Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1981-041, Forwards LER 81-041/03L-0.Detailed Event Analysis Encl + (13:09:48, 21 December 2024)
- 05000311/LER-1981-037-03, /03L-0:on 810608,paper Filter Drive for Containment Particulate Channel 2R11A Failed.Caused by Failure of Racket Arm Link on Filter Drive Mechanism.Link Replaced + (13:09:49, 21 December 2024)
- 05000261/LER-1981-016, Forwards LER 81-016/03L-0 + (13:09:51, 21 December 2024)
- BSEP-80-1263, RO 2-84-55:anchor Bolt Testing Required by IE Bulletin 79-02 Not Performed on Control Rod Drive Piping.Caused by Unusual Arrangements for Installation of Piping.Anchor Bolt Repairs & as-built Verifications Table Done + (13:09:52, 21 December 2024)
- 05000324/LER-1981-055-03, /03L-0:on 810614,during Test,Diesel Generator 1 Started,Then Immediately Tripped W/Concurrent Opening of Diesel Generator Output Breaker.Caused by Resistor AE8 Shorting to Ground.Resistor Replaced + (13:09:54, 21 December 2024)
- 05000369/LER-1981-090, Forwards LER 81-090/03L-0.Detailed Event Analysis Encl + (13:09:56, 21 December 2024)
- ML20009G103 + (13:09:57, 21 December 2024)
- BSEP-81-1259, Clarifies Event Previously Reported as LER (2-81-56)per 810618 Telcon.Facility in Compliance W/Ieee 279-1971.No Reportable Event Determined.Ler Number Referenced Will Be Reassigned as Appropriate + (13:09:58, 21 December 2024)
- ML20009G100 + (13:10:00, 21 December 2024)
- ML20009G099 + (13:10:01, 21 December 2024)
- ML20009G098 + (13:10:02, 21 December 2024)
- ML20009G097 + (13:10:03, 21 December 2024)
- ML20009G095 + (13:10:03, 21 December 2024)
- 05000324/LER-1981-055, Forwards LER 81-055/03L-0 + (13:10:04, 21 December 2024)
- 05000311/LER-1981-037, Forwards LER 81-037/03L-0.Detailed Event Analysis Encl + (13:10:06, 21 December 2024)
- ML20009G090 + (13:10:07, 21 December 2024)
- 05000324/LER-1981-056-01, /01T-0:on 810624,notification Received That 38 Pipe Supports Would Have Failed During Design Basis Seismic Event.Caused by Higher than Normal Slenderness Ratio. Identified Supports Upgraded + (13:10:08, 21 December 2024)
- 05000369/LER-1981-081-03, /03L-0:on 810508,while in Mode 5,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level at 0.25 Ft Above Slab Elevation.Level Checked & Alarm Cleared + (13:10:10, 21 December 2024)
- 05000287/LER-1981-013-03, /03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room + (13:10:12, 21 December 2024)
- ML20009G086 + (13:10:13, 21 December 2024)
- ML20009G085 + (13:10:14, 21 December 2024)
- 05000309/LER-1981-081, Forwards LER 81-081/03L-0.Detailed Event Analysis Encl + (13:10:15, 21 December 2024)
- 05000324/LER-1981-056, Forwards LER 81-056/01T-0 + (13:10:17, 21 December 2024)
- ML20009G080 + (13:10:18, 21 December 2024)
- 05000287/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl + (13:10:20, 21 December 2024)
- 05000369/LER-1981-080-03, /03L-0:on 810508,while in Mode 5,initial Fuel Loading,Both Trains of RHR Sys Were Inoperable.Caused by Failure of Personnel to Prevent Entering of Mode 5 W/O RHR Train B Operable.Operating Procedure Will Be Written + (13:10:21, 21 December 2024)
- ML20009G076 + (13:10:24, 21 December 2024)
- IR 05000213/1981007 + (13:10:25, 21 December 2024)
- TXX-3373, Forwards Test Procedure to Qualify Protective Envelope Sys to Protect Redundant Essential Electrical Cables at Comanche Peak Steam Electric Station + (13:10:26, 21 December 2024)
- ML20009G071 + (13:10:29, 21 December 2024)
- AECM-81-232, First Status Rept on Potentially Reportable Deficiency Re Failure of Test Connection Pipe Off HPCS Injection Line on Containment Side of Injection Valve,Initially Reported on 810527.Investigation Ongoing.Final Rept Expected by 811029 + (13:10:33, 21 December 2024)
- 05000369/LER-1981-080, Forwards LER 81-080/03L-0.Detailed Event Analysis Encl + (13:10:35, 21 December 2024)
- ML20009G066 + (13:10:36, 21 December 2024)
- IR 05000412/1981005 + (13:10:38, 21 December 2024)
- BSEP-81-0945, Ro:On 810506,investigation on RHR Heat Exchangers Determined That B Heat Exchanger Baffle Was Deformed at Bottom Allowing Bypass Flow.Cause Being Evaluated.Repairs on 2B RHR Heat Exchanger in Progress + (13:10:39, 21 December 2024)
- ML20009G064 + (13:10:39, 21 December 2024)
- BSEP-81-1271, Confirms 810625 Conversation Between CS Bohanan & R Butcher Re United Engineers & Constructors,Inc Notification That 38 Control Rod Driveline Gang Pipe Supports Would Fail in as-built Condition During Design Seismic Event + (13:10:41, 21 December 2024)
- ML20009G061 + (13:10:43, 21 December 2024)
- ML20009G058 + (13:10:44, 21 December 2024)
- ML20009G057 + (13:10:44, 21 December 2024)
- ML20009G054 + (13:10:47, 21 December 2024)
- ML20009G053 + (13:10:48, 21 December 2024)
- ML20009G052 + (13:10:48, 21 December 2024)
- 05000259/LER-1981-031-03, /03L-0:on 810610,discovered That Eight Level Switches Would Not Operate During Maint on Scram Accumulator.Caused by Excessive Amounts of Substance on Switch Float & Guide Stem,Causing Float to Stick + (13:10:51, 21 December 2024)
- ML20009G046 + (13:10:53, 21 December 2024)
- 05000259/LER-1981-031, Forwards LER 81-031/03L-0 + (13:10:54, 21 December 2024)
- ML20009G043 + (13:10:55, 21 December 2024)
- 05000369/LER-1981-091-03, /03L-0:on 810530,peak Shock Annuciator Amber Light Observed On.Caused by Light Reed Switch from Triaxial response-spectrum Recorder Making Contact.Reed Switch Adjusted,Tested & Delared Operable + (13:10:56, 21 December 2024)
- L-81-316, Final Deficiency Rept Re Protuberance on Local Control Station Switches Supplied by Gould Rundel,Initially Reported 810625.Purchase Spec Revised to Specify Contact Maint During Position Change + (13:10:57, 21 December 2024)
- ML20009G040 + (13:10:59, 21 December 2024)
- 05000338/LER-1981-034-03, /03L-0:on 810627,quadrant Power Tilt Ratio Indicated Tilt in Excess of 1.02 During Power Escalation. Caused by Control Rods Being Inserted Lower in Core than Desired While Increasing Reactor Power to 100% + (13:11:00, 21 December 2024)