Text
,_.
e nea UNITED STATES
/
\\'7.
NUCLEAR REGULATORY COMMISSION l
v!
waswincTom.o.c. zoons
.g
~+...../
GEORGIA POWER COMPANY g
OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50 321, EDWIN I. HATCH NUCLEAR PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 83 License No. DPR-57 1.
The Nuclear Regulatory Commission (the Commission) has found that:
lication)
The filing (which is being handled by the Commission as an ah 28. 1980, A.
(the licensee) dated M by the Georgia Power Company,'et al.ith the standards and requirements 14, 1980, complies w as revised July of the Atomic Energy Act of 1954, as amended (the Act), and the Com-mission's rules and regulations set, forth in 10 CFR Chapter I; The facility will operate in conformity with the application, 2
B.
the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (1) that the activities authorized C.
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the comon D.
defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part E.
51 of the Commission's regulations and all applicable requirements have been satisfied.
6 810428 c %%
l
2.
Accordingly, Facility Operating License No. DPR-57 is hereby amended by revising in its entirety paragraph 2.C.(4) (Security Plan) to read as follows:
2.C.(4)
Physical Protection The licensee shall fully implement and maintain in effect all provisions of the following Comission-apprtved doctments, l
including amendments and changes made pursuant to the authority l
of 10 CFR 50.54(p). These approved documents consist of infor-nation withheld from public disclosure pursuant to 10 CFR 2.790(d):
(a) " Hatch Nuclear Plant Physical Security Plan", dated November 18, 1977, as revised by Revision 1 dated May 19, 1978 Revision 2 dated January 12, 1979, and further revised by inclusion ~of a Safeguards Contingency Plan, sthmitted by letter of May 14, 1980. The Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b).
i) " Hatch Nuclear Plant Guard Training and Qualification Plan",
dated May 1980, as revised July 1980. This Plan shall be followed, in accordance with 10 CFR 73.55(b)(4), 60 days after approval by the Comission. All security personnel, as required in the above plans, shall be qualified within two years of this approval. The licensee may make changes to this plan without prior Comission approval if the changes do not decrease the safeguards effectiveness of the plan. The licensee shall maintain records of and submit reports con-cerning such changes in the same manner as required for changes made to the Security Plan and Safeguards Contingency Plan pursuant to 10 CFR 50.54(p).
3.
This license amendment is effective as of its date of issuance.
l FOR THE NUCLEAR REGULATORY C0tNISSION h
F. Stolz, Chief 0 rating Reactors Branch #4 Division of Licensing Date of Is:6uance: April 20,1981 l
j# "*%
UNITED STATES O
1 NUCLEAR REGULATORY COMMISSION 3
.g wasMINGTON. D. C. 20656 u
e
/
g GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50- q EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Am' ndment No. 24 e
License No. NPF-5 1.
ihe Nuclear Regulatory Commission (the Comission) has found that:
A.
The filing (which is being handled by the Commission as an apf 28 lication) by the Georgia Power Company,'et al.,th the standards and requirem,ents (the licensee) dated Ma
- 1980, as revised July 14, 1980, complies wi of the Atomic Energy Act of 1954, as amended (the Act), and the Com-mission's rules and regulations set, forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, 2
the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
e
-,f-
--..-,-..y.-.,-,
s,-
w.m.
,,_,.,.,..e.,.,_.,
m,,,,
r
.--,e,-
. Accordin0 y, Facility Operating License No. NPF-5 is hereby amended l
2.
by revising in its entirety paragraph 2.D. (Security Plan) to read as follows:
2.D.
Physical Protection The licensee shall fully implement and maintain in effect all provisions of the following Comission-approved docimients, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p). These approved docurients consist of infor-mation withheld from public disclosure pursuant to 10 CFR 2.790(d):
(1) " Hatch Nuclear Plant Physical Security Plan", dated November 18, 1977, as revised by Revision 1 dated May 19, 1978, Revision 2 dated January 12, 1979, and further revised by inclusion of a Safeguards Contingency Plan, sthmitted by letter 'of May 14, 1980. The Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b).
(2) " Hatch Nuclear Plant Guard Training and Qualificatien Plan",
dated May 1980, as revised July 1980. This Plan shall be
~
followed, in accordance with 10 CFR 73.55(b)(4), 60 days after approval by the Comission. All security personnel, as required in the above plans, shall be qualified within two years of this approval. The licensee may make changes to this plan without prior Comission approval if the changes do not decrease the safeguards effectiveness of the plen. The licensee shall maintain records of and submit reports cos.-
cerning such changes in the same manner as required for changes made to the Security Plan and Safeguards Contingency Plan pursuant to 10 CFR 50.54(p).
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY C0tNISSION r
hn F. Stolz, f
rating Reactors Branch #4 Division of Licensing.
Date of Issuance: April 20,1981 4
_. -. _ _. _. _ _ _ ~..__., _ _. _ _ _, _ _ _ _, _,. _ _. _ _ _., -. _ _ _.. _ _.. _. -.. _. _ _. _ _ _ _
-