Smoldering Fire in Main Condenser Observed.Smoke Emanated from Smoldering Piping Insulation Inside Condenser. Cause of Fire Unknown.No Release of Radioactivity Occurred + (10:32:35, 3 December 2024)
- ML20235G965 + (10:32:35, 3 December 2024)
- ML20235G964 + (10:32:36, 3 December 2024)
- TXX-6733, Interim Deficiency Rept CP-87-66 Re Hand Tightened Bolts in Structural Steel Connections W/Inadequately Spoiled Threads. Initially Reported on 870824.Design Change Authorization 46624 Issued.Next Rept Will Be Submitted by 880329 + (10:32:37, 3 December 2024)
- ML20235G958 + (10:32:37, 3 December 2024)
- ML20235G952 + (10:32:40, 3 December 2024)
- ML20235G951 + (10:32:41, 3 December 2024)
- ML20235G944 + (10:32:43, 3 December 2024)
- ML20235G945 + (10:32:43, 3 December 2024)
- ML20235G940 + (10:32:46, 3 December 2024)
- ML20235G938 + (10:32:46, 3 December 2024)
- ML20235G935 + (10:32:47, 3 December 2024)
- ML20235G936 + (10:32:47, 3 December 2024)
- ML20235G934 + (10:32:48, 3 December 2024)
- ML20235G931 + (10:32:49, 3 December 2024)
- ML20235G929 + (10:32:49, 3 December 2024)
- B12669, Forwards Relief Requests 5.0 & 4.0 for Relief from ASME Code Section XI Requirements for Inservice Insp of Category B-J Welds & Specific Valve Internal Surface Visual Exams, Respectively.W/One Oversize Drawing.Fee Paid + (10:32:51, 3 December 2024)
- ML20235G925 + (10:32:51, 3 December 2024)
- ML20235G923 + (10:32:52, 3 December 2024)
- ML20235G922 + (10:32:52, 3 December 2024)
- ML20235G918 + (10:32:53, 3 December 2024)
- ML20235G920 + (10:32:53, 3 December 2024)
- ML20235G913 + (10:32:54, 3 December 2024)