Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20150A642 + (20:57:22, 24 May 2025)
- ML20150A641 + (20:57:23, 24 May 2025)
- ML20150A275 + (20:57:47, 24 May 2025)
- IR 05000530/1987036 + (20:58:28, 24 May 2025)
- IR 05000250/1987038 + (21:06:28, 24 May 2025)
- TAC:62257 + (21:06:53, 24 May 2025)
- ML20149M758 + (21:07:00, 24 May 2025)
- ML20149M645 + (21:07:53, 24 May 2025)
- ML20149M634 + (21:07:56, 24 May 2025)
- ML20149M588 + (21:08:17, 24 May 2025)
- ML20149M564 + (21:09:14, 24 May 2025)
- ML20149M550 + (21:09:18, 24 May 2025)
- ML20149M540 + (21:09:21, 24 May 2025)
- ML20149M461 + (21:09:48, 24 May 2025)
- 05000206/LER-1988-003, :on 880208,discovered That Info Provided by Westinghouse in 1985 Re Main Steam Line Break Analysis in Error.Action Commenced to Ensure Safety Injection Sys Piping Has Boron Concentration in Excess of 3,750 Ppm + (21:10:38, 24 May 2025)
- ML20149M171 + (21:13:29, 24 May 2025)
- ML20149M128 + (21:13:40, 24 May 2025)
- ML20149L890 + (21:15:58, 24 May 2025)
- ML20149L827 + (21:16:15, 24 May 2025)
- ML20149L778 + (21:16:32, 24 May 2025)
- ML20149L768 + (21:16:35, 24 May 2025)
- ML20149L667 + (21:17:01, 24 May 2025)
- ML20149L575 + (21:17:38, 24 May 2025)
- 05000346/LER-1997-009-01, Forwards LER 97-009-01,providing Revised Date of Completion for Corrective Actions to Implement New Funtional Test Surveillance Procedure for Testing of Essential Electrical Bus Undervoltage Relays + (21:17:53, 24 May 2025)
- ML20149L479 + (21:18:17, 24 May 2025)
- ML20149L468 + (21:18:20, 24 May 2025)
- ML20149L336 + (21:19:05, 24 May 2025)
- ML20149L295 + (21:19:35, 24 May 2025)
- ML20149L208 + (21:19:59, 24 May 2025)
- TAC:67181 + (21:20:05, 24 May 2025)
- ML20149L112 + (21:20:55, 24 May 2025)
- ML20149L064 + (21:21:12, 24 May 2025)
- 05000461/LER-1996-013, :on 961015,inadequate Actuator Design Occurred. Caused by Svc Conditions Experienced & Inherently Stringent Leakage Criteria.Procedure Revised + (21:21:24, 24 May 2025)
- ML20149K888 + (21:22:07, 24 May 2025)
- ML20149K872 + (21:22:11, 24 May 2025)
- ML20149K869 + (21:22:12, 24 May 2025)
- ML20149K845 + (21:22:19, 24 May 2025)
- TAC:M97861 + (21:22:25, 24 May 2025)
- ML20149K706 + (21:22:58, 24 May 2025)
- ML20149K412 + (21:23:43, 24 May 2025)
- ML20149K326 + (21:24:09, 24 May 2025)
- 05000289/LER-1997-008, :on 970621,power to Control Rod Drive Mechanisms Was Lost & Reactor Tripped.Caused by Long Trip Insertion Times at Tmi.Rods Were Trip Tested Per Surveillance Procedure 1303.11.1 + (21:24:13, 24 May 2025)
- ML20149K242 + (21:24:16, 24 May 2025)
- 05000353/LER-1997-007, :on 970623,HPCI Sys Was Declared Inoperable Due to Clogged Turbine Exhaust Drain Line.Disassembled & Cleaned HPCI Turbine Exhaust Drain Pot Drain Line + (21:24:22, 24 May 2025)
- ML20149K185 + (21:24:33, 24 May 2025)
- ML20149K165 + (21:24:38, 24 May 2025)
- 05000266/LER-1997-031, :on 970619,discovered That Auxiliary Feedwater (AFW) Pump Low Suction Pressure Trip Setpoints May Not Ensure Adequate Suction Pressure Protection for AFW Pumps Following Tornado Event.Caused by Inadequate Design + (21:24:41, 24 May 2025)
- 05000245/LER-1996-003, :on 960111,discovered Existing Anchorage of EDG Day Tank Not Seismically Adequate.Caused by Original Design Deficiency.Anchorage of EDG Tank Will Be Graded to Meet Design Basis of Seismic Load Requirements + (21:24:46, 24 May 2025)
- ML20149K131 + (21:24:49, 24 May 2025)
- IR 05000261/1992013 + (21:26:05, 24 May 2025)
- ML20149K043 + (21:26:10, 24 May 2025)