ML20003G266

From kanterella
Jump to navigation Jump to search
Responds to Re Possible Nonconservatism of Scram Setpoints for Certain Transients.Util Initiating Analytical Investigation of Problem W/Assistance of B&W.Results of Investigation Expected by 810612
ML20003G266
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/23/1981
From: Hukill H
METROPOLITAN EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8104280626
Download: ML20003G266 (1)


Text

_

Metropolitan Edison Company M

Post Office Box 480 Middfetown, Pennsytvania 17057 Wnter4 Drect Dat Numetr April 23, 1981 M l:#

e QN L1L 098 g

Office of Nuclear Reactor Regulation Atta:

J. F. Stolz, Chief 2?

.j Operating Reactors Branch No. 4 f!

OI N3%

U. S. Nuclear Regulatory Commission J

6, S

Washington, D.C.

20555

Dear Sir:

N n'

  1. ga 3 O Three Mile Island Nuclear Station, Unit 1 (TMI-1) i Operating License No. DPR-50 Docket No. 50-289 Scram Setpoints This letter is in response to your letter of January 14, 1981 concerning the possible non-conservatism of the scram setpoints for certain transients compared to those assumed in the safety analysis.

GPU is initiating an analytical investigation of the problem with the assistance of B&W.

This investigation will determine if the high flux trip setpoint for TMI-1 is affected by the accident-induced neutron flux errors discussed in your letter.

Information from the investigation will either establish that present accident and transient analysis are valid and that the present Techni-cal Specification limits provide as a minimum the original prctective =argin or will define the affect on our plant and define the program and schedule for mitigating the effects of this error. The results of this investigation are expected to be available for submission to the NRC by June 12, 1981.

TMI-1 is now shut down and this analysis would be completed before reactor startup.

If startup is anticipated before resolution of this item then GPU will offer justification of full power operation pending completion of this program.

Sincerely.

.Nykill Director, TMI-l HDH:DGM: lea 81042so(,$

Metrocettan Ec: son Company rs a Memcer of the Geretal Putic U;.!:::es System