ML20003G283

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-267/81-02 on 810126-30 & Notice of Violation
ML20003G283
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/12/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20003G284 List:
References
NUDOCS 8104280679
Download: ML20003G283 (2)


See also: IR 05000267/1981002

Text

-_..

. _ . . . .

-

___z_._._-.

_ _ _ -

___ _

q

  1. "

UNITED STATES

3 .7)

[g

NUCLEAR REGULATORY COMMISSION

./.j

REGION IV

',

?

f

611 RYAN PLAZA DRIVE. SUITE 1000

g,

ARLINGTON, TEXAS 76011

,, ,,

March 12, 1981

gs

-

/o' \\

'

N'

In Reply Refer To:

4

Docket No. 50-267/81-02

L

S

d

S

.

Public Service Company of Colorado

'

p

q

  • y

ATTN: Mr. C. K. Millen

Senior Vice President

<,,

W

P. O. Box 840

Denver, Colorado 80201

.

Gentlemen:

This refers to the inspection conducted by Messrs. J. R. Boardman and

J. P. Jaudon of this office during the period January 26-30, 1981, of activities

authorized by NRC Operating License No. DPR-34 and to their discussions of the

findings with members of your staff at the conclusion of the inspection.

Areas examined during the inspection and the findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

'

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

During this inspection it was found that certain of your activities were not

conducteo in full compliance with NRC requirements.

Consequently, yau are

required to respond to this matter, in writing in accordance with the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with this lette .

In accordance with Section 2.790 e f the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any infonnation that you believe to be proprietary, it is

necessary that you submit a written application to this office within 25 days

of the date of this letter, requesting that such information be withheld from

l

public disclosure.

This application must include a full statement of the

reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

,

'

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

l

04280(nh

..

- .--

..

.

.

_.

.

-

. -

.

.-

_

_.

. . _ . . . .

_ _ ._.

. _ _ _ _

__.__. . _ _

_ _ _ _

,

.

.

.

Public Service Company of Colorado

2

March 12, 1981

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

,

f f?Wa W

G. L. Madsen, Chief

Reactor Projects Branch

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report No. 50-267/81-02

cc w/ enclosures:

D. W. Warembourg, Nuclear Production Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado 80601

L. Brey, Quality Assurance

.