Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195F901 + (13:05:16, 24 May 2025)
- L-98-272, Comment on Draft Reg Guide DG-4005, Preparation of Suppl Environ Repts for Applications to Renew Nuclear Power Plant Operating Licenses + (13:05:28, 24 May 2025)
- 05000458/LER-1999-010, :on 990428,inadvertent Breach of Fuel Bldg Integrity Occurred.Caused by Failure to self-check. Administrative Control Was Instituted to Place Control of Door SH-113-01 Under on-shift Operations SS + (13:05:58, 24 May 2025)
- 05000458/LER-1999-011, :on 990510,initiation of Div I DG & ECCS Injection Into Rv Occurred.Caused by Failed,Unsealed Capacitor on Rosemount Trip Unit.Replaced Failed Trip Unit & Evaluated Methods to Reduce Consequences of Same Failures + (13:06:05, 24 May 2025)
- ML20195F354 + (13:07:48, 24 May 2025)
- ML20195F307 + (13:08:04, 24 May 2025)
- ML20195F289 + (13:08:08, 24 May 2025)
- ML20195F270 + (13:08:13, 24 May 2025)
- ML20195F263 + (13:08:15, 24 May 2025)
- L-98-218, Forwards Response & Calculations in Response to 980728 NRC Ltr Which Requested Addl Info Re IPEEE for Bvps,Unit 2 + (13:08:41, 24 May 2025)
- ML20195F177 + (13:08:45, 24 May 2025)
- ML20195F173 + (13:08:47, 24 May 2025)
- ML20195F062 + (13:09:16, 24 May 2025)
- ML20195E917 + (13:09:58, 24 May 2025)
- 05000482/LER-1997-027, :on 971122,missed Surveillance Was Noted.Caused by Improper Circuitry Configuration & Inadequate Procedure. Revised Procedure STS RP-004 & Work Groups Will Discuss PIR 99-1777 + (13:10:59, 24 May 2025)
- IR 05000192/1986001 + (13:11:07, 24 May 2025)
- NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With + (13:12:01, 24 May 2025)
- ML20195E410 + (13:12:51, 24 May 2025)
- ML20195E405 + (13:12:53, 24 May 2025)
- ML20195E373 + (13:13:08, 24 May 2025)
- 05000461/LER-1998-033, :on 981007,inappropriate Clearing of Caution Tagout Resulted in Improved TS LCO 3.4.10 Action A.1 Not Being Met.Caused by Tunnel Vision & Inattention to Detail. New Caution Tagout for Div 2 Shutdown Svc Water,Established + (13:13:42, 24 May 2025)
- 05000361/LER-1998-022, :on 981014,shutdown Cooling Sys Was Inoperable Due to Inadequate Surveillance Test.Caused by Failure to Consider Impact of Total Loop Uncertainty.No Corrective Actions Required + (13:14:18, 24 May 2025)
- 05000266/LER-1998-027, :on 981013,inadequate TS Surveillance Testing of non-essential Svc Water Isolation Logic,Was Identified. Caused by Failure of Existing Test Procedure to Adequately Consider All Postulated Failure Modes.Procedures Changed + (13:15:00, 24 May 2025)
- ML20195D952 + (13:16:28, 24 May 2025)
- 05000341/LER-1998-006, :on 980905,failure of MSIVs to Meet Local Leak Rate Acceptance Criteria Was Noted.Caused by Minor Scale on Seat & Poppet,Linear Indications & Indentations in Nose Cone Area.Repaired & Retested Valves + (13:16:55, 24 May 2025)
- ML20195D853 + (13:18:02, 24 May 2025)
- ML20195D847 + (13:18:07, 24 May 2025)
- ML20195D846 + (13:18:10, 24 May 2025)
- 05000336/LER-1997-037-01, Forwards LER 97-037-01,documenting Event That Occurred at Mnps,Unit 2 on 971126.Suppl Provides Conclusions from Insps & Repairs Conducted in Response to Event + (13:18:16, 24 May 2025)
- TAC:MA0640 + (13:18:28, 24 May 2025)
- L-98-206, Informs of Change in Scheduled Completion Date for Commitment Made in Response to Listed Insp Repts.Safety Culture Training to Operations & Maint Personnel Will Now Be Provided by 990731 + (13:19:01, 24 May 2025)
- NPL-98-0950, Provides 120-day Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment + (13:19:04, 24 May 2025)
- TAC:M98835 + (13:22:16, 24 May 2025)
- ML20195D541 + (13:22:24, 24 May 2025)
- L-98-217, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (13:22:26, 24 May 2025)
- L-98-214, Requests Withdrawal of 981016 LAR 134,permitting Surveillance Interval Specified in SR 4.8.1.1.1.b.Subject Surveillance Was Completed on 981105 Following Unplanned Outage of Plant + (13:22:42, 24 May 2025)
- ML20195D487 + (13:22:46, 24 May 2025)
- ML20195D466 + (13:22:53, 24 May 2025)
- ML20195D381 + (13:23:38, 24 May 2025)
- 05000282/LER-1998-013, :on 981011,discovered That Scaffold Installation Interfered with Operability of Steam Exclusion Check Damper.Caused by Inadequate Procedural Guidance.Util Removed Interfering Portion of Scaffold & Revised Procedure + (13:23:49, 24 May 2025)
- IR 05000194/2029001 + (13:23:57, 24 May 2025)
- NUREG-1671, Notice of Reopening of Public Comment Period Unitl 991119 for NUREG-1671 Entitled, Standard Reivew Plan for Recertification of Gaseous Diffusion Plants + (13:26:10, 24 May 2025)
- ML20195D215 + (13:26:14, 24 May 2025)
- ML20195D210 + (13:26:15, 24 May 2025)
- TAC:M83636 + (13:26:47, 24 May 2025)
- ML20195D137 + (13:26:52, 24 May 2025)
- ML20195D078 + (13:27:09, 24 May 2025)
- L-94-014, Rev 1 to Safety Analysis of Radiological Consequences of SBLOCA at U2 with Delayed CNMT Spray Actuation & NUREG-1465 Core Damage Progression + (13:27:17, 24 May 2025)
- ML20195D058 + (13:27:21, 24 May 2025)
- L-98-195, Provides Response to RAI as Requested During 980924 Conference Call to Support Review of LAR 120.LAR Described Unreviewed Safety Question Resulting from Increase in Locked Rotor Accident Dose Consequences + (13:27:46, 24 May 2025)
- ML20195C861 + (13:28:23, 24 May 2025)