Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- DD-98-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-98-10 Has Expired.Decision Became Final on 981116.With Certificate of Svc.Served on 981120 + (13:01:18, 24 May 2025)
- TAC:65587 + (13:01:27, 24 May 2025)
- 05000423/LER-1998-041, :on 981016,failed to Enter as for Inoperable SG Water Level Channel IAW Tss.Root Cause of Event Is Under Investigation.Failed Circuit Card Was Replaced on 981016 & P-14 Function Was Restored to Operable Status + (13:01:27, 24 May 2025)
- 05000482/LER-1999-005, :on 990512,ESFA Was Noted Due to Loss of Number 7 Transformer.Caused by Intrusion of Raccoon in Switchyard. No Equipment Damage Was Found & Breaker Was Reset + (13:01:46, 24 May 2025)
- 05000289/LER-1999-004, :on 990510,EFW Pump Was Inoperable Longer than Allowed by TSs Due to Lack of Lubrication.Caused by Loose Set Screw Resulting in Bearing Failure.Pump Was Repaired & Returned to Service on 990512 + (13:02:47, 24 May 2025)
- ML20195G373 + (13:02:59, 24 May 2025)
- ML20195G289 + (13:03:24, 24 May 2025)
- L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with + (13:04:03, 24 May 2025)
- ML20195G108 + (13:04:17, 24 May 2025)
- 05000423/LER-1998-040, :on 981017,entry Into TS 3.0.3 Occurred Due to Both Quench Spray Sys Pumps Being Placed in pull-to-lock Position.Caused by Human Error.Operator Involved in Event Removed from Shift & Disciplinary Action Taken + (13:04:22, 24 May 2025)
- ML20195F930 + (13:05:08, 24 May 2025)
- ML20195F910 + (13:05:14, 24 May 2025)
- ML20195F901 + (13:05:16, 24 May 2025)
- L-98-272, Comment on Draft Reg Guide DG-4005, Preparation of Suppl Environ Repts for Applications to Renew Nuclear Power Plant Operating Licenses + (13:05:28, 24 May 2025)
- 05000458/LER-1999-010, :on 990428,inadvertent Breach of Fuel Bldg Integrity Occurred.Caused by Failure to self-check. Administrative Control Was Instituted to Place Control of Door SH-113-01 Under on-shift Operations SS + (13:05:58, 24 May 2025)
- 05000458/LER-1999-011, :on 990510,initiation of Div I DG & ECCS Injection Into Rv Occurred.Caused by Failed,Unsealed Capacitor on Rosemount Trip Unit.Replaced Failed Trip Unit & Evaluated Methods to Reduce Consequences of Same Failures + (13:06:05, 24 May 2025)
- ML20195F354 + (13:07:48, 24 May 2025)
- ML20195F307 + (13:08:04, 24 May 2025)
- ML20195F289 + (13:08:08, 24 May 2025)
- ML20195F270 + (13:08:13, 24 May 2025)
- ML20195F263 + (13:08:15, 24 May 2025)
- L-98-218, Forwards Response & Calculations in Response to 980728 NRC Ltr Which Requested Addl Info Re IPEEE for Bvps,Unit 2 + (13:08:41, 24 May 2025)
- ML20195F177 + (13:08:45, 24 May 2025)
- ML20195F173 + (13:08:47, 24 May 2025)
- ML20195F062 + (13:09:16, 24 May 2025)
- ML20195E917 + (13:09:58, 24 May 2025)
- 05000482/LER-1997-027, :on 971122,missed Surveillance Was Noted.Caused by Improper Circuitry Configuration & Inadequate Procedure. Revised Procedure STS RP-004 & Work Groups Will Discuss PIR 99-1777 + (13:10:59, 24 May 2025)
- IR 05000192/1986001 + (13:11:07, 24 May 2025)
- NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With + (13:12:01, 24 May 2025)
- ML20195E410 + (13:12:51, 24 May 2025)
- ML20195E405 + (13:12:53, 24 May 2025)
- ML20195E373 + (13:13:08, 24 May 2025)
- 05000461/LER-1998-033, :on 981007,inappropriate Clearing of Caution Tagout Resulted in Improved TS LCO 3.4.10 Action A.1 Not Being Met.Caused by Tunnel Vision & Inattention to Detail. New Caution Tagout for Div 2 Shutdown Svc Water,Established + (13:13:42, 24 May 2025)
- 05000361/LER-1998-022, :on 981014,shutdown Cooling Sys Was Inoperable Due to Inadequate Surveillance Test.Caused by Failure to Consider Impact of Total Loop Uncertainty.No Corrective Actions Required + (13:14:18, 24 May 2025)
- 05000266/LER-1998-027, :on 981013,inadequate TS Surveillance Testing of non-essential Svc Water Isolation Logic,Was Identified. Caused by Failure of Existing Test Procedure to Adequately Consider All Postulated Failure Modes.Procedures Changed + (13:15:00, 24 May 2025)
- ML20195D952 + (13:16:28, 24 May 2025)
- 05000341/LER-1998-006, :on 980905,failure of MSIVs to Meet Local Leak Rate Acceptance Criteria Was Noted.Caused by Minor Scale on Seat & Poppet,Linear Indications & Indentations in Nose Cone Area.Repaired & Retested Valves + (13:16:55, 24 May 2025)
- ML20195D853 + (13:18:02, 24 May 2025)
- ML20195D847 + (13:18:07, 24 May 2025)
- ML20195D846 + (13:18:10, 24 May 2025)
- 05000336/LER-1997-037-01, Forwards LER 97-037-01,documenting Event That Occurred at Mnps,Unit 2 on 971126.Suppl Provides Conclusions from Insps & Repairs Conducted in Response to Event + (13:18:16, 24 May 2025)
- TAC:MA0640 + (13:18:28, 24 May 2025)
- L-98-206, Informs of Change in Scheduled Completion Date for Commitment Made in Response to Listed Insp Repts.Safety Culture Training to Operations & Maint Personnel Will Now Be Provided by 990731 + (13:19:01, 24 May 2025)
- NPL-98-0950, Provides 120-day Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment + (13:19:04, 24 May 2025)
- TAC:M98835 + (13:22:16, 24 May 2025)
- ML20195D541 + (13:22:24, 24 May 2025)
- L-98-217, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (13:22:26, 24 May 2025)
- L-98-214, Requests Withdrawal of 981016 LAR 134,permitting Surveillance Interval Specified in SR 4.8.1.1.1.b.Subject Surveillance Was Completed on 981105 Following Unplanned Outage of Plant + (13:22:42, 24 May 2025)
- ML20195D487 + (13:22:46, 24 May 2025)
- ML20195D466 + (13:22:53, 24 May 2025)
- ML20195D381 + (13:23:38, 24 May 2025)