Ack Receipt of 871125 Response to Violations Noted in Insp Repts 50-289/87-14 & 50-320/87-06
ML20149M461
Person / Time
Site: Crane  
Issue date: 02/17/1988
From: Marten T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8802260057
Download: ML20149M461 (2)


See also: IR 05000289/1987014

Text

. . , -

-

.

. _-

-

.

cl*

,$

'

I

.

t..

-

,

i

-l

'.

.;

FEB 17 1968

!

!

!

i

Docket No; 50-289

<

'

50-320

'

r

n

i

,

k

-

i

'

GPU Nuclear Corporation

'

ATTN: Mr. H. D. Hukill

i

Vice President and Director of TMI-1

c

!-

P. O. Box 480

'i

i

Middletown, Pennsylvania 17057

i

5

Gentlemen:

!

Subject: .tnspection 50-289/87-14;_50-320/87-06

l

I

This refers to your letter dated November 25, 1987 in response to our letter

i

j

dated October 28, 1987.

!

,

,

l

Thank you for informing us of the corrective and preventive actions document 7d

!

in your letter. These actions will be examined during a future inspection oF

i

your licensed program.

.

Your cooperation with us is appreciated.

!

!

Sincerely.

-

t

OrDM Ucned By:

i

I?r:.n.r& my

'

Thomas T. Martin, Director

i

Division of Radiation Safety

,

and Safeguards

,

i

i

i

.

.

OFFICIAL RECORD COPY

F1 TMI 1&2 87-14 - 0001.0.0

Il

C2/09/88

8802260057 800217

.

' . -

PDR

ADOCK 05000289

G

PDR

g

.

GPU Nuclear Corporation

2

FEB 17 Jggg

.

cc w/ encl:

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, Manager, TMI-1 Licensing

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr. , Esquire

THI-Alert (TMIA)

Susquehanna Valley Alliance (SVA)

T. F. Demmitt, Deputy Director, TMI-2

R. E. Rogan, Licensing and Nuclear Safety Director

J. J. Byrne, Manager, THI-2 Licensing

J. E. Frew, Defueling Director

J. B. Lieberman, Esquire

A. Miller, Manager, Plant Operations

Ernest L. Blake, Jr. , Esquire

W. Potts, TMI-2 Site Operations Director

TMI-Alert (TMIA)

Susquehanna Valley Alliance (SVA)

Public Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

W. D. Travers Director TMI-2 Cleanup Project Directorate

J. Goldberg, OELO: HQ

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

,

Gordon Edison, FM, NRR

K. Abraham, PA0

Robert J. Bores, DRSS

!

,

SSI [

RI bRSS

h

R ORSS

RIt

Amato/ejr

Lazarus

Bellamy

2/ /88

2/)/88

2/*/88

0FFICIAL RECORD COPY

RL TMI 1&2 87-14 - 0001.1.0

02/02/88

i

)

-)

-

.

.

.

-

GPU Nuclear Corporation

. Da Muclear

reema=

o

Middletown, Pennsylvania 17057 0191

717 944 7621

TELEX 84 2386

Writer's Direct Olal Number:

.

November 25, 1987

5211-87-2220

4410-87-L-0172

Mr. William T. Russell

Region I, Regional Administrator

U.S. Nuclear Regulatory Commission

631 Park Avenue

King of Prussia, PA 19406

Dear Mr. Russell:

Three Mile Island Nuclear Station, Unit 1 & Unit 2 (TMI-1 & TMI-2)

Operating License Nos. D?R-50 and DPR-73

Docket Nos, 50-289 and 50-320

Notice of Violation Response for

Inspection Report 50-289/87-14 and

Inspection Report 50-320/87-06

Attachment I to this letter is GPUN's response to Appendix A of Inspection

Report No. 30-289/87-14 and 50-320/87-06 "Notice of Violation."

Sincerely,

. D.

'

Vice President & Director THI-1

HDH/DYH/spb:1039A

cc:

R. Conte

G. U tson

Document Control Desk

.

.

~ 7 {l37p$$PbD,

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

..

.

i

.

,

.

ATTACHMENT I

-

,

'

NOTICE OF VIOLATION

GPU Nuclear Corporation

Docket Nos. 50-289

-

Three Mile Island Nuclear Generating Station

50-320

.

.

As a result of the inspection conducted on July 20-24, 1987, and in accordance

with the NRC Enforcement Policy (10 CFR 2, Appendix C) the following violation

was identified:

,

A.

Item V of Appendix E to 10 CFR 50 requiro3 Itcensees who are authorized to

"

operate a nuclear power facility to submit any changes to the emergency

'

plan or procedures to the Commission as specified in 10 CFR 50.4(b)(5)

within 30 days of such changes.

.

Contrary to the above, GPU Nuclear Corporation failed to submit to the NRC

Revisions 1-04 "effective June 2,1987" and 1-03 (no effective date given)

t

of "Operation of the Parsippany Technical Functions Center,"

5000-ADM-3054.01 (Rev.1-04, EP-033).

This violatfoa has been categorized

as Severity IV per Item D of Supplement VIII to Appendix C to 10 CFR 2.

4

]

b

^

'

GPUN RESPONSE

Prior to this violation, GPUN interpreted the requirements of 10 CFR 50.4 to

i

r

apply strictly to procedures categorized as Emergency Plan Implementing

'

Procedures (EPIP). Procedure 5000-ADM-3054.01, "Operation of the Parsippany

.

Technical Functions Center (PTFC)," is a procedure controlled and distributed

!

,

by the Technical Functions Division which had been previously categorized as

"

i

an EPIP. Technical Functions considered this an engineering procedure rather

J

than an emergency plan implementing procedure and did not distributt this

i

procedure in accordance with the requirements of 10 CFR 50.4

-

I

Once identified by the NRC inspector, Procedure 5000-ADM-3054.01 was

l

immediately distributed in accordance with 10 CFR 50.4(b)(5) via GPUN letter

5211-87-2147 dated July 24, 1987.

i

S:bsequently, a review was conducted to ensure a similar situation did not

exist regarding other procedures.

It was determined from this review that the

THI-1 Emergency Dose Calculation Manual (EDCM) and GPUN procct:re

8200-ADM-1720.02 Emergency Public Information Plan and Procedure (this

,

,

J

procedure was under development at the time of the review) could also be

j

considered emergency plan implementing procedures.

Both of these procedures have been forwarded to the NRC in accordance with

10 CFR 50.4 and action has been taken to ensure that future revisions will be

forwarded to the NRC.

l

1

.

'

s

.

1

l

'

.-

- ... .

.

.

.

.

.

, ,

+

,1

.-

~

-

.

j

'

- -

ATTACHMENT I (CONT'D)

In addition to the above stated r'eview, a memo was sent to the GPilN Division

Safety Review Coordinators '0y the-5?UN Manager, Emergenc;.' Preparedness. Thi s

.

memo addressed this dolation an6 reinforcrd.the need to.'be cognizant of the

requirements of 10 CFR 50. A' for all future revisions to' procedures.

With the above steps taken,' GPUN believes -that full co,mpliance has been

achieved in transmittjng EPIPs to the.NRC.'

.,