ML20235G923
| ML20235G923 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/08/1987 |
| From: | Zech G NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20235G926 | List: |
| References | |
| NUDOCS 8707140429 | |
| Download: ML20235G923 (2) | |
See also: IR 05000259/1987020
Text
__ -_
-
. v.
.
"
JUL 0 8198'i
Docket Nos.
50-259, 50-260, and 50-296
License Nos.
Te nessee Valley Authority
J
/ ATTN:
Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
NOTICE OF DEVIATION
. (NRC INSPECTION REPORT NOS.
50-259/8/ s , 50-260/87-20 and
50-296/87-20)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. L. Paulk on May 1-31, 1987. The inspection included a review of activities
authorized for yo0r Browns Ferry facility.
At the conclusion of the inspec-
tion, the findings were discussed with those members of your staff identified
in the enclosed inspection report.
Areas examined dcring the inspection are identified in the report.
These
areet included operational safety, maintenance observation, IE Information
Notice processing, reportable occurrences, previous enforcement activities
rev ew, quality assurance, configuration control drawing review, and the
review of licensee's implementation of their contractor recommendations.
With-
in these areas, the inspection consisted of selective examinations of proce-
dures and representative records, interviews with personnel, and observation of
activities in progress.
4
The inspection revealed no violations of NRC requirements.
However, based on
inspector followup of a previous unresolved item (50-259,260,296/86-25-04)
regarding the mounting adequacy of control room panels, a deviation from your
Final Safety Analysis Report was identified.
The mounting of the control
panels on the shaker table for vibration testing was found to be different from
the existing service mounting.
The deviation and the elements to be included
in your response are described in the enclosed Notice of Deviation.
'
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will oe placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the-
Paperwork Reduction Act of 1980, PL 96-511.
G707140429 870708
ADOCK 0500
9
I
ZFo/
_ _ _ _ _ _ .
. _ .
._
'.
,
, Tennessee Valley Authority
2
JUL 0 8191TT
Should you have any questions concerning this letter, please contact us.
Sincerely,,
,
ORIGINAL SIGNED BY
GARY G. ZECH
Gary G. Zech, Assistant Director,
Inspection Programs
Division of TVA Projects
Office of Special Projects
Enclosures:
1.
Notice of Deviation
2.
NRC Inspection Report
cp w/encls:
vH. P. Pomrehn, Browns Ferry Nuclear
Plant Site Director
p ' 1. Lewis, Plant Manager
R.
t'R.j L. Gridley, Director
Nuclear Safety and Licensing
W A. Kirkebo, Director
Nuclear Engineering
ty e'J. May, Manager of Site Licensing
bcc w/encls:
(E G. Keppler, OSP
Se D. Ebneter, OSP
tlJI A. Zwolinski, OSP
,Br D. Liaw, OSP
657 D. Richardson, OSP
L rE. Gears, OSP
G
7
F. Stang, OSP
J
X R. Connelly, DIA
K. ,P. Barr, OSP/RII
uMRC Resident Inspector
Document Control Desk
State of Tennessee
RII
RII
RII
'
'
A
trI1s'
KB r
A
on: cc
6D9/87
6/b)/87
6/2y/87
- - - - -