Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000369/1988020 + (04:20:40, 24 May 2025)
- TAC:53463 + (04:21:02, 24 May 2025)
- ML20204G439 + (04:21:37, 24 May 2025)
- ML20204G368 + (04:22:05, 24 May 2025)
- IR 05000602/1988005 + (04:22:40, 24 May 2025)
- TAC:49413 + (04:23:49, 24 May 2025)
- TAC:61256 + (04:24:14, 24 May 2025)
- 05000461/LER-1999-005, :on 990129,inoperability of Standby Gas Treatment Sys Train a Was Noted.Caused by Inadequate Design of Control Circuit.Determined Correct in-rush Current for Itt Barton Actuator NH95 Solenoids + (04:24:20, 24 May 2025)
- ML20204F825 + (04:24:40, 24 May 2025)
- ML20204F785 + (04:24:48, 24 May 2025)
- ML20204F731 + (04:25:00, 24 May 2025)
- ML20204F678 + (04:25:17, 24 May 2025)
- IR 05000237/1987011 + (04:25:34, 24 May 2025)
- IR 05000443/1986014 + (04:25:57, 24 May 2025)
- ML20204F458 + (04:26:31, 24 May 2025)
- ML20204F445 + (04:26:35, 24 May 2025)
- IR 05000423/1988015 + (04:26:46, 24 May 2025)
- ML20204F306 + (04:27:16, 24 May 2025)
- ML20204F205 + (04:31:01, 24 May 2025)
- ML20204F183 + (04:31:08, 24 May 2025)
- ML20204F142 + (04:31:19, 24 May 2025)
- ML20204F131 + (04:31:22, 24 May 2025)
- 05000361/LER-1999-003, :on 990210,discovered That Ccws non-critical Loop Isolation Valves Were Inoperable.Caused by Previously Unrecognized Instrument Air Configuration Anomaly.Design Modifications Were Implemented on Both Units + (04:31:25, 24 May 2025)
- ML20204F087 + (04:31:35, 24 May 2025)
- IR 05000397/1999001 + (04:31:47, 24 May 2025)
- ML20204E953 + (04:32:15, 24 May 2025)
- 05000265/LER-1999-001, :on 990217,unplanned Esfa on Unit 2 When a Channel of RPS Bus de-energized Was Noted.Caused by Failure of Voltage Regulator Transformer (Vrt) That Was Not Included in PM Program.Replaced Control Transformer & Circuit Board + (04:32:21, 24 May 2025)
- ML20204E790 + (04:32:54, 24 May 2025)
- ML20204E737 + (04:33:05, 24 May 2025)
- ML20204E537 + (04:33:46, 24 May 2025)
- ML20204E391 + (04:34:26, 24 May 2025)
- L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements + (04:34:30, 24 May 2025)
- ML20204E372 + (04:34:33, 24 May 2025)
- IR 05000275/1986033 + (04:35:25, 24 May 2025)
- ML20204E152 + (04:35:46, 24 May 2025)
- ML20204D981 + (04:36:19, 24 May 2025)
- ML20204D831 + (04:36:53, 24 May 2025)
- ML20204D689 + (04:37:44, 24 May 2025)
- IR 05000210/1984001 + (04:38:05, 24 May 2025)
- 05000336/LER-1999-004, :on 990211,requirements of TS 3.7.6.1 Were Violated When Water Was Transferred to RCS from Rwst.Caused by Failure to Verify Boron Concentration of Makeup Source Prior to RCS Addition.Briefing to Be Provided to Personnel + (04:38:33, 24 May 2025)
- IR 05000482/1988029 + (04:38:34, 24 May 2025)
- 05000483/LER-1998-001-01, Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability + (04:39:22, 24 May 2025)
- IR 05000298/1978017 + (04:39:58, 24 May 2025)
- ML20204C699 + (04:40:52, 24 May 2025)
- ML20204C475 + (04:41:34, 24 May 2025)
- ML20204C149 + (04:42:24, 24 May 2025)
- IR 05000212/1997001 + (04:42:33, 24 May 2025)
- ML20204B986 + (04:42:51, 24 May 2025)
- IR 05000364/1978012 + (04:43:28, 24 May 2025)
- 05000298/LER-1998-013-01, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl + (04:43:33, 24 May 2025)
- L-99-040, Requests That NRC Document Mailing Labels Be Updated,Per Encl List,Due to Personnel Changes at Plant + (04:43:35, 24 May 2025)