15.6.12 CONTAINMENT LEAKAGE RATE TESTING PROGRAM i
A.
A program shall be established to implement th leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Based Containment Leak-Test Program," dated September, 1995, as modified by the following exceptions" 1.
The interval between the 1992 Unit 2 Type A test and the next Unit 2 Type' A test shall be 60 months.
B.
The peak design containment internal accident pressure, P, is 60 psig.
C.
The maximum allowable primary containment leakage rate, L, at P, shall be 0.4% of containment air weight per day.
i D.
Leakage rate acceptance criteria are:
1.
The containment leakage rate acceptance criterion is sl.0 L,.
2.
During the first unit startup following testing in accordance with this program, the leakage rate acceptance l
criteria are s 0.6 L, for the combined Type B and Type C l
tests and 50.75 L, for Type A tests.
E.
The provisions of Specification 15.4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
F.
The provisions of SpeHfication 15.4.0.3 are applicable to the Containment Leakage Ra, Testing Program.
96a1100008 961113 PDR ADOCK 05000266 P
PDR Unit 1 - Amendment No. 169 15.6.12-1 Unit 2 - Amendment No. 173 l
Corrected November 13, 1996 1
15.6.12 CONTAINMENT LEAKAGE RATE TESTING PROGRAM A.
A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Baser: Contr41nment Leak-Test Program," dated September, 1995, as sod',fied by the following exceptions" 1.
The interval between the 1992 Unit 2 Type A test and the next Unit 2 Type A test shall be 60 months.
B.
The peak design containment internal accident pressure, P, is 60 psig.
C.
The maximum allowable primary containment leakage rate, L, at P, shall be 0.4% of containment air weight per day.
D.
Leakage rate acceptance criteria are:
1.
The containment leakage rate acceptance criterion is s1.0 L,.
2.
During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are s 0.6 L, for the, combined Type B and Type C tests and 50.75 L, for Type A tests.
E.
The provisions of Specification 15.4.0.2 do not apply to the l
test frequencies specified in the Containment Leakage Rate I
Testing Program.
F.
The provisions of Specification 15.4.0.3 are applicable to the Containment Leakage Rate Testing Program.
Unit 1 - Amendment No. 169 15.6.12-1 Unit 2 - Amendment No. 173 Corrected November 13, 1996 i