MFE Log # TXX-88764 File # 10035 5
r
=
i H# ELECTRIC October 31., 19853 e
i Wimse G. Commeil f.secuttw bye bessdens U. S. Nuclear Regulatory Commission Attn: Document Control Desk 31 Washington, D. C.
20555 e
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 IMPLEMENTATION OF ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS) MITIGATION SYSTEM ACTUATION CIRCUlTRY P.EF :
1)
W. G. Counsil letter TXX-6769 to NRC dated October 9, 1987 2)
W. G. Counstl letter TXX-88281 to N9C dated March 18, 1988 t
bentlemen:
a in Reference (1) TV Electric provided its plant specific res the CPSES ATWS Mitigation System Actuation Circuitry (AMSAC)ponse describing which meets the requirements of 10CFR50.62 paragraph (c)(1).
Reference 2 provided additional information on CPSES$s compliance with the AMSAC requirements and an AMSAC implementation schedule of October 31, 1988.
The purpose of this letter is to update the implementation schedule.
TU Electric has reviened and accepted the Westingbrese AMSAC qualification s
documentation and the equipment is onsite.
Installation is currently scheduled to be completed by June 1989, for Unit 1 and by fuel load for Unit 2.
Applicable procedures for each Unit will also be completed prior to each dnits respective implementation date.
i r
Very truly yours, j
f4;V/, h
~
i.
m W. G. Counsil i
VPC/gj I '
t c - Mr. R. D. Martin, Region IV l
[,
Ru ident Inspectors, CPSES (3)
}
h l
h 4
6 r
[
L.
K 445 P