JUN 4 5 86 Ir. Reply Refer To:
Dockets:
50-192/86-01 50-602/86-01 University of Texas
College of Engineering Department of Mechanical Engineering Nuclear Engineering Program ATTN:
Dale E. Klein, Director Nuclear Engineering Laboratory Austin, Texas 78712 Gentlemen:
This refers to the inspection conducted by Messrs. G. L. Constable, R. C.
i Stewart, and J. G. Luehman of this office and Messrs. D. Tondi and J. Dosa of the Office of Nuclear Reactor Regulation (NRR) during the period April 10-11, 1986, of activities authorized by NRC Operating License R-92 and Construction j
Permit CPRR-123 for the University of Texas, and to the discussion of our
findings with members of your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status; I&E Information Notices; logs, records, and organization; review and audit; requalification training; procedures; experiments; surveillance; emergency plan; health
'
physics; transportation activities; and your plans to build a new reactor facility. Within these areas, the inspection consisted of selective i
examination of procedures and representative records, interviews with personnel, and observation by the inspectors.
These findings are documented in
!
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were identified.
However, the ambitious program you are presently undertaking in which you will build a new facility and decommission the present one, does raise questions about your planned Nuclear Engineering Teaching Laboratory (NETL) staffing levels.
At the present pace of operations, a staff including only two licensed operators who also perform most of the routine maintenance, and one operator in training is marginal but adequate.
Looking ahead, you need to consider that at least for a while you will continue to operate the present facility while supporting the construction of the new facility. Then, once the new facility is being readied for operations, you will have to have personnel to conduct / supervise testing while readying the present facility for decommissioning.
Finally, your new facility will incorporate a number of enhancements over the present one, including equipment improvements and more accommodations for experiments.
Equipment improvements necessarily lead to increased routine maintenance and improved experiment facilities will probably create a demand for increased operations.
In order to meet the increased demands outlined above and to assure yourselves that you M
,
T e man /tw RCStewart GL able
/J liardo n
,
'
fa /4 /86 C/V/86 6 / 4 /86'
b/ /86 ()!
'
8606090188 860604-I l PDR ADOCK 00000192
,
G PDR
-
-
-
.
,
- - - - - _-
. -... _,.
. -
... -,, _ - -. - - -,
... - - -
...
.. -
-
- -
-
-
'
.-
b
. University.of Texas-2-
!
will have the resources to properly implement your commitments to the NRC NETL staffing for the near future should be closely evaluated.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
i y%nalSigney l
@a f. Hall J. E. Gagliardo, Chief Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report I-50-192/86-01
'
50-602/86-01 cc w/ enclosure:
{
University of Texas i
College of Engineering
Department of Mechanical Engineering Nuclear Engineering Program ATTN: Tom L. Bauer, Supervisor Reactor Operations Nuclear Reactor Laboratories Austin, Texas 78712 Texas Radiation Control Director
<
bcc to DMB (1E01)
{
bec distrib. by RIV
- RPB R.D. Martin, RA
- J.Luehman DRSP l
- Section Chief (RPB/C)
- RIV File
- EP&RPB RSB
.
- MIS System
- RSTS Operator
- 766 j
h
.
!
l
._- ___,_ _
- _ _. _. _. _ - _ _., - - - _.
. -.
,,., _. _ _ ~. _, -. -. _ _ -. _ - _ _ _
. -. - _.
. _,. _ _ _. _, _.