ML20003G298

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/81-09 & 50-328/81-08 on 810303-06.No Noncompliance Noted
ML20003G298
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/20/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20003G299 List:
References
NUDOCS 8104280713
Download: ML20003G298 (2)


See also: IR 05000327/1981009

Text

,

h't,

C) p+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

e

3

E

REGION 11

8

101 MA*tlETTA ST., N.W., SulTE 3100

ATLANTA, GEORGIA 30303

g

[4g[3/h H

/

M4R 2 01981

3

f.'

Tennessee Valley Authority

ATTN:

H. G. Parris

-j D 2P198;w --

Manager of Power

94 u 8 ume

-

' *m% " g,

p$

55 u

500A Chestnut Street Tower II

.

Q

Chr.ttanooga, TN 37401

M

Gentlemen:

Subject: Report NosM7/81-0Mng400T28281-DD

'

This refers to the routine inspection conducted by A. B. Ruff of this office on

March 3-6', 1981, of activities authorized by NRC Operating License No. DPR-77 and

Construction Permit No. CPPR-73 for the Sequoyah facility and to the discussion

of our findings held with G. Stack at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selecti u examinations of procedures and representative records, interviews with

perscnnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

l

information identified in the application is contained in a separate part of the

document.

If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

~

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

r

~

l

Q

-

R. C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure:

l

See Page 2

l

\\

l

8104286 7 b

_

-

-

,

MAR 2 01981

~

.

-

Tennessee Valley Authority

2

.

Enclosure:

Iaspection Report Nos. 50-327/81-09

and 50-328/81-08

,

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

-

Superintendant

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

-

Review Staff

H. J. Green, Division Director

.

f

.

e

a

--

.

+

--

-

nn,y

--,7

w - , , ,-- ~, -- --.

pv--...-

x,-,--y

4eyr- - - - - -

4

,,w--,,

y,

ee-.-m

e--+-e-,-em,

,-ee.,-

,r,

-sr-

,----ee,--,.,v

.-

w