ML20003G290
| ML20003G290 | |
| Person / Time | |
|---|---|
| Issue date: | 03/03/1981 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Tenzer B EBASCO SERVICES, INC. |
| Shared Package | |
| ML20003G288 | List: |
| References | |
| REF-QA-99900505 NUDOCS 8104280689 | |
| Download: ML20003G290 (2) | |
Text
f b c M b i z) :
m, j./
UNITED STATES
[~
Z b ~
NUCLEAR REGULATORY COMMISSION k ',
REGloN IV i
i,,,,[ #
if 611 RY AN PLAZA DRIVE. SUITE 1000
'e ARUNGToN. TEXAS 76011 0 3 MAR 193I Docket No. 99900505/81-01 EBASCO Services, Inc.
ATTN: Mr. B. E. Tenzer, Vice-President Materials Engineering and Quality Assurance Two World Trade Center New York, NY 10048 Gentlemen:
This refers to the inspection conducted by Mr. J. R. Costello of this office on February 2-6, 1981, of your facility at New York, New York, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
Areas examined during this inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an exam-ination of procedures and representative records, interviews with personnel, and observations by the inspectors.
During this inspection it was found that you failed to meet certain commit-ments in your Topical Report No. ETR-1001.
The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within 25 days of the date of this letter a written state-ment containing (1) a description of any steps that have been or will be taken to correct these items, (2) a description of any steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventative measures were or will be completed.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
l Part 2 Title 10, ', ode of Federal Regulations, a copy of this letter and your reply toge or with the enclosed inspection report will be placed in the Commissi.1's Public Document Room.
If this report contains any infomation that you believe to be proprietary, it is necessary that you make a written application to this office within 25 days of the date of this letter to withhold such information from public disclosure.
Any such acoli-l cation must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so 8104280b l
a EBASCO Services, Inc.
2 that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
.(
dbV.,
hils t f Uldis Potapovs, Chie,f Vendor Inspection Branch
Attachment:
1.
Notice of Nonconformance 2.
Inspection Report No. 99900505/81-01