IR 05000237/1987011
| ML20204F609 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 03/20/1987 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17199G029 | List: |
| References | |
| NUDOCS 8703260229 | |
| Download: ML20204F609 (2) | |
Text
,
o y
O*O D
MAR 2 01987 Docket No. 50-237 Docket No. 50-249 Commonwealth Edison Company-ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
This refers to the special inspection conducted by members of the resident and regional staff of this office from February 28 through March 4,1987, of the event which occurred on February 27, 1987, regarding exceeding a Technical Specification Limiting Condition for Operation at the Dresden Station, Unit 3 authorized by NRC Operating License No. DPR-25 and to the discussion of our findings with members of your staff during and at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in violation of NRC requirements. We are releasing this report at this time for your information. You will be notified by separate correspondence of our decision regarding enforcement action based on the findings of this inspection. No written response is required until you are notified of the proposed enforcement actions.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC Public Document Room.
,
8703260229 870320
PDR ADOCK 05000237 s\\
\\
O PDR
,95
e
..
.
MAR 201967,,
Comonwealth Edison Company
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
' QRIGINAL SIGNED BY E. G. GREENMAN Charles E. Norelius, Director Division of Reactor Projects Enclosure:
Inspection Report
No. 50-237/87011 DRP
No. 50-249/87010 DRP
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
E. D. Eenigenburg, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector,' RIII
Phyllis Dunton,' Attorney
General's Office, Environmental
Control Division
.g
' ys'
go d
RIII
RIII
Rl5 RI
RIII a
RIII
RIII
^o
RIII # i
f?
ysy
&f4
uy!/k?
RRL) *9%.
f O'nt
i
Dufo
Lar.xs, bury
L Hare
Ring
Warnick6taedore
Ns
Gilles/jp
1.wn