Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003G305 + (17:25:32, 23 December 2024)
- ML20003G304 + (17:25:34, 23 December 2024)
- IR 05000327/1981009 + (17:25:36, 23 December 2024)
- ML20003G302 + (17:25:39, 23 December 2024)
- ML20003G300 + (17:25:40, 23 December 2024)
- ML20003G298 + (17:25:43, 23 December 2024)
- ML20003G297 + (17:25:45, 23 December 2024)
- ML20003G296 + (17:25:46, 23 December 2024)
- ML20003G295 + (17:25:48, 23 December 2024)
- ML20003G294 + (17:25:50, 23 December 2024)
- ML20003G293 + (17:25:52, 23 December 2024)
- ML20003G292 + (17:25:54, 23 December 2024)
- ML20003G291 + (17:25:56, 23 December 2024)
- ML20003G290 + (17:25:58, 23 December 2024)
- ML20003G289 + (17:25:59, 23 December 2024)
- ML20003G287 + (17:26:01, 23 December 2024)
- IR 05000267/1981002 + (17:26:04, 23 December 2024)
- ML20003G285 + (17:26:06, 23 December 2024)
- ML20003G283 + (17:26:08, 23 December 2024)
- ML20003G282 + (17:26:20, 23 December 2024)
- ML20003G280 + (17:26:22, 23 December 2024)
- ML20003G279 + (17:26:23, 23 December 2024)
- ML20003G277 + (17:26:25, 23 December 2024)
- 05000336/LER-1981-014-03, /03L-0:on 810320,turbine Driven Auxiliary Feedwater Pump Coupling End Pump Packing Failed.Caused by Natural End of Life.Stuffing Box Repacked + (17:27:55, 23 December 2024)
- 05000336/LER-1981-014, Forwards LER 81-014/03L-0 + (17:28:31, 23 December 2024)
- 05000348/LER-1981-010-03, /03L-0:on 810318,diesel Generator 1B Declared Inoperable Following Trip on Overspeed During Surveillance Test FNP-1-STP-28.2.Caused by Blown Fuses in Speed Governor. Fuses Replaced + (17:29:12, 23 December 2024)
- 05000324/LER-1980-102-03, /03L-1:on 801212,full-out Position Indication Could Not Be Achieved W/Rod 26-35 Fully Withdrawn.Caused by Defective Light Isolator,In Rod Group Auxiliary Buffer Board Circuitry,Preventing Switching Transistor from Conducting + (17:31:07, 23 December 2024)
- 05000324/LER-1980-102, Forwards LER 80-102/03L-1 + (17:31:13, 23 December 2024)
- ML20003G267 + (17:31:15, 23 December 2024)
- ML20003G266 + (17:31:17, 23 December 2024)
- IR 05000443/1981001 + (17:31:23, 23 December 2024)
- ML20003G264 + (17:31:27, 23 December 2024)
- ML20003G263 + (17:31:29, 23 December 2024)
- ML20003G262 + (17:31:30, 23 December 2024)
- ML20003G261 + (17:31:31, 23 December 2024)
- ML20003G260 + (17:31:32, 23 December 2024)
- ML20003G258 + (17:31:34, 23 December 2024)
- ML20003G256 + (17:31:35, 23 December 2024)
- ML20003G255 + (17:31:37, 23 December 2024)
- AECM-81-148, Status Rept 1 Re Nonseismic Qualified Ventilation Sys, Providing Environ Cooling of Seismic Qualified Sys,Initially Reported on 810320.Engineering Evaluation of Possible Sys Interactions to Be Completed by 810601.Final Rept by 810814 + (17:31:38, 23 December 2024)
- 05000213/LER-1981-003-03, /03L-0:on 810403,pressurizer Power Operated Relief valve,PR-SOV-570 & Associated Block valve,PR-MOV-569,opened Spuriously,Resulting in Momentary RCS Pressure Decrease. Caused by Connector Loosened from Pressure Controller + (17:32:15, 23 December 2024)
- TAC:10450 + (17:32:17, 23 December 2024)
- ML20003G252 + (17:32:20, 23 December 2024)
- 05000213/LER-1981-003, Forwards LER 81-003/03L-0 + (17:32:23, 23 December 2024)
- ML20003G248 + (17:32:27, 23 December 2024)
- ML20003G247 + (17:32:28, 23 December 2024)
- 05000346/LER-1981-019-03, /03L-0:on 810323,fluctuating Signals W/Numerous Asymmetric Rod Alarms Received,Resulting in Control Rod 4-7 Absolute Position Indication Inoperability.Probably Caused by Electrical Penetration Module Deficiency + (17:32:55, 23 December 2024)
- 05000346/LER-1981-019, Forwards LER 81-019/03L-0 + (17:33:08, 23 December 2024)
- ML20003G243 + (17:33:09, 23 December 2024)
- ML20003G242 + (17:33:12, 23 December 2024)
- ML20003G241 + (17:33:16, 23 December 2024)