Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210B124 + (20:23:59, 23 May 2025)
- ML20210B113 + (20:24:04, 23 May 2025)
- ML20210B093 + (20:24:11, 23 May 2025)
- ML20210B079 + (20:24:16, 23 May 2025)
- ML20210B067 + (20:24:23, 23 May 2025)
- ML20210B060 + (20:24:26, 23 May 2025)
- ML20210B058 + (20:24:30, 23 May 2025)
- ML20210B054 + (20:24:32, 23 May 2025)
- ML20210B048 + (20:24:34, 23 May 2025)
- ML20210B041 + (20:24:38, 23 May 2025)
- ML20210B026 + (20:24:42, 23 May 2025)
- ML20210B021 + (20:24:44, 23 May 2025)
- ML20210B014 + (20:24:47, 23 May 2025)
- 05000400/LER-1987-002, :on 870102,discovered That Testing of Reactor Protection Sys Logic,Reactor Trip Breaker & Bypass Breaker Not Staggered Properly Per Tech Spec Table 4.3-1.Caused by Personnel Error.Tests Staggered + (20:24:49, 23 May 2025)
- 05000483/LER-1987-002, :on 870403,plant Shut Down Due to Inoperability of Diesel Generator a on 870401 & Fuel Oil Leak on Injector Pump Housing on 870402.Caused by Faulty Control Card plug-in Connections & Crack in Valve + (20:24:50, 23 May 2025)
- ML20210B008 + (20:24:52, 23 May 2025)
- ML20210B002 + (20:24:55, 23 May 2025)
- IR 05000250/1986039 + (20:24:57, 23 May 2025)
- ML20210A988 + (20:25:04, 23 May 2025)
- ML20210A977 + (20:25:13, 23 May 2025)
- 05000374/LER-1987-005-07, :on 870402,diesel Generator 2B Shutdown W/ Control Switch in Auto.Caused by Personnel Errors.Testing Suspended & All Jumpers & Lifted Leads Required by Surveillance Immediately Removed + (20:25:18, 23 May 2025)
- ML20210A970 + (20:25:20, 23 May 2025)
- ML20210A965 + (20:25:22, 23 May 2025)
- IR 05000293/1986044 + (20:25:24, 23 May 2025)
- ML20210A958 + (20:25:27, 23 May 2025)
- 05000397/LER-1986-027, :on 860903,evaluation Concluded That Engineering Criteria Supplied by Burns & Roe,Inc,In Electrical Spec 2808-218 Nonconservative.Procedures Utilizing Faulty Data Will Be Modified + (20:25:29, 23 May 2025)
- ML20210A933 + (20:25:34, 23 May 2025)
- 05000370/LER-1986-015-02, :on 860809,control Area Ventilation & Chilled Water of Trains a & B Tripped.Caused by Blown Fuse & Nonoperating Chiller Starter.Fuse Replaced & Wiring Changes Planned to Correct Problem + (20:25:37, 23 May 2025)
- ML20210A915 + (20:25:41, 23 May 2025)
- ML20210A898 + (20:25:48, 23 May 2025)
- ML20210A891 + (20:25:55, 23 May 2025)
- ML20210A882 + (20:26:00, 23 May 2025)
- ML20210A872 + (20:26:03, 23 May 2025)
- ML20210A868 + (20:26:05, 23 May 2025)
- ML20210A865 + (20:26:06, 23 May 2025)
- 05000458/LER-1999-002, :on 990204,discovered Unanalyzed Air Filters on Containment Unit Coolers.Caused by Station Personnel Error. Root Cause Analysis Will Be Reviewed by Selected Personnel + (20:26:08, 23 May 2025)
- 05000423/LER-1987-017, :on 870329,while Performing Response Time Testing Per Tech Spec 4.3.2.2,several Components Failed to Meet Emergency Safeguards Features Actuation Sys Response Times.Caused by Inadequate Procedures + (20:26:10, 23 May 2025)
- L-99-110, Forwards Changes to ERDS for Unit 1,IAW Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6 + (20:26:21, 23 May 2025)
- 05000370/LER-1999-003-03, :on 990616,inadvertent Actuation of Tdafwp Was Noted.Caused by Failure to Adhere to Policies,Directives or Mgt Procedures.Power Was Restored & Counseling Has Been Provided to Appropriate Individuals Involved in Event + (20:26:26, 23 May 2025)
- ML20210A831 + (20:26:27, 23 May 2025)
- 05000277/LER-1999-005-01, :on 990616,failure to Maintain Provisions of FP Program Occurred.Caused by Less than Adequate Engineering Rigor in Both Development & Review Analysis.Fire Watch Immediately Established.With + (20:26:31, 23 May 2025)
- ML20210A819 + (20:26:34, 23 May 2025)
- 05000278/LER-1999-002, :on 990406,failure to Maintain Alarmed Access Control to Safeguards Sys Vital Area Door Upon Completion of Scheduled Maint Was Noted.Caused by Noncompliance with Procedures.All Security Personnel Have Been Briefed + (20:26:36, 23 May 2025)
- ML20210A796 + (20:26:43, 23 May 2025)
- ML20210A794 + (20:26:44, 23 May 2025)
- ML20210A793 + (20:26:45, 23 May 2025)
- ML20210A777 + (20:27:02, 23 May 2025)
- ML20210A719 + (20:27:22, 23 May 2025)
- ML20210A610 + (20:27:55, 23 May 2025)
- ML20210A589 + (20:28:01, 23 May 2025)
- ML20210A480 + (20:28:26, 23 May 2025)