SAFEGUARDS INFORMATION
..
MAR 18 887
Georgia Power Company
ATTN:
Mr. James P. O'Reilly
Senior Vice President - Nuclear
Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-321/86-37 AND 50-366/86-37
Thank you for your responses of January 16 and 30,1987, to our Notice of
Violation issued on December 17, 1986, concerning activities conducted at your
Hatch facility.
We have evaluated your response and found that it meets the
requirements 10 CFR 2.201.
We will examine the implementation of your
corrective actions during future inspections.
After careful consideration of the basis for your request that the violations be
withdrawn, we have concluded for the reasons presented in the enclosure to this
letter that the violations should remain as presented in the Notice of
Violation.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, Safeguards Information is
exempt from public disclosure.
Therefore, the enclosure to this letter will not
be placed in the NRC's Public Document Room.
Should you have any questions about this letter, please contact us.
Sincerely,
Luis A. Reyes, Director
Division of Reactor Projects
i
Enclosure:
'
Staff Assessment of Licensee Response
!
(Safeguards Information)
'
cc w/ enc 1:
J. T. Beckham, Vice President, Nuclear
Operations
H. C. Nix, Site Operations, General
Manager
A. Fraser, Acting Site QA Supervisor
r
l
L. Gucwa, Manager, Nuclear Safety
l
and Licensing
ENCLOSURE CONTAINS
SAFEGU.m0S INFORMATION
bec w/ encl:
(See page 2)
tJPON SEPARATION THIS
PAGE IS DECONTROLLED.
g?832a88cR E88@p
EGUARDS INFORMATIONM
\\
'
SAFEGUARDS INFORMATION
'
MAR 181987
Georgia Power Company
2
bec w/ enc 1:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/o encl:
NRC Resident Inspector
Document Control Desk, 016
State of Georgia
.
RII
I
'
I
--
b JStohr
ATillman:er
re
/
Cli
03/f/87
03//g/87
03/ /B7
03//7 /87
RII
RII
RII.'
FCan
11
VBro
ee
GJ
En0LCSURE CONTAINS
03/jy/87
03/gj/87
03/f/87
- !>.P :CL'AROS INFCFMATION
/
LPOi! SEPARATION Ti!IS
PACE IS DEC0!ITROLLSD.
SAFEGUARDS INFORMATION
j-
Ge$rg;a N*ev Company
,
333 Pecmont Avenue
.
Atlanta. Georg<a 30308
,,
r
'
Teiephone 404 526 6526
t.
tJRCi;GN,_n
i tlan:a Ga'
Ma ong Accress
Nst Office Bos 4545
37 FEB 3
P l: 04
GeorgiaPower
Attanta. Georgia 30302
L T. oucwe
$(-1941
Manager Nuclear safety
0093b
and Ucensing
January 30, 1987
U.S. Nuclear Regulatory Comission
Document Control Desk
ATTN:
Washington, D.C. 20555
NRC 00CKETS 50-321, 50-366
OPERATING LICENSES DPR-57, NPF-5
EDWIN 1. HATCH NUCLEAR PLANT UNITS 1, 2
~
INSPECTION REPORT 86-37
6
1987, in response to I.E.
Inspection
Gentlemen:
it a complete
By our letter dated January 16,
Report 86-37, Georgia Power Company noted our intent to subm
1,
1987.
Due to unforeseen
the Security Plan by FebruaryThe revised plan is scheduled to be
revision to
circumstances, this has been delayed.
submitted by March 31, 1987.
If you have any questions, please contact this office.
.
Sincerely,
4 r.h [G
.
L. T. Gucwa
_
HJB/sjb
U.S. Nuclear Regulatory Commission _
Georgia Powar Company
Dr. J, N. Grace,, Regional Administrator
l
Mr. J. P. O'Reilly
Mr. P. Holmes-Ray, Senior Resident
-
c:
Mr. J. T. Beckham, Jr.
Inspector - Hatch
Mr. H. C. Nix, Jr.
_
g -fl9 N
_
l'
Georg a Nws' Comcam
an Ge ga
,
-
wemum
4
Ma t;r'g Add'955
N5t O't.ce Bos 4$4$
At'aMa Georg a 30302
ENCLOSURE CONTAINS SAFEGUARDS INFORMATIONGeorgia Pbwer
'
UPON SEPARATION THIS PAGE DECONTROLLED
,
L. t ove.,.
Managet Nuctear Safety
and Licens ng
SL-1837
00llb
January 16, 1987
a
U.S. Nuclear Regulatory Commission
w
--
ATTN:
Document Control Desk
,
Washington, D.C. 20555
g
UI?
NRC DOCKETS 50-321,50-366
OPERATING LICENSES DPR-57, NPF-5
EDWIN I. HATCP NUCLEAR PLAN UNITS 1, 2
2
$
"
INSPECTION REPORT 86-37_
fz
..
-
a
M
4-
Gentlemen:
This letter is in response to the Notice of Violation cited in Inspection
Report Nos. 50-321/86-37 and SC-366/86-37, dated December 17, 1986.
The
referenced report relates to an NRC inspection conducted November 17-20,
The inspection covered a broad range of the security operations at the
1986.
plant and resulted in the identiff cation of two . Severity Level V findings.-
.
Georgia Power Company (GPC) has undertaken numercus security improvements
at both Plant Hatch and Plant Vogtie, and at our Corporate office to further
enhance the Nuclear Security Program, as indicated in previous correspondence
and meetings. We specifically wt.sh to note that GPC has created and fully
- staffed a corporate nuclear security organization that monitors and provides
Security Operations.
The recent Regulatory
assistance and direction to Plant:
Effectiveness Review of Plant Hatch, which concentrated - on actual physical
security issues, resulted in a favorable preliminary report on the security
We belfewe this review is but another confirmation of
operation of the plant.our efforts to achieve excellenc:e and the exemplary results a
!
the past year.
Georgia Power Company beliewes that the effort and attention given to
these two minor _ findings and
the related
implications
of perforinance
indicators and noncompliance stat-istics is contrary to effective and eff.icient
regulatory practices inherent im the NRC's Enforcement Policy (10 CFR
2~,
!
Appendix
C).
In
our
view,
neither
of
the
findings
had
safeguards
significance.
The enclosure to
this letter addresses in detail these two
taken by GPC.
In addition, the enclosure
'
minor findings and the actions
describes the reasons which suppcort our request that these two violations be
l
Our request that thesse two proposals be withdrawn is respectfully
l
j
withdrawn.
An affirmative response would reinforce the positive movement our
i
submitted.
nuclear security program has alrenady made.
ENCLOSURE CONTFAINS SAFEGUARDS INFORMATION
UPON SEPARATI0!6N THIS PAGE IS DECONTROLLED
M NI
i
.
- '
..
.
Georgia Power A
ENCLOSURE CONTAINS SAFEGUARDS INFORMATI0f.
UPON SEPARATIWN THIS PAGE 15 DECONTROLLED
U.S. Nuclear Regulatory Commission
January 16, 1987
Page 2
The enclosure to this letter is exempt from disclosure in accordance with
10 CFR 2.790(d) and 10 CFR 73.27.
If you have any questions, please contact
this office.
Sincerely,
ff & =
L. T. Gucwa
JMF/sjb
Enclosure
c: w/o Enclosure
Georgia Power Company
U.S. Nuclear Regulatory Commission ~
Mr. J. P. O'Reilly
Dr. J. N. Grace, Regional Administrator
Mr. J. T. Beckham, Jr.
Mr. P. Holmes-Ray, Senior Resident
Mr. H. C. Nix, Jr.
Inspector - Hatch
_
.
_
_
ENCLOSURE CONTAINS SAFEGUARD INFORMATION
UPON SEPARATIUJN TH15 PAGE 15 ULCUNTRULLED
'
-
-
.
e
. _ .
__ . _ . . _ _ _ . _ . _ _ _ _ _ _ . _ _ . _ , . . . ,
_ . _ _ _ _
_
_. _.
__ . _ _ _ _ _ , _ . _ _ _ . _ _ _ _ _ . . _ _ _ . _ .,
_